Connecticut General Statutes homeSearch Connecticut
Conn. Gen. Stat.Title 49 — Mortgages and LiensChapter 847 — Liens

Conn. Gen. Stat. § 49-35 (2025)

Notice of intent. Liens of subcontractors and materialmen

Edition and currency
laws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026) cited 1960–2020 26citing cases
At a glance

Courts have cited this section in 26 opinions since 1960.

(a) No person other than the original contractor for the construction, raising, removal or repairing of the building, or the development of any lot, or the site development or subdivision of any plot of land or a subcontractor whose contract with the original contractor is in writing and has been assented to in writing by the other party to the original contract, is entitled to claim any such mechanic's lien, unless, after commencing, and not later than ninety days after ceasing, to furnish materials or render services for such construction, raising, removal or repairing, such person gives written notice to the owner of the building, lot or plot of land and to the original contractor that he or she has furnished or commenced to furnish materials, or rendered or commenced to render services, and intends to claim a lien therefor on the building, lot or plot of land; provided an original contractor shall not be entitled to such notice, unless, not later than fifteen days after commencing the construction, raising, removal or repairing of the building, or the development of any lot, or the site development or subdivision of any plot of land, such original contractor lodges with the town clerk of the town in which the building, lot or plot of land is situated an affidavit in writing, which shall be recorded by the town clerk with deeds of land, (1) stating the name under which such original contractor conducts business, (2) stating the original contractor's business address, and (3) describing the building, lot or plot of land. The right of any person to claim a lien under this section shall not be affected by the failure of such affidavit to conform to the requirements of this section. The notice shall be served upon the owner or original contractor, if such owner or original contractor resides in the same town in which the building is being erected, raised, removed or repaired or the lot is being improved, or the plot of land is being improved or subdivided, by any indifferent person, state marshal or other proper officer, by leaving with such owner or original contractor or at such owner's or the original contractor's usual place of abode a true and attested copy thereof. If the owner or original contractor does not reside in such town, but has a known agent therein, the notice may be so served upon the agent, otherwise it may be served by any indifferent person, state marshal or other proper officer, by mailing a true and attested copy of the notice by registered or certified mail to the owner or original contractor at the place where such owner or the original contractor resides. If such copy is returned unclaimed, notice to such owner or original contractor shall be given by publication in accordance with the provisions of section 1-2. When there are two or more owners, or two or more original contractors, the notice shall be so served on each owner and on each original contractor. The notice, with the return of the person who served it endorsed thereon, shall be returned to the original maker of the notice not later than thirty days after the filing of the certificate pursuant to section 49-34.

(b) No subcontractor, without a written contract complying with the provisions of this section, and no person who furnishes material or renders services by virtue of a contract with the original contractor or with any subcontractor, may be required to obtain an agreement with, or the consent of, the owner of the land, as provided in section 49-33, to enable him to claim a lien under this section.

(1949 Rev., S. 7219; P.A. 74-310, S. 3; P.A. 75-418, S. 2, 10; P.A. 79-602, S. 88; P.A. 81-8, S. 7, 9; P.A. 85-501, S. 9; P.A. 86-12, S. 3; P.A. 91-350, S. 3; P.A. 00-99, S. 100, 154; P.A. 01-195, S. 46, 181; P.A. 03-224, S. 7.)

History: P.A. 74-310 applied provisions to development of lot, site development and subdivision of land; P.A. 75-418 required that notice be served on each owner where previously notice served to one owner was considered as notice to all; P.A. 79-602 divided section into Subsecs. and rephrased provisions; P.A. 81-8 amended Subsec. (a) to provide for service of process “by registered or certified mail” to nonresident owners and by publication if such copy is returned unclaimed; P.A. 85-501 inserted provisions concerning notice to the original contractor; P.A. 86-12 increased notice period from 60 to 90 days; P.A. 91-350 specified that notice may be served by a “sheriff or other proper officer”; P.A. 00-99 replaced references to sheriff with state marshal in Subsec. (a), effective December 1, 2000; P.A. 01-195 made technical changes in Subsec. (a) for purposes of gender neutrality, effective July 11, 2001; P.A. 03-224 amended Subsec. (a) by replacing “within said period of ninety days” with “not later than thirty days after the filing of the certificate pursuant to section 49-34”, effective July 2, 2003.

Certain facts held not to amount to written assent of owner. 24 C. 320. Contractor gets no lien on land whose title never vested in his employer through latter's failure to complete his purchase contract. 43 C. 143. Mistake in firm name of lienors in body of lien, the signature being correct, does not invalidate lien; lien not invalidated by erroneously including too much land, a release of the excess of land, not sealed, witnessed or acknowledged, being recorded. 46 C. 386. Action for damages maintainable by subcontractor against owner for preventing him by false representations from filing his lien within time limited. 53 C. 561. Certain circumstances constituting party a subcontractor. 55 C. 261. Statute providing that notice of intent must be given within 60 days from the commencement of furnishing makes the time begin with the beginning of a running account. 56 C. 323. Mere knowledge by landowner that materials are being furnished not enough; 66 C. 47; nor is oral or informal notice. 84 C. 487. Lienor is estopped by the date of taking effect, as given in his lien, from proving that it took effect earlier, so as to obtain preference over a mortgage recorded before the date in the lien; what assent to contract of subcontractor requires. 71 C. 95. Notice may be given before work completed; return need not be alleged in foreclosure. 73 C. 519. Right of one to whom subcontractor sublet part of work. 76 C. 107. “Original contractor”; 80 C. 392; receiver of contractor is; 90 C. 17; also one who sells land under contract including erection of house on it; 104 C. 657; one who takes possession of land under agreement to build house is not. 74 C. 113. Purpose and effect of statutes giving lien to subcontractor. 81 C. 506; 82 C. 248. Rights of subcontractors where receiver of original contractor continues contract. 90 C. 17. Pleadings and issues where subcontractor forecloses and owner sets up defect in performance. 95 C. 339. Subcontractor has no right of lien unless original contractor had. 96 C. 225. Rights of subcontractors considered in detail. 108 C. 234. Cited. 109 C. 265. Purpose of notice by subcontractor to inform owner so that payment to contractor may be withheld. 116 C. 276. Because copies not “attested”, liens invalid. 115 C. 494. Omission of word “attested” in endorsement not fatal; nor was endorsement of “a true and attested original”. 131 C. 646. Indifferent person is an impartial, unbiased one; an employee of subcontractor claiming a lien does not qualify. 141 C. 193. Notice of intent to claim a lien is concerned with protection of the owner of the property who might not otherwise know what subcontractors the principal contractor had employed; not necessary to file notice of intent to claim a lien prior to filing for record a certificate of lien under Sec. 49-34. 147 C. 351. Cited. 161 C. 242; 168 C. 371; 169 C. 76; 172 C. 1; 177 C. 295; 180 C. 501; 181 C. 592. Challenge by general contractor to constitutionality of mechanic's lien statutes discussed. 185 C. 583.

Cited. 27 CA 199; 37 CA 547. “Owner” as used in section means only the owner at time of service of certificate of lien because, at that time, it is only that owner who possesses adversely affected property rights, and, consequently, has right to a hearing designed to protect those rights. 99 CA 690.

Nature of “consent” discussed. 13 CS 196. Cited. 23 CS 380; 33 CS 552.

Cited. 2 Conn. Cir. Ct. 622.

Subsec. (a):

Notice sent under Sec. 49-34 was sufficient to satisfy requirements of statute; both notice requirements may be satisfied by one document. 185 C. 549. Cited. 196 C. 233.

The 20 cases that cite Conn. Gen. Stat. § 49-35 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENH & S Torrington Assocs. v. Lutz Eng'g Co., 441 A.2d 171 (Conn. 1981).
cites § 49-35 15×cited by 61 cases
Where it cites § 49-35
“The court based its decision on the subcontractor’s failure to serve a separate notice on the owner of its intent to claim a mechanic’s lien pursuant to General Statutes §49-35 (a). On December 18, 1980, upon reargument, the trial court declined to reopen the judgment, holding…”
The case’s holding
Mechanic's lien statutes should be liberally construed to reasonably and fairly implement their remedial intent.
Later courts cite it for
“purpose of the mechanic's lien is to give one who furnishes materials or services 'the security of the building and land for the payment of his claim by making such claim a lien thereon” · 8 citing courts
2
GREENMJM Landscaping, Inc. v. Lorant, 845 A.2d 382 (Conn. 2004).
cites § 49-35 8×cited by 14 cases
Where it cites § 49-35
“General Statutes § 49-35 (a) 12 provides that no person other than the general contractor or a subcontractor whose contract with the general contractor is in writing and has been assented to by the property owner is entitled to claim a mechanic’s lien without first giving…”
3
GREENPapa v. Greenwich Green, Inc., 416 A.2d 1196 (Conn. 1979).
cites § 49-35 10×cited by 20 cases
Where it cites § 49-35
“as required by” General Statutes § 49-35 as amended by § 2 of Public Act No.”
Later courts cite it for
“when an individual's property right might be adversely affected and where he has a constitutional prerogative to a timely hearing, such an individual should be provided with a fair and suitable notice of the recording of a mechanic's lien against that property.” · 3 citing courts
4
GREENSeaman v. Climate Control Corp., 436 A.2d 271 (Conn. 1980).
cites § 49-35 4×cited by 71 cases
Where it cites § 49-35
“General Statutes § 49-35. Lienors in the second category *596 include subcontractors and persons who furnish materials or services by virtue of a contract with the original contractor or with any subcontractor, that is to say at least first and second tier subcontractors.”
The case’s holding
A second-tier subcontractor is subrogated to the rights of the general contractor rather than the first-tier subcontractor for purposes of establishing a mechanic's lien.
Later courts cite it for
“had the legislature wished to limit, . . the rights of second tier subcontractors to obtain liens against the owner, it would have been easy enough for the supreme court of nevada 14 (0) 1947a legislature to link the subcontractor's claim to the person with whom such subcontractor shall have contracted.” · 4 citing courts
5
GREENGen. Elec. Supply Co. v. S. New England Tel. Co., 441 A.2d 581 (Conn. 1981).
cites § 49-35 6×cited by 27 cases
Where it cites § 49-35
“On August 8, 1975, seeking payment for material and services supplied to Johnson and for repairs of water damaged equipment, GESCO, a second tier subcontractor, filed a notice of intent to claim a mechanic’s lien under General Statutes § 49-35 and a mechanic’s lien under General…”
6
GREEN36 DeForest Avenue, LLC v. Creadore, 915 A.2d 916 (Conn. App. Ct. 2007).
cites § 49-35 4×cited by 12 cases
Where it cites § 49-35
“For a mechanic’s lien to be valid, section § 49-34 (2) requires that a lienor, within thirty days of lodging a certificate of lien with the clerk of the town within which the liened property is located, serve “a true and attested copy of the certificate upon the owner of the…”
7
GREENAstoria Fed. Mortg. Corp. v. Genesis Ltd. P'ship, 143 A.3d 1121 (Conn. App. Ct. 2016).
cites § 49-35 4×cited by 4 cases
Where it cites § 49-35
“General Statutes § 49-35. Lienors in the second category include subcontractors and persons who furnish materials or services by virtue of a contract with the original contractor or with any subcontractor, that is to say at least first and second tier subcontractors.”
8
GREENSanta Fuel, Inc. v. Varga, 823 A.2d 1249 (Conn. App. Ct. 2003).
cites § 49-35 3×cited by 12 cases
Where it cites § 49-35
“) General Statutes § 49-35 (a) provides in relevant part: “No person .”
cites § 49-35 2×cited by 63 cases
Where it cites § 49-35
“The final jurisdictional claim argued by the defendant is that the default judgment should have been set aside for the failure to provide adequate notice under General Statutes § 49-35 (a). This statute, concerning applications for discharge or reduction of mechanic’s liens,…”
The case’s holding
Denying a motion to open a default judgment is not an abuse of discretion when the failure to assert a defense results from negligence.
Later courts cite it for
“of course, negligence is no ground for vacating a judgment, and we have held consistently that the denial of a motion to open a default judgment should not be held an abuse of discretion where the failure to assert a defense was the result of negligence.” · 3 citing courts
10
cites § 49-35 2×cited by 32 cases
Where it cites § 49-35
“the name or names of the person against whom the lien is being filed and the date of the commencement of the performance of services or furnishing of materials, (B) stating that the amount claimed is justly due, as nearly as the same can be ascertained, and (C) subscribed and…”
The case’s holding
A mechanic's lien remains valid despite an inadvertent omission of the property description if the error was made in good faith and provides sufficient notice to reasonable searchers.
Later courts cite it for
“in order to achieve the remedial purposes of the . . . statutes.” · 3 citing courts
11
GREENStone-Krete Constr., Inc. v. Eder, 911 A.2d 300 (Conn. 2006).
cites § 49-35 1×cited by 53 cases
Where it cites § 49-35
“, (B) stating that the amount claimed is justly due, as nearly as the same can be ascertained, and (C) subscribed and sworn to by the claimant, and (2) not later than thirty days after lodging the certificate, serves a true and attested copy of the certificate upon the owner of…”
The case’s holding
A mechanic's lien satisfies the statutory requirement that it be subscribed and sworn to when a jurat certifies that the claimant took an oath, without a written recital of the oath.
Later courts cite it for
“in the construction of the statutes, words and phrases shall be construed according to the commonly approved usage of the language . . . .” · 2 citing courts
12
GREENProvidence Elec. Co. v. Sutton Place, Inc., 287 A.2d 379 (Conn. 1971).
cites § 49-35 2×cited by 100 cases
Where it cites § 49-35
“In this case, a statutory lien was clearly available, pursuant to either General Statutes § 49-33 or § 49-35. In each case the lien must be perfected by filing, and under §49-35 formal written notice is also required.”
The case’s holding
A claim for unjust enrichment fails if the defendant has paid the contractor for the benefit received and no fraud is present.
Later courts cite it for
“a right of recovery under the doctrine of unjust enrichment is essentially equitable, its basis being that in a given situation it is contrary to equity and good conscience for one to retain a benefit which has come to him at the expense of another.” · 9 citing courts
13
GREENRed Rooster Constr. Co. v. River Assocs., Inc., 620 A.2d 118 (Conn. 1993).
cites § 49-35 1×cited by 65 cases
Where it cites § 49-35
“same can be ascertained, and (C) subscribed and sworn to by the claimant, and (2) within the same time, or prior to the lodging of the certificate but not later than thirty days after lodging the certificate, serves a true and attested copy of the certificate upon the owner of…”
The case’s holding
A mechanic's lien is invalid if the claimant fails to perform the statutory ceremony of an oral oath or specific sworn statement required for a valid oath.
Later courts cite it for
“a long-standing rule of statutory construction is that if a statute makes use of words that have an accepted meaning at the common law they ought, in the absence of other controlling reasons, to be expounded and received with that meaning.” · 2 citing courts
14
GREENRollar Constr. & Demolition, Inc. v. Granite Rock Assocs., LLC, 891 A.2d 133 (Conn. App. Ct. 2006).
cites § 49-35 1×cited by 21 cases
Where it cites § 49-35
“, (B) stating that the amount claimed is justly due, as nearly as the same can be ascertained, and (C) subscribed and sworn to by the claimant, and (2) not later than thirty days after lodging the certificate, serves a true and attested copy of the certificate upon the owner of…”
Later courts cite it for
“in the absence of an adequate record, we presume that the trial court, in rendering its judgment undertook the proper analysis of the law and the facts.” · 2 citing courts
15
GREENCamputaro v. Stuart Hardwood Corp., 429 A.2d 796 (Conn. 1980).
cites § 49-35 1×cited by 52 cases
Where it cites § 49-35
“April 22, 1975, placed a mechanic’s lien upon any real estate pursuant to sections 49-33, 49-34, 49-35 and 49-38, which was not released or discharged on such date, may validate such lien by filing a new certificate of mechanic’s lien and serving a true and attested copy thereof…”
The case’s holding
Mechanic's lien statutes require generous construction to fulfill their remedial purpose of providing security for a contractor's labor and materials.
Later courts cite it for
“remedial purpose to furnish security for a contractor's labor and materials requires a generous construction.” · 3 citing courts
16
cites § 49-35 1×cited by 47 cases
Where it cites § 49-35
“same can be ascertained, and (C) subscribed and sworn to by the claimant, and (2) within the same time, or prior to the lodging of the certificate but not later than thirty days after lodging the certificate, serves a true and attested copy of the certificate upon the owner of…”
The case’s holding
A mechanic's lien certificate is invalid if it lacks a written recital of the oath required by statute despite the policy of liberally construing such certificates.
Later courts cite it for
“in accordance with this policy, our courts have been liberal in validating liens despite claimed errors on the face of the lien certificate where the mistake was made in good faith and no resulting prejudice was claimed.” · 3 citing courts
17
GREENF. B. Mattson Co. v. Tarte, 719 A.2d 1158 (Conn. 1998).
cites § 49-35 1×cited by 24 cases
Where it cites § 49-35
“bing' the premises, the amount claimed as a lien thereon, the name or names of the person against whom the lien is being filed and the date of the commencement of the performance of services or furnishing of materials, (B) stating that the amount claimed is justly due, as nearly…”
The case’s holding
When a contractor performs services at the owner's request after substantial completion, the ninety-day period to file a mechanic's lien runs from the date of those later services.
18
GREENNew England Sav. Bank v. Meadow Lakes Realty Co., 706 A.2d 465 (Conn. 1998).
cites § 49-35 1×cited by 18 cases
Where it cites § 49-35
“can be ascertained, and (C) subscribed and sworn to by the claimant, and (2) within the same time, or prior to the lodging of the certificate but not later than thirty days after lodging the certificate, serves a true and attested copy *616 of the certificate upon the owner of…”
19
GREENBiller v. Harris, 161 A.2d 187 (Conn. 1960).
cites § 49-35 2×cited by 14 cases
Where it cites § 49-35
“It is for that reason that the notice of intent is required to be served on the owner (§49-35), while the certificate of lien itself is filed for record with the town clerk (§49-34).”
20
GREENPROBUILD EAST, LLC v. Poffenberger, 45 A.3d 654 (Conn. App. Ct. 2012).
cites § 49-35 1×cited by 6 cases
Where it cites § 49-35
“, (B) stating that the amount claimed is justly due, as nearly as the same can be ascertained, and (C) subscribed and sworn to by the claimant, and (2) not later than thirty days after lodging the certificate, serves a true and attested copy of the certificate upon the owner of…”

Show all 26 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
196019902020

One bar per year. Tallest: 3 cases in 1975. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Conn.18Conn. App. Ct.7D. Conn.1
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Show all 26 citing cases (list view) →

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: laws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026). Syfert holds no earlier or later version of this section.

Connecticut General Statutes Home  |  Search Connecticut  |  Search cases for this section  |  syfert.com