Connecticut General Statutes homeSearch Connecticut
Conn. Gen. Stat.Title 49 — Mortgages and LiensChapter 847 — Liens

Conn. Gen. Stat. § 49-34 (2025)

Certificate of lien to be recorded and notice given to owner

Edition and currency
laws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026) cited 1960–2025 57citing cases
At a glance

Courts have cited this section in 57 opinions since 1960, 4 of them in the last five years. The most litigated part is subsection (1)(C) (2 cases).

A mechanic's lien is not valid unless the person performing the services or furnishing the materials (1) within ninety days after he has ceased to do so, lodges with the town clerk of the town in which the building, lot or plot of land is situated a certificate in writing, which shall be recorded by the town clerk with deeds of land, (A) describing the premises, the amount claimed as a lien thereon, the name or names of the person against whom the lien is being filed and the date of the commencement of the performance of services or furnishing of materials, (B) stating that the amount claimed is justly due, as nearly as the same can be ascertained, and (C) subscribed and sworn to by the claimant, and (2) not later than thirty days after lodging the certificate, serves a true and attested copy of the certificate upon the owner of the building, lot or plot of land in the same manner as is provided for the service of the notice in section 49-35.

(1949 Rev., S. 7218; P.A. 74-310, S. 2; P.A. 75-418, S. 1, 10; P.A. 76-290, S. 1, 6; P.A. 79-602, S. 87; P.A. 81-8, S. 8, 9; P.A. 85-501, S. 8; P.A. 03-224, S. 6.)

History: P.A. 74-310 added reference to lots or plots of land; P.A. 75-418 required that copy of certificate be filed upon owner of building or land; P.A. 76-290 required that certificates contain name or names of person against whom lien is being filed, specified that copy may be served on owner of building or land before certificate is lodged and deleted provision re filing of certificate by executor or administrator when party who might have filed it dies before doing so; P.A. 79-602 restated provisions but made no substantive changes; P.A. 81-8 increased the time limit on the service of a copy of the certificate from 7 to 30 days after lodging the certificate; P.A. 85-501 extended time for filing of certificate from 60 to 90 days; P.A. 03-224 deleted “within the same time, or prior to the lodging of the certificate but” in Subdiv. (2) and made technical changes, effective July 2, 2003.

See Sec. 7-28 re indexing of mechanic's lien by town clerk.

An innocent overstatement of the amount of the claim will not invalidate the certificate. 18 C. 349; 39 C. 354; 51 C. 440. One certificate may embrace two distinct jobs. 23 C. 567. The description of the premises must be substantially accurate. 29 C. 266; 30 C. 473. If, after the work is substantially done, there is an unreasonable delay in completing it, any work done after such delay will not be considered in computing the 60 days for recording the lien. 41 C. 510; Id., 617; 46 C. 296; 68 C. 35. Delay held not unreasonable. 99 C. 403. Lienor not held to date of completion stated in lien, but may prove completion at any time within 60 days before filing of certificate. 46 C. 296. The written assent of the owner to the subcontractor's contract need not be in any particular form. 71 C. 95. Overstatement of amount due. 80 C. 392. Purpose of statute; estoppel by recital as to date lien attaches. 71 C. 95. To be liberally construed; 78 C. 475; to effectuate its purpose. 89 C. 520; 99 C. 403. Policy requiring recording. 82 C. 306. Certificate where materials furnished for adjoining buildings. 42 C. 292; 44 C. 349; 76 C. 382; 78 C. 475; 89 C. 527; Id., 554; 91 C. 169; Id., 712. Precise statement as to amount of materials not necessary. 76 C. 382. Honest mistake as to quantity of land will not invalidate lien; 89 C. 524; or as to amount due. 91 C. 170. Time when subcontractor must file lien; effect of filing while services being rendered. 82 C. 298; Id., 304. When certificate filed, lien dates back to beginning of rendering services, as regards mortgage or sale of land. 80 C. 392; 87 C. 316. Time for recording certificate begins to run when work substantially completed. 90 C. 651. Cited. 113 C. 10; 116 C. 275. Error in describing subcontractor as contractor did not invalidate lien. 118 C. 615. Notice of intent to claim a lien may be served on owner after recording of certificate of lien under section. 147 C. 351. Cited. 168 C. 371; 169 C. 76; 172 C. 1. Certificate of lien must be served on all owners as of date of filing lien, not just on developer with whom work was contracted. 177 C. 295. Cited. 180 C. 501; 181 C. 592. Notice sent under statute was sufficient to also satisfy requirements of Sec. 49-35(a). 185 C. 549. Challenge by general contractor to constitutionality of mechanic's lien statutes discussed. Id., 583. Cited. 210 C. 511; 219 C. 810; 224 C. 563; 230 C. 24. Statute substantially complied with and mechanic's lien held valid; judgment of Appellate Court in 31 CA 15 reversed. 230 C. 807. Work done at request of owner will extend time for filing certificate of lien past the date of substantial completion. 247 C. 234. “Subscribed and sworn to” requirement in Subdiv. (1)(C) requires that claimant executing mechanic's lien sign the lien at the end and take part in an oath ceremony in which claimant swears to the truth of facts set forth in the lien, and further, that there be evidence in the lien, such as a jurat, confirming administration of the oath by a notary public or commissioner of the Superior Court, and section does not require affidavit or similar writing, or written recital of claimant's oath. 280 C. 672.

Cited. 1 CA 169; 5 CA 106; 8 CA 83; 27 CA 199; 31 CA 15; judgment reversed, see 230 C. 807; Id., 485; 37 CA 547; 44 CA 240. Trivial work after substantial completion will not extend time for filing lien. 47 CA 265. “Owner” as used in section means only the owner at time of service of certificate of lien because, at that time, it is only that owner who possesses adversely affected property rights, and, consequently, has right to a hearing designed to protect those rights. 99 CA 690. Inspection, removal and replacement of materials in response to owner's complaints of deficient work constitutes “services” for purposes of time for filing mechanic's lien. 126 CA 18. Error in commencement date listed on lien certificate did not invalidate lien in absence of evidence of a fraudulent intent or prejudice to defendant. 136 CA 184.

A defective mechanic's lien may be reformed to correct a mistaken date of completion if no one is injured. 7 CS 456. Cited. 13 CS 197; 15 CS 360; 20 CS 460. Reformation of a mechanic's lien is legally impossible unless there is mutual mistake or unilateral mistake coupled with fraud or inequitable conduct. 22 CS 230. “Sworn to” implies subscriber has declared on oath the truth of statement to which his name is subscribed; certificate which merely recites claimant “acknowledges” execution of lien is insufficient. 23 CS 298. Cited. Id., 380; 27 CS 203; 33 CS 552; 42 CS 460.

Trivial work after substantial completion will not extend time for filing. 2 Conn. Cir. Ct. 365. If, at time of abandonment of construction contract by contractor, no money is due contractor from owner, contractor is not entitled to mechanic's lien and subcontractor is likewise not entitled to a lien unless he can show both a timely filing of a certificate of lien by him and that there was an unlawful prepayment by owner to contractor. Id., 622. That lien was invalid is no defense to action by lienor against escrow agent for breach of his agreement to hold release of said lien in escrow until thousand dollars was delivered to lienor; validity of lien is irrelevant since action is against escrow agent and not obligee. 5 Conn. Cir. Ct. 95. Cited. Id., 349.

Subdiv. (1):

Subpara. (C): Must include written oath. 210 C. 511. Subpara. (A) cited. 235 C. 595.

The 20 cases that cite Conn. Gen. Stat. § 49-34 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENStone-Krete Constr., Inc. v. Eder, 911 A.2d 300 (Conn. 2006).
cites § 49-34 25×cited by 53 cases
Where it cites § 49-34
“The defendant contends that the trial court improperly concluded that the mechanic’s lien complied with the “subscribed and sworn to” requirements of General Statutes § 49-34 (1) (C) 1 because the hen did not contain a written recital of an oath swearing to the truth of the…”
The case’s holding
A mechanic's lien satisfies the statutory requirement that it be subscribed and sworn to when a jurat certifies that the claimant took an oath, without a written recital of the oath.
Later courts cite it for
“in the construction of the statutes, words and phrases shall be construed according to the commonly approved usage of the language . . . .” · 2 citing courts
2
GREENLouis Gherlone Excavating, Inc. v. McLean Constr. Co., 871 A.2d 1057 (Conn. App. Ct. 2005).
cites § 49-34 36×subsections: (1)(C)cited by 8 cases
Where it cites § 49-34
“, claims that the trial court improperly dismissed the action by concluding that the mechanic's lien was defective on its face because there was no verification of the truth of the statements contained in it, as required by General Statutes § 49-34. [1] Although a *1060 trial…”
3
GREENRed Rooster Constr. Co. v. River Assocs., Inc., 620 A.2d 118 (Conn. 1993).
cites § 49-34 16×cited by 65 cases
Where it cites § 49-34
“Red Rooster claims that the trial court improperly concluded that: (1) the bank, as a mortgagee of the property, was an owner of the property pursuant to General Statutes § 49-34 2 and was thereby entitled to notice of the filing of the lien; (2) there was no evidence that Red…”
The case’s holding
A mechanic's lien is invalid if the claimant fails to perform the statutory ceremony of an oral oath or specific sworn statement required for a valid oath.
Later courts cite it for
“a long-standing rule of statutory construction is that if a statute makes use of words that have an accepted meaning at the common law they ought, in the absence of other controlling reasons, to be expounded and received with that meaning.” · 2 citing courts
4
GREEN36 DeForest Avenue, LLC v. Creadore, 915 A.2d 916 (Conn. App. Ct. 2007).
cites § 49-34 21×cited by 12 cases
Where it cites § 49-34
“The plaintiff claims on appeal that the court improperly concluded that there was probable cause to sustain the validity of the lien because it was not (1) timely filed or (2) properly served on the prior owner of the property as required by General Statutes § 49-34. 1 The…”
5
cites § 49-34 18×cited by 32 cases
Where it cites § 49-34
“It argues that the mechanic’s lien is valid under General Statutes § 49-34 10 because the certifi *815 cate of mechanic’s lien was indexed correctly in the land records and was within the chain of title, and because the certificate, as recorded, referred to the omitted Exhibit A.”
The case’s holding
A mechanic's lien remains valid despite an inadvertent omission of the property description if the error was made in good faith and provides sufficient notice to reasonable searchers.
Later courts cite it for
“in order to achieve the remedial purposes of the . . . statutes.” · 3 citing courts
6
cites § 49-34 15×cited by 47 cases
Where it cites § 49-34
“The sole issue in this appeal is whether the provision in General Statutes § 49-34 (1) (C), directing that a certificate of mechanic’s lien be sworn to by the claimant, requires a written recital of the oath-taking on the certificate.”
The case’s holding
A mechanic's lien certificate is invalid if it lacks a written recital of the oath required by statute despite the policy of liberally construing such certificates.
Later courts cite it for
“in accordance with this policy, our courts have been liberal in validating liens despite claimed errors on the face of the lien certificate where the mistake was made in good faith and no resulting prejudice was claimed.” · 3 citing courts
7
GREENH & S Torrington Assocs. v. Lutz Eng'g Co., 441 A.2d 171 (Conn. 1981).
cites § 49-34 9×cited by 61 cases
Where it cites § 49-34
“In this appeal the parties are contesting the notice required by General Statutes §§ 49-34 1 and 49-35 2 to be served upon the property owner in order to validate a mechanic’s lien.”
The case’s holding
Mechanic's lien statutes should be liberally construed to reasonably and fairly implement their remedial intent.
Later courts cite it for
“purpose of the mechanic's lien is to give one who furnishes materials or services 'the security of the building and land for the payment of his claim by making such claim a lien thereon” · 8 citing courts
8
GREENPapa v. Greenwich Green, Inc., 416 A.2d 1196 (Conn. 1979).
cites § 49-34 13×cited by 20 cases
Where it cites § 49-34
“as required by” General Statutes § 49-34, as amended by § 1 of Public Acts 1975, No.”
Later courts cite it for
“when an individual's property right might be adversely affected and where he has a constitutional prerogative to a timely hearing, such an individual should be provided with a fair and suitable notice of the recording of a mechanic's lien against that property.” · 3 citing courts
9
GREENRollar Constr. & Demolition, Inc. v. Granite Rock Assocs., LLC, 891 A.2d 133 (Conn. App. Ct. 2006).
cites § 49-34 7×cited by 21 cases
Where it cites § 49-34
“General Statutes § 49-34 provides in relevant part: “A mechanic’s lien is not valid unless the person performing the services or furnishing the materials .”
Later courts cite it for
“in the absence of an adequate record, we presume that the trial court, in rendering its judgment undertook the proper analysis of the law and the facts.” · 2 citing courts
10
GREENState v. Colon, 644 A.2d 877 (Conn. 1994).
cites § 49-34 9×cited by 25 cases
Where it cites § 49-34
“, required us to interpret the edict of General Statutes § 49-34 that a certificate of mechanic’s lien be “subscribed and sworn to by the claimant.”
The case’s holding
An omitted or unsigned jurat does not invalidate an otherwise valid search warrant when extrinsic evidence shows the supporting affidavit was actually sworn; the four corners rule does not apply.
Later courts cite it for
“although probable cause must be determined from the four corners of the warrant, we are not confined to the four corners of the warrant in determining whether the affidavit in support of probable cause has been validly executed.” · 3 citing courts
11
GREENFarmers & Mechanics Sav. Bank v. Garofalo, 595 A.2d 341 (Conn. 1991).
cites § 49-34 8×cited by 28 cases
Where it cites § 49-34
“Lyon & Billard maintains that § 52-285 should be interpreted to afford to judicial liens the same treatment as that afforded to recorded mortgage deeds pursuant to General Statutes § 47-10 5 *816 and to recorded mechanic’s liens pursuant to General Statutes §§ 49-34 6 and 49-33…”
The case’s holding
An attachment lien on real property relates back for priority purposes only to the moment the certificate of attachment is filed with the town clerk.
Later courts cite it for
“under general statutes 52-285, an attachment that is subsequently transformed into a judicial lien following a judgment in the underlying cause of action relates back, for purposes of determining priority, only to the moment when the certificate of attachment is left at the town clerk's office of the town where the property is located.” · 2 citing courts
12
GREENF. B. Mattson Co. v. Tarte, 719 A.2d 1158 (Conn. 1998).
cites § 49-34 8×cited by 24 cases
Where it cites § 49-34
“The Appellate Court concluded that, as a matter of law, the plaintiff had ceased work on October 3, 1995, the date of substantial completion and, consequently, that the plaintiff had failed to satisfy the requirement under General Statutes § 49-34 1 that a mechanic’s lien…”
The case’s holding
When a contractor performs services at the owner's request after substantial completion, the ninety-day period to file a mechanic's lien runs from the date of those later services.
13
GREENSeaman v. Climate Control Corp., 436 A.2d 271 (Conn. 1980).
cites § 49-34 4×cited by 71 cases
Where it cites § 49-34
“"When Branford and Climate Control notified Seaman of their intentions to file mechanic’s liens pursuant to General Statutes § 49-33 2 see General Statutes §§ 49-34 and 49-35; Seaman Construction Co.”
The case’s holding
A second-tier subcontractor is subrogated to the rights of the general contractor rather than the first-tier subcontractor for purposes of establishing a mechanic's lien.
Later courts cite it for
“had the legislature wished to limit, . . the rights of second tier subcontractors to obtain liens against the owner, it would have been easy enough for the supreme court of nevada 14 (0) 1947a legislature to link the subcontractor's claim to the person with whom such subcontractor shall have contracted.” · 4 citing courts
14
GREENPomarico v. Gary Constr., Inc., 497 A.2d 70 (Conn. App. Ct. 1985).
cites § 49-34 6×cited by 23 cases
Where it cites § 49-34
“The trial court further found that since the defendant had removed its equipment and ceased working in the middle of December, 1982, work thereafter demanded of the defendant by the city inland wetland agency, which was concluded on January 14,1983, did not toll the sixty day…”
The case’s holding
Site development work benefiting an entire residential subdivision is lienable under the amended mechanic's lien statute without showing it was incorporated into a particular building.
15
GREENPROBUILD EAST, LLC v. Poffenberger, 45 A.3d 654 (Conn. App. Ct. 2012).
cites § 49-34 8×cited by 6 cases
Where it cites § 49-34
“The defendant claims that the court improperly determined that (1) the plaintiffs mechanic’s lien was valid in accordance with General Statutes § 49-34, (2) alienable fund existed where the general contractor was paid the contract price in full and (3) a lienable fund existed…”
16
GREENNew England Sav. Bank v. Meadow Lakes Realty Co., 706 A.2d 465 (Conn. 1998).
cites § 49-34 6×cited by 18 cases
Where it cites § 49-34
“According to McDonald-Sharpe, the lien properly described the premises on which the work was performed pursuant to General Statutes § 49-34. McDonald-Sharpe argue [d] that its lien described both the front and rear parcels, and that both parcels comprised the 225 acre ‘plot of…”
17
GREENSanta Fuel, Inc. v. Varga, 823 A.2d 1249 (Conn. App. Ct. 2003).
cites § 49-34 3×cited by 12 cases
Where it cites § 49-34
“General Statutes § 49-34 provides in relevant part: “A mechanic’s lien is not valid, unless the person performing the services or furnishing the materials .”
18
GREENKopylec v. Town of North Branford, 23 A.3d 51 (Conn. App. Ct. 2011).
cites § 49-34 4×cited by 6 cases
Where it cites § 49-34
“, General Statutes § 49-34 (mechanic's liens); General Statutes § 52-380a (judgment liens).”
19
GREENCianci v. Originalwerks, LLC, 16 A.3d 705 (Conn. App. Ct. 2011).
cites § 49-34 8×cited by 2 cases
Where it cites § 49-34
“On appeal, the plaintiff claims that the trial court (1) misapplied the law in determining the amount of debt claimed by the defendant and (2) improperly concluded that the defendant filed its lien in a timely manner pursuant to General Statutes § 49-34. 1 We affirm the judgment…”
20
GREENCornelius v. Rosario, 51 A.3d 1144 (Conn. App. Ct. 2012).
cites § 49-34 2×cited by 13 cases
Where it cites § 49-34
“2d 812 (1994) (mechanic’s lien valid against subsequent encumbrancer despite failure strictly to comply with notice requirement of General Statutes § 49-34 where mistake was made in good faith and no prejudice resulted); Aetna Casualty & Surety Co.”
The case’s holding
A tax collector satisfies statutory and due process notice requirements by taking reasonable additional steps after undeliverable notice; unrecorded interests need not receive individual notice of a tax sale.

Show all 57 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
196019922025

One bar per 2 years. Tallest: 8 cases in 2006–2007. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Conn. App. Ct.32Conn.17Conn. Super. Ct.3Bankr. D. Conn.3D. Conn.2
By subsection
(1)(C)2 cases
Louis Gherlone Excavating, Inc. v. McLean Constr. Co., 871 A.2d 1057 (Conn. App. Ct. 2005).“, claims that the trial court improperly dismissed the action by concluding that the mechanic's lien was defective on its face because there was no verification of the truth of the statements contained in it, as required by General Statutes § 49-34. [1] Although a *1060 trial…”
Stone-Krete Const. Inc. v. Eder, 911 A.2d 300 (Conn. 2006).

Show all 57 citing cases (list view) →

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: laws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026). Syfert holds no earlier or later version of this section.

Connecticut General Statutes Home  |  Search Connecticut  |  Search cases for this section  |  syfert.com