U.S.C. homeSearch U.S. Code
U.S. CodeTitle 16Chapter 33— Coastal Zone Management

16 U.S.C. § 1456 (2026)

Coordination and cooperation

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1974–2025 140citing cases
At a glance

Courts have cited this section in 140 opinions since 1974, 12 of them in the last five years. The most litigated part is subsection (c)(3)(A) (3 cases).

(a) Federal agencies

In carrying out his functions and responsibilities under this chapter, the Secretary shall consult with, cooperate with, and, to the maximum extent practicable, coordinate his activities with other interested Federal agencies.

(b) Adequate consideration of views of Federal agencies

The Secretary shall not approve the management program submitted by a state pursuant to section 1455 of this title unless the views of Federal agencies principally affected by such program have been adequately considered.

(c) Consistency of Federal activities with State management programs; Presidential exemption; certification(1)(A) Each Federal agency activity within or outside the coastal zone that affects any land or water use or natural resource of the coastal zone shall be carried out in a manner which is consistent to the maximum extent practicable with the enforceable policies of approved State management programs. A Federal agency activity shall be subject to this paragraph unless it is subject to paragraph (2) or (3).(B) After any final judgment, decree, or order of any Federal court that is appealable under section 1291 or 1292 of title 28, or under any other applicable provision of Federal law, that a specific Federal agency activity is not in compliance with subparagraph (A), and certification by the Secretary that mediation under subsection (h) is not likely to result in such compliance, the President may, upon written request from the Secretary, exempt from compliance those elements of the Federal agency activity that are found by the Federal court to be inconsistent with an approved State program, if the President determines that the activity is in the paramount interest of the United States. No such exemption shall be granted on the basis of a lack of appropriations unless the President has specifically requested such appropriations as part of the budgetary process, and the Congress has failed to make available the requested appropriations.(C) Each Federal agency carrying out an activity subject to paragraph (1) shall provide a consistency determination to the relevant State agency designated under section 1455(d)(6) of this title at the earliest practicable time, but in no case later than 90 days before final approval of the Federal activity unless both the Federal agency and the State agency agree to a different schedule.(2) Any Federal agency which shall undertake any development project in the coastal zone of a state shall insure that the project is, to the maximum extent practicable, consistent with the enforceable policies of approved state management programs.(3)(A) After final approval by the Secretary of a state’s management program, any applicant for a required Federal license or permit to conduct an activity, in or outside of the coastal zone, affecting any land or water use or natural resource of the coastal zone of that state shall provide in the application to the licensing or permitting agency a certification that the proposed activity complies with the enforceable policies of the state’s approved program and that such activity will be conducted in a manner consistent with the program. At the same time, the applicant shall furnish to the state or its designated agency a copy of the certification, with all necessary information and data. Each coastal state shall establish procedures for public notice in the case of all such certifications and, to the extent it deems appropriate, procedures for public hearings in connection therewith. At the earliest practicable time, the state or its designated agency shall notify the Federal agency concerned that the state concurs with or objects to the applicant’s certification. If the state or its designated agency fails to furnish the required notification within six months after receipt of its copy of the applicant’s certification, the state’s concurrence with the certification shall be conclusively presumed. No license or permit shall be granted by the Federal agency until the state or its designated agency has concurred with the applicant’s certification or until, by the state’s failure to act, the concurrence is conclusively presumed, unless the Secretary, on his own initiative or upon appeal by the applicant, finds after providing a reasonable opportunity for detailed comments from the Federal agency involved and from the state, that the activity is consistent with the objectives of this chapter or is otherwise necessary in the interest of national security.(B) After the management program of any coastal state has been approved by the Secretary under section 1455 of this title, any person who submits to the Secretary of the Interior any plan for the exploration or development of, or production from, any area which has been leased under the Outer Continental Shelf Lands Act (43 U.S.C. 1331 et seq.) and regulations under such Act shall, with respect to any exploration, development, or production described in such plan and affecting any land or water use or natural resource of the coastal zone of such state, attach to such plan a certification that each activity which is described in detail in such plan complies with the enforceable policies of such state’s approved management program and will be carried out in a manner consistent with such program. No Federal official or agency shall grant such person any license or permit for any activity described in detail in such plan until such state or its designated agency receives a copy of such certification and plan, together with any other necessary data and information, and until—(i) such state or its designated agency, in accordance with the procedures required to be established by such state pursuant to subparagraph (A), concurs with such person’s certification and notifies the Secretary and the Secretary of the Interior of such concurrence;(ii) concurrence by such state with such certification is conclusively presumed as provided for in subparagraph (A), except if such state fails to concur with or object to such certification within three months after receipt of its copy of such certification and supporting information, such state shall provide the Secretary, the appropriate federal agency, and such person with a written statement describing the status of review and the basis for further delay in issuing a final decision, and if such statement is not so provided, concurrence by such state with such certification shall be conclusively presumed; or(iii) the Secretary finds, pursuant to subparagraph (A), that each activity which is described in detail in such plan is consistent with the objectives of this chapter or is otherwise necessary in the interest of national security.If a state concurs or is conclusively presumed to concur, or if the Secretary makes such a finding, the provisions of subparagraph (A) are not applicable with respect to such person, such state, and any Federal license or permit which is required to conduct any activity affecting land uses or water uses in the coastal zone of such state which is described in detail in the plan to which such concurrence or finding applies. If such state objects to such certification and if the Secretary fails to make a finding under clause (iii) with respect to such certification, or if such person fails substantially to comply with such plan as submitted, such person shall submit an amendment to such plan, or a new plan, to the Secretary of the Interior. With respect to any amendment or new plan submitted to the Secretary of the Interior pursuant to the preceding sentence, the applicable time period for purposes of concurrence by conclusive presumption under subparagraph (A) is 3 months.(d) Application of local governments for Federal assistance; relationship of activities with approved management programs

State and local governments submitting applications for Federal assistance under other Federal programs, in or outside of the coastal zone, affecting any land or water use of natural resource of the coastal zone shall indicate the views of the appropriate state or local agency as to the relationship of such activities to the approved management program for the coastal zone. Such applications shall be submitted and coordinated in accordance with the provisions of section 6506 of title 31. Federal agencies shall not approve proposed projects that are inconsistent with the enforceable policies of a coastal state’s management program, except upon a finding by the Secretary that such project is consistent with the purposes of this chapter or necessary in the interest of national security.

(e) Construction with other lawsNothing in this chapter shall be construed—(1) to diminish either Federal or state jurisdiction, responsibility, or rights in the field of planning, development, or control of water resources, submerged lands, or navigable waters; nor to displace, supersede, limit, or modify any interstate compact or the jurisdiction or responsibility of any legally established joint or common agency of two or more states or of two or more states and the Federal Government; nor to limit the authority of Congress to authorize and fund projects;(2) as superseding, modifying, or repealing existing laws applicable to the various Federal agencies; nor to affect the jurisdiction, powers, or prerogatives of the International Joint Commission, United States and Canada, the Permanent Engineering Board, and the United States operating entity or entities established pursuant to the Columbia River Basin Treaty, signed at Washington, January 17, 1961, or the International Boundary and Water Commission, United States and Mexico.(f) Construction with existing requirements of water and air pollution programs

Notwithstanding any other provision of this chapter, nothing in this chapter shall in any way affect any requirement (1) established by the Federal Water Pollution Control Act, as amended [33 U.S.C. 1251 et seq.], or the Clean Air Act, as amended [42 U.S.C. 7401 et seq.], or (2) established by the Federal Government or by any state or local government pursuant to such Acts. Such requirements shall be incorporated in any program developed pursuant to this chapter and shall be the water pollution control and air pollution control requirements applicable to such program.

(g) Concurrence with programs which affect inland areas

When any state’s coastal zone management program, submitted for approval or proposed for modification pursuant to section 1455 of this title, includes requirements as to shorelands which also would be subject to any Federally supported national land use program which may be hereafter enacted, the Secretary, prior to approving such program, shall obtain the concurrence of the Secretary of the Interior, or such other Federal official as may be designated to administer the national land use program, with respect to that portion of the coastal zone management program affecting such inland areas.

(h) Mediation of disagreementsIn case of serious disagreement between any Federal agency and a coastal state—(1) in the development or the initial implementation of a management program under section 1454 of this title; or(2) in the administration of a management program approved under section 1455 of this title;the Secretary, with the cooperation of the Executive Office of the President, shall seek to mediate the differences involved in such disagreement. The process of such mediation shall, with respect to any disagreement described in paragraph (2), include public hearings which shall be conducted in the local area concerned.(i) Application fee for appeals(1) With respect to appeals under subsections (c)(3) and (d) which are submitted after November 5, 1990, the Secretary shall collect an application fee of not less than $200 for minor appeals and not less than $500 for major appeals, unless the Secretary, upon consideration of an applicant’s request for a fee waiver, determines that the applicant is unable to pay the fee.(2)(A) The Secretary shall collect such other fees as are necessary to recover the full costs of administering and processing such appeals under subsection (c).(B) If the Secretary waives the application fee under paragraph (1) for an applicant, the Secretary shall waive all other fees under this subsection for the applicant.(3) Fees collected under this subsection shall be deposited into the Coastal Zone Management Fund established under section 1456a of this title.(Pub. L. 89–454, title III, § 307, as added Pub. L. 92–583, Oct. 27, 1972, 86 Stat. 1285; amended Pub. L. 94–370, § 6, July 26, 1976, 90 Stat. 1018; Pub. L. 95–372, title V, § 504, Sept. 18, 1978, 92 Stat. 693; Pub. L. 101–508, title VI, § 6208, Nov. 5, 1990, 104 Stat. 1388–307; Pub. L. 102–587, title II, § 2205(b)(13), (14), Nov. 4, 1992, 106 Stat. 5051.)Editorial NotesReferences in Text

The Outer Continental Shelf Lands Act, referred to in subsec. (c)(3)(B), is act Aug. 7, 1953, ch. 345, 67 Stat. 462, which is classified generally to subchapter III (§ 1331 et seq.) of chapter 29 of Title 43, Public Lands. For complete classification of this Act to the Code, see Short Title note set out under section 1301 of Title 43 and Tables.

The Federal Water Pollution Control Act, referred to in subsec. (f), is act June 30, 1948, ch. 758, as amended generally by Pub. L. 92–500, § 2, Oct. 18, 1972, 86 Stat. 816, which is classified generally to chapter 26 (§ 1251 et seq.) of Title 33, Navigation and Navigable Waters. For complete classification of this Act to the Code, see Short Title note set out under section 1251 of Title 33 and Tables.

The Clean Air Act, referred to in subsec. (f), is act July 14, 1955, ch. 360, 69 Stat. 322, which is classified generally to chapter 85 (§ 7401 et seq.) of Title 42, The Public Health and Welfare. For complete classification of this Act to the Code, see Short Title note set out under section 7401 of Title 42 and Tables.

Codification

In subsec. (d), “section 6506 of title 31” substituted for “title IV of the Intergovernmental Coordination [Cooperation] Act of 1968 [42 U.S.C. 4231 et seq.]” on authority of Pub. L. 97–258, § 4(b), Sept. 13, 1982, 96 Stat. 1067, the first section of which enacted Title 31, Money and Finance.

Amendments

1992—Subsec. (c)(3)(B). Pub. L. 102–587, § 2205(b)(13), made technical amendment to directory language of Pub. L. 101–508, § 6208(b)(3)(B). See 1990 Amendment note below.

Subsec. (i). Pub. L. 102–587, § 2205(b)(14), designated existing provisions as par. (1), added pars. (2) and (3), and struck out at end of par. (1) “The Secretary shall collect such other fees as are necessary to recover the full costs of administering and processing such appeals under subsection (c) of this section.”

1990—Subsec. (c)(1). Pub. L. 101–508, § 6208(a), amended par. (1) generally. Prior to amendment, par. (1) read as follows: “Each Federal agency conducting or supporting activities directly affecting the coastal zone shall conduct or support those activities in a manner which is, to the maximum extent practicable, consistent with approved state management programs.”

Subsec. (c)(2). Pub. L. 101–508, § 6208(b)(1), which directed the insertion of “the enforceable policies of” before “approved State management programs”, was executed by making the insertion before “approved state management programs” to reflect the probable intent of Congress.

Subsec. (c)(3)(A). Pub. L. 101–508, § 6208(b)(2), in first sentence inserted “, in or outside of the coastal zone,” after “to conduct an activity”, substituted “any land or water use or natural resource of” for “land or water uses in”, and inserted “the enforceable policies of” after “the proposed activity complies with”.

Subsec. (c)(3)(B). Pub. L. 101–508, § 6208(b)(3)(A), substituted “land or water use or natural resource of” for “land use or water use in” in first sentence.

Pub. L. 101–508, § 6208(b)(3)(B), as amended by Pub. L. 102–587, § 2205(b)(13), inserted “the enforceable policies of” after “such plan complies with” in first sentence.

Subsec. (d). Pub. L. 101–508, § 6208(b)(4), substituted “, in or outside of the coastal zone, affecting any land or water use of natural resource of” for “affecting” and inserted “the enforceable policies of” after “that are inconsistent with”.

Subsec. (i). Pub. L. 101–508, § 6208(c), added subsec. (i).

1978—Subsec. (c)(3)(B)(ii). Pub. L. 95–372 inserted “, except if such state fails to concur with or object to such certification within three months after receipt of its copy of such certification and supporting information, such state shall provide the Secretary, the appropriate federal agency, and such person with a written statement describing the status of review and the basis for further delay in issuing a final decision, and if such statement is not so provided, concurrence by such state with such certification shall be conclusively presumed” after “as provided for in subparagraph (A)”.

1976—Subsec. (b). Pub. L. 94–370, § 6(2), struck out provisions requiring that in case of serious disagreement between Federal agency and state in development of program, Secretary shall seek to mediate the differences in cooperation with the Executive Office of the President and incorporated such provision into subsec. (h).

Subsec. (c)(3). Pub. L. 94–370, § 6(3), designated existing provisions as subpar. (A) and added subpar. (B).

Subsec. (h). Pub. L. 94–370, § 6(4), added subsec. (h) which incorporates former provision of subsec. (b) relating to mediation by Secretary of disagreements between Federal agencies and state.

The 20 cases that cite 16 U.S.C. § 1456 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 1456 6×cited by 11,354 cases
Where it cites § 1456
“The President, pursuant to 16 U. S. C. §1456 (c)(1)(B), granted the Navy an exemption from the CZMA.”
The case’s holding
A plaintiff seeking a preliminary injunction must demonstrate that irreparable injury is likely in the absence of an injunction rather than merely possible.
Later courts cite it for
“a plaintiff seeking a preliminary injunction must establish that he is likely to succeed on the merits, that he is likely to suffer irreparable harm in the absence of preliminary relief, that the balance of equities tips in his favor, and that an injunction is in the public interest.” · 1618 citing courts
cites § 1456 16×cited by 242 cases
Where it cites § 1456
“" 16 U. S. C. § 1456 (c)(3)(A). At the same time, the applicant must provide the State a copy of the certification.”
The case’s holding
A facial challenge to a state regulation fails if the federal scheme does not manifest an intent to preempt all state land use regulation (upholding facial challenge to state environmental regulation).
Later courts cite it for
“it is appropriate to expect an administrative regulation to declare any intention to preempt state law with some specificity” · 6 citing courts
3
GREENSec'y of the Interior v. California, 464 U.S. 312 (1984).
cites § 1456 13×cited by 177 cases
Where it cites § 1456
“1285 , 16 U. S. C. § 1456 (c)(1) (1982 ed.). We conclude that the Secretary of the Interior's sale of Outer Continental Shelf oil and gas leases is not an activity "directly affecting" the coastal zone within the meaning of the statute.”
The case’s holding
States with approved coastal zone management plans retain significant authority to veto offshore exploration or development plans that are inconsistent with those plans.
Later courts cite it for
“since the state of california clearly does have standing, we need not address the standing of the other plaintiffs, whose position here is identical to the state's.” · 8 citing courts
4
GREENCalifornia ex rel. California Coastal Comm'n v. Norton, 150 F. Supp. 2d 1046 (N.D. Cal. 2001).
cites § 1456 12×cited by 20 cases
Where it cites § 1456
“See 16 U.S.C. § 1456 (c). A federal agency carrying out an activity that affects the coastal zone must provide a consistency determination to the relevant State agency before final approval of the federal activity.”
The case’s holding
Granting suspensions of offshore oil and gas leases constitutes a federal activity requiring a consistency determination under the Coastal Zone Management Act.
Later courts cite it for
“each federal agency activity within or outside the coastal zone that affects any land or water use or natural resource of the coastal zone shall be carried out in a manner which is consistent to the maximum extent practicable with the enforceable policies of approved state management programs.” · 1 citing court
5
GREENCalifornia v. Norton, 311 F.3d 1162 (9th Cir. 2002).
cites § 1456 20×cited by 48 cases
Where it cites § 1456
“; Nuevo Energy Company; Poseidon Petroleum, LLC; and Samedan Oil Corp.”
The case’s holding
Where substantial record evidence suggests a categorical exclusion's exception may apply, the agency must at least explain why the action falls outside the exception and document its use of the exclusion.
Later courts cite it for
“where there is substantial evidence in the record that exceptions to the categorical exclusion may apply, the agency must at the very least explain why the action does not fall within one of the exceptions.” · 7 citing courts
cites § 1456 6×subsections: (c)(3)cited by 174 cases
Where it cites § 1456
“16 U. S. C. § 1456 (c)(3). If a State objects, the certification fails, unless the Secretary of Commerce overrides the State's objection.”
The case’s holding
The law applicable to contracts between private individuals generally governs the rights and duties of the United States when it enters into contracts.
Later courts cite it for
“so substantially impairs the value of the contract to the injured party at the time of the breach that it is just in the circumstances to allow him to recover damages based on all his remaining rights to performance.” · 12 citing courts
cites § 1456 6×cited by 55 cases
Where it cites § 1456
“The second is whether the district court erred in holding that CRMC’s failure to respond within six months to Weaver’s Cove’s application for federal consistency review requires there be a presumption of concurrence in the project, pursuant to 16 U.S.C. § 1456 (c)(3)(A) of the…”
The case’s holding
State licensing processes for dredging necessary for LNG terminals are conflict preempted by the Natural Gas Act when the federal commission has approved the project.
Later courts cite it for
“would cease to be barriers to ultimate approval of the project.” · 4 citing courts
8
GREENAmber Resources Co. v. United States, 538 F.3d 1358 (Fed. Cir. 2008).
cites § 1456 6×cited by 47 cases
Where it cites § 1456
“” 16 U.S.C. § 1456 (c)(1) (1982). A separate section of the CZMA, section 307(c)(3), provides that after the Secretary of Commerce approves a state’s coastal management plan, any applicant for a federal permit to conduct an activity that affects land or water uses in the state’s…”
The case’s holding
A post-agreement statute imposing significantly more burdensome requirements on procedures incorporated into a lease constitutes a material breach of the lease agreement.
Later courts cite it for
“court decisions construing statutes are typically viewed as not changing the law but merely announcing what the law has meant since its enactment . . . .” · 2 citing courts
9
REDNat. Resources Def. Council, Inc. v. Winter, 518 F.3d 658 (9th Cir. 2008).
cites § 1456 4×cited by 43 cases
Reversed in part by Winter v. Natural Resources Defense Council, Inc. (2008): the U.S. Supreme Court's own opinion in this case ("The judgment of the Court of Appeals is reversed, and the preliminary injunction is vacated to the…
Where it cites § 1456
“Bush, pursuant to 16 U.S.C. § 1456 (c)(1)(B), exempted from the requirements of the CZMA the Navy’s use of MFA sonar in the SOCAL exercises.”
The case’s holding
Procedural requirements under NEPA mandate that an agency take a hard look at the environmental consequences of its actions.
Later courts cite it for
“nepa's procedural requirements mandate that an agency take a 'hard look' at the environmental consequences of its actions.” · 4 citing courts
10
cites § 1456 2×cited by 160 cases
Where it cites § 1456
“See 16 U.S.C. § 1456 (c). None of the events precipitating the Amber litigation occurred until well after the 1996 PSA’s effective date, save for the enactment of a law that furnished a basis for that to happen.”
The case’s holding
Contract terms excluding proceeds arising from pre-conveyance events require a substantial-factor causal nexus rather than a mere but-for connection to encompass post-conveyance judgments.
Later courts cite it for
“we 'construe contracts from a utilitarian standpoint bearing in mind the particular business activity sought to be served,' and avoiding unreasonable constructions when possible and proper.” · 15 citing courts
11
GREENAES Sparrows Point LNG, LLC v. Smith, 527 F.3d 120 (4th Cir. 2008).
cites § 1456 4×cited by 27 cases
Where it cites § 1456
“In addition, the CZMA requires that any federal agency activity affecting the state's coastal zone "be carried out in a manner which is consistent to the maximum extent practicable with the enforceable policies of approved [CMPs].”
Later courts cite it for
“the mechanism the czma provides for the exercise of states' rights-whatever their content or source-is a federally approved cmp” · 2 citing courts
cites § 1456 3×cited by 45 cases
Where it cites § 1456
“Pursuant to the CZMA and the CWA, Islander East filed applications with the States of New York and Connecticut seeking the following state authorizations under federal law: (1) a certificate of consistency with the state’s Coastal Zone Management Plan (CZMP) pursuant to section…”
The case’s holding
A state agency's denial of a water quality certificate is arbitrary and capricious if it ignores contradictory evidence or fails to consider important aspects of the issue.
Later courts cite it for
“although not clear from the terms of the eleventh amendment, the supreme court has interpreted this language to bar suit against a state by its own citizens.” · 4 citing courts
13
GREENAcme Fill Corp. v. San Francisco Bay Conservation & Dev. Comm'n, 187 Cal. App. 3d 1056 (Ct. App. 1986).
cites § 1456 9×cited by 8 cases
Where it cites § 1456
“( 16 U.S.C. § 1456 (c)(1).) To this end, the CZMA provides that applicants requesting a federal permit or license for an activity affecting the coastal zone include in the application “a certification that the proposed activity complies with the state’s approved [coastal…”
cites § 1456 3×cited by 58 cases
Where it cites § 1456
“” 16 U.S.C. § 1456 (c)(1). An implementing regulation requires federal agencies to provide the affected states with so called “consistency determinations” for proposed activities at least ninety days prior to final federal approval.”
The case’s holding
An agency's refusal to exercise its statutory authority does not constitute a major federal action requiring environmental review under the National Environmental Policy Act.
Later courts cite it for
“it would be inappropriate to let our earlier expressions of puzzlement prevent a subsequent panel from evaluating the commission's newly tendered explanations de novo” · 2 citing courts
15
GREENCity of Tacoma v. Fed. Energy Regulatory Comm'n, 460 F.3d 53 (D.C. Cir. 2006).
cites § 1456 2×cited by 50 cases
Where it cites § 1456
“§ 1341 (a); (2) the state “concurrence” required under section 307(c)(3)(A) of the Coastal Zone Management Act, 16 U.S.C. § 1456 (c)(3)(A); (3) the consultations with state and federal wildlife agencies required under section 10(j) of the FPA, id.”
The case’s holding
The Federal Energy Regulatory Commission lacks the statutory authority to unilaterally impose strict time limits on the submission of mandatory license conditions by other federal agencies.
Later courts cite it for
“the action agency need not undertake a separate, independent analysis of the issues 8 addressed in the biop.” · 5 citing courts
16
GREENCity of Shoreacres v. Texas Comm'n on Env't Quality, 166 S.W.3d 825 (Tex. App.—Austin 2005).
cites § 1456 3×cited by 21 cases
Where it cites § 1456
“§ 1341 (a)(1) (West 2001); 16 U.S.C.A. § 1456 (West 2001); Tex. Nat.”
17
GREENTown of Southold v. Wheeler, 48 F.4th 67 (2d Cir. 2022).
cites § 1456 5×cited by 4 cases
Where it cites § 1456
“16 U.S.C. § 1456 (c)(1)(A). Regulations implementing the CZMA, in turn, have interpreted that phrase to require “full[] consisten[cy]” with state programs.”
18
GREENState of Cal. v. Watt, 520 F. Supp. 1359 (C.D. Cal. 1981).
cites § 1456 5×cited by 16 cases
Where it cites § 1456
“16 U.S.C. § 1456 (c)(1). Thus, the principal issue in this case with respect to the CZMA is whether the Secretary violated that Act by making a “negative determination” that no consistency review was required for the Final Notice of Lease Sale No.”
The case’s holding
Pre-leasing activities for Outer Continental Shelf leases, including the size, timing, or location of a lease sale, directly affect the coastal zone and require Coastal Zone Management Act consistency review.
Later courts cite it for
“and by conducting all activities on these tracts in a manner consistent with california's coastal management plan.” · 2 citing courts
19
GREENBd. of Commissioners v. Tennessee Gas Pipeline Co., 850 F.3d 714 (5th Cir. 2017).
cites § 1456 1×cited by 58 cases
The case’s holding
Federal question jurisdiction exists when a well-pleaded complaint establishes that a plaintiff's right to relief necessarily depends on the resolution of a substantial question of federal law.
Later courts cite it for
“the board's complaint draws on federal law as the exclusive basis for holding defendants liable for some of their actions,” · 4 citing courts
20
GREENBarcelo v. Brown, 478 F. Supp. 646 (D.P.R. 1979).
cites § 1456 3×cited by 38 cases
The case’s holding
Injunctive relief is denied if its granting would cause grievous and perhaps irreparable harm to the national welfare.
Later courts cite it for
“the granting of the injunctive relief sought would cause grievous, and perhaps irreparable harm, not only to defendant navy, but to the general welfare of this nation.” · 2 citing courts

Show all 140 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
197419992025

One bar per year. Tallest: 14 cases in 2008. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
9th Cir.24D.D.C.92d Cir.71st Cir.6D.C. Cir.6Cal. Ct. App.6N.D. Cal.5SCOTUS5

The 8 courts with the most citing cases, of 49 courts in all.

By subsection
(c)(3)1 case
Mobil Oil Expl. & Producing Se., Inc. v. United States, 530 U.S. 604 (2000).“16 U. S. C. § 1456 (c)(3). If a State objects, the certification fails, unless the Secretary of Commerce overrides the State's objection.”
(c)(3)(A)3 cases
Algonquin Gas Transmission, LLC v. Town of Weymouth, 365 F. Supp. 3d 147 (D.D.C. 2019).
Algonquin Gas Transmission, LLC v. Town of Weymouth, No. 1:18-cv-10871 (D. Mass. Feb. 11, 2019).
(d)1 case
Knaust v. City of Kingston, 978 F. Supp. 86 (N.D.N.Y. 1997).

Show all 140 citing cases (list view) →

Enactment and amendments
(Pub. L. 89–454, title III, § 307, as added Pub. L. 92–583, Oct. 27, 1972, 86 Stat. 1285; amended Pub. L. 94–370, § 6, July 26, 1976, 90 Stat. 1018; Pub. L. 95–372, title V, § 504, Sept. 18, 1978, 92 Stat. 693; Pub. L. 101–508, title VI, § 6208, Nov. 5, 1990, 104 Stat. 1388–307; Pub. L. 102–587, title II, § 2205(b)(13), (14), Nov. 4, 1992, 106 Stat. 5051.)
Amendment years (notes): 1992, 1990, 1978, 1976
Versions

Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.

U.S.C. Home  |  Search U.S. Code  |  Search cases for this section  |  syfert.com