16 U.S.C. § 824d (2026)

Rates and charges; schedules; suspension of new rates; automatic adjustment clauses

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1944–2026 574citing cases
At a glance

Courts have cited this section in 574 opinions since 1944, 94 of them in the last five years. The most litigated part is subsection (a) (254 cases).

(a) Just and reasonable rates

All rates and charges made, demanded, or received by any public utility for or in connection with the transmission or sale of electric energy subject to the jurisdiction of the Commission, and all rules and regulations affecting or pertaining to such rates or charges shall be just and reasonable, and any such rate or charge that is not just and reasonable is hereby declared to be unlawful.

(b) Preference or advantage unlawful

No public utility shall, with respect to any transmission or sale subject to the jurisdiction of the Commission, (1) make or grant any undue preference or advantage to any person or subject any person to any undue prejudice or disadvantage, or (2) maintain any unreasonable difference in rates, charges, service, facilities, or in any other respect, either as between localities or as between classes of service.

(c) Schedules

Under such rules and regulations as the Commission may prescribe, every public utility shall file with the Commission, within such time and in such form as the Commission may designate, and shall keep open in convenient form and place for public inspection schedules showing all rates and charges for any transmission or sale subject to the jurisdiction of the Commission, and the classifications, practices, and regulations affecting such rates and charges, together with all contracts which in any manner affect or relate to such rates, charges, classifications, and services.

(d) Notice required for rate changes

Unless the Commission otherwise orders, no change shall be made by any public utility in any such rate, charge, classification, or service, or in any rule, regulation, or contract relating thereto, except after sixty days’ notice to the Commission and to the public. Such notice shall be given by filing with the Commission and keeping open for public inspection new schedules stating plainly the change or changes to be made in the schedule or schedules then in force and the time when the change or changes will go into effect. The Commission, for good cause shown, may allow changes to take effect without requiring the sixty days’ notice herein provided for by an order specifying the changes so to be made and the time when they shall take effect and the manner in which they shall be filed and published.

(e) Suspension of new rates; hearings; five-month period

Whenever any such new schedule is filed the Commission shall have authority, either upon complaint or upon its own initiative without complaint, at once, and, if it so orders, without answer or formal pleading by the public utility, but upon reasonable notice, to enter upon a hearing concerning the lawfulness of such rate, charge, classification, or service; and, pending such hearing and the decision thereon, the Commission, upon filing with such schedules and delivering to the public utility affected thereby a statement in writing of its reasons for such suspension, may suspend the operation of such schedule and defer the use of such rate, charge, classification, or service, but not for a longer period than five months beyond the time when it would otherwise go into effect; and after full hearings, either completed before or after the rate, charge, classification, or service goes into effect, the Commission may make such orders with reference thereto as would be proper in a proceeding initiated after it had become effective. If the proceeding has not been concluded and an order made at the expiration of such five months, the proposed change of rate, charge, classification, or service shall go into effect at the end of such period, but in case of a proposed increased rate or charge, the Commission may by order require the interested public utility or public utilities to keep accurate account in detail of all amounts received by reason of such increase, specifying by whom and in whose behalf such amounts are paid, and upon completion of the hearing and decision may by further order require such public utility or public utilities to refund, with interest, to the persons in whose behalf such amounts were paid, such portion of such increased rates or charges as by its decision shall be found not justified. At any hearing involving a rate or charge sought to be increased, the burden of proof to show that the increased rate or charge is just and reasonable shall be upon the public utility, and the Commission shall give to the hearing and decision of such questions preference over other questions pending before it and decide the same as speedily as possible.

(f) Review of automatic adjustment clauses and public utility practices; action by Commission; “automatic adjustment clause” defined(1) Not later than 2 years after November 9, 1978, and not less often than every 4 years thereafter, the Commission shall make a thorough review of automatic adjustment clauses in public utility rate schedules to examine—(A) whether or not each such clause effectively provides incentives for efficient use of resources (including economical purchase and use of fuel and electric energy), and(B) whether any such clause reflects any costs other than costs which are—(i) subject to periodic fluctuations and(ii) not susceptible to precise determinations in rate cases prior to the time such costs are incurred.Such review may take place in individual rate proceedings or in generic or other separate proceedings applicable to one or more utilities.(2) Not less frequently than every 2 years, in rate proceedings or in generic or other separate proceedings, the Commission shall review, with respect to each public utility, practices under any automatic adjustment clauses of such utility to insure efficient use of resources (including economical purchase and use of fuel and electric energy) under such clauses.(3) The Commission may, on its own motion or upon complaint, after an opportunity for an evidentiary hearing, order a public utility to—(A) modify the terms and provisions of any automatic adjustment clause, or(B) cease any practice in connection with the clause,if such clause or practice does not result in the economical purchase and use of fuel, electric energy, or other items, the cost of which is included in any rate schedule under an automatic adjustment clause.(4) As used in this subsection, the term “automatic adjustment clause” means a provision of a rate schedule which provides for increases or decreases (or both), without prior hearing, in rates reflecting increases or decreases (or both) in costs incurred by an electric utility. Such term does not include any rate which takes effect subject to refund and subject to a later determination of the appropriate amount of such rate.(g) Inaction of Commissioners(1) In generalWith respect to a change described in subsection (d), if the Commission permits the 60-day period established therein to expire without issuing an order accepting or denying the change because the Commissioners are divided two against two as to the lawfulness of the change, as a result of vacancy, incapacity, or recusal on the Commission, or if the Commission lacks a quorum—(A) the failure to issue an order accepting or denying the change by the Commission shall be considered to be an order issued by the Commission accepting the change for purposes of section 825l(a) of this title; and(B) each Commissioner shall add to the record of the Commission a written statement explaining the views of the Commissioner with respect to the change.(2) Appeal

If, pursuant to this subsection, a person seeks a rehearing under section 825l(a) of this title, and the Commission fails to act on the merits of the rehearing request by the date that is 30 days after the date of the rehearing request because the Commissioners are divided two against two, as a result of vacancy, incapacity, or recusal on the Commission, or if the Commission lacks a quorum, such person may appeal under section 825l(b) of this title.

(June 10, 1920, ch. 285, pt. II, § 205, as added Aug. 26, 1935, ch. 687, title II, § 213, 49 Stat. 851; amended Pub. L. 95–617, title II, §§ 207(a), 208, Nov. 9, 1978, 92 Stat. 3142; Pub. L. 115–270, title III, § 3006, Oct. 23, 2018, 132 Stat. 3868.)Editorial NotesAmendments

2018—Subsec. (g). Pub. L. 115–270 added subsec. (g).

1978—Subsec. (d). Pub. L. 95–617, § 207(a), substituted “sixty” for “thirty” in two places.

Subsec. (f). Pub. L. 95–617, § 208, added subsec. (f).

Statutory Notes and Related SubsidiariesStudy of Electric Rate Increases Under Federal Power Act

Section 207(b) of Pub. L. 95–617 directed chairman of Federal Energy Regulatory Commission, in consultation with Secretary, to conduct a study of legal requirements and administrative procedures involved in consideration and resolution of proposed wholesale electric rate increases under Federal Power Act, section 791a et seq. of this title, for purposes of providing for expeditious handling of hearings consistent with due process, preventing imposition of successive rate increases before they have been determined by Commission to be just and reasonable and otherwise lawful, and improving procedures designed to prohibit anticompetitive or unreasonable differences in wholesale and retail rates, or both, and that chairman report to Congress within nine months from Nov. 9, 1978, on results of study, on administrative actions taken as a result of this study, and on any recommendations for changes in existing law that will aid purposes of this section.

The 20 cases that cite 16 U.S.C. § 824d most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 824d 5×subsections: (a) 3× (c)cited by 180 cases
Where it cites § 824d
“719, the Rule explained that the FPA gives FERC jurisdiction over such bids because they "directly affect [ ] wholesale rates.”
The case’s holding
The Federal Energy Regulatory Commission has authority to regulate the compensation of demand response commitments by wholesale market operators.
Later courts cite it for
“a court is not to ask whether a regulatory decision is the best one possible or even whether it is better than the alternatives.” · 17 citing courts
cites § 824d 6×subsections: (a) 4× (c) 2×cited by 169 cases
The case’s holding
The commission must presume contract rates are just and reasonable unless it finds that the rates seriously harm the public interest.
Later courts cite it for
“that it provided a different rationale for the necessary result is no cause for upsetting its ruling” · 10 citing courts
cites § 824d 5×subsections: (a) 2×cited by 236 cases
Where it cites § 824d
“See 16 U. S. C. §§ 824d— 824e. In 1996, after receiving comments on the NPRM, FERC issued Order No.”
The case’s holding
The Federal Power Act grants an agency jurisdiction over interstate electric energy transmission regardless of whether the transmission is associated with a wholesale or retail transaction.
Later courts cite it for
“the sale of electric energy at wholesale in interstate commerce.” · 13 citing courts
cites § 824d 9×cited by 606 cases
Where it cites § 824d
“All such agreements have to be filed with the Commission, § 205 (c), 16 U. S. C. § 824d (c), but the legality of rates so filed is not conditioned upon the Commission's *256 approval.”
The case’s holding
A pipeline cannot claim a legal right to any rate other than the rate filed with or accepted by the Commission (subject matter jurisdiction).
Later courts cite it for
“as frequently happens where jurisdiction depends on subject matter, the question whether jurisdiction exists has been confused with the question whether the complaint states a cause of action.” · 18 citing courts
cites § 824d 8×subsections: (c) 4× (d) 3× (a)cited by 44 cases
Where it cites § 824d
“§ 824d(a) & (c) (emphasis added). Furthermore, if a utility makes any changes to a filed “rate, charge, classification, or service,” its public filing with the Commission must “stat[e] plainly” both the changes made to the tariff “then in force,” and “the time when the change or…”
The case’s holding
An agency must provide a reasoned explanation when departing from precedent or treating similar situations differently.
Later courts cite it for
“it is textbook administrative law that an agency must provide a reasoned explanation for departing from precedent or treating similar situations differently.” · 5 citing courts
6
GREENMaine v. Fed. Energy Regulatory Comm'n, 854 F.3d 9 (D.C. Cir. 2017).
cites § 824d 5×subsections: (a) 3×cited by 39 cases
Where it cites § 824d
“This is known as “rolled-in” ratemaking. See, e.g., Otter Tail Power Co., 12 FERC ¶ 61,169 at 61,420 (1980).”
The case’s holding
Section 206 of the Federal Power Act requires the commission to make an explicit finding that an existing rate is unlawful before setting a new rate.
Later courts cite it for
“section 206 mandates a two-step procedure that requires ferc to make an explicit finding that the existing rate is unlawful before setting a new rate.” · 3 citing courts
cites § 824d 4×subsections: (d) 4×cited by 246 cases
Where it cites § 824d
“821 , Congress departed from the scheme of purely tariff-based regulation and acknowledged that contracts between commercial buyers and sellers could be used in ratesetting, 16 U.”
The case’s holding
The statutory term cost is not limited to historical expenditures and permits the use of forward-looking economic cost methodologies for leasing network elements.
Later courts cite it for
“a network connecting terminals like telephones, faxes, and modems to other terminals within a geographical area like a city.” · 6 citing courts
8
GREENBoston Edison Co. v. Fed. Energy Regulatory Comm'n, 856 F.2d 361 (1st Cir. 1988).
cites § 824d 8×subsections: (c) 4× (d) 2× (a) (e)cited by 78 cases
Where it cites § 824d
“A regulated energy seller must file with FERC all rates and the “classifications, practices, and regulations affecting such rates and charges, together with all contracts which in any manner affect or relate to such rates, charges, classifications, and services.”
The case’s holding
Plain and unambiguous contract terms must be construed in their ordinary and usual sense to effectuate the intent of the parties.
Later courts cite it for
“in the search for plain meaning, a court should consider 'every phrase and clause ... in light of all the other phraseology contained in the instrument, which must be considered as a workable and harmonious means for carrying out and effectuating the intent of the parties.” · 4 citing courts
9
GREENCoal. for Competitive Elec. v. Zibelman, 906 F.3d 41 (2d Cir. 2018).
cites § 824d 3×subsections: (a) 3×cited by 71 cases
Where it cites § 824d
“FERC must ensure that "[a]ll rates and charges made, demanded, or received by any public utility for or in connection with the transmission or sale of electric energy subject to the jurisdiction of the Commission .”
The case’s holding
A state program exerting downward pressure on wholesale electricity rates is insufficient to state a claim for field preemption under the Federal Power Act (downward pressure on wholesale electricity rates).
Later courts cite it for
“construe the complaint liberally, accept all factual allegations as true, and draw all reasonable inferences in the plaintiff's favor.” · 30 citing courts
cites § 824d 4×subsections: (a) (c) (d) (e)cited by 86 cases
Where it cites § 824d
“In general, the federal government through FERC regulates the interstate wholesale electricity market, while the states regulate the retail sale of this power to consumers. FERC regulates the sale of wholesale electricity through rate regulation.”
The case’s holding
A state law breach of contract claim does not arise under federal law merely because the subject matter involves rates subject to federal regulation.
Later courts cite it for
“case filed in state court may be removed to federal court only when the case originally could have been filed in federal court.” · 3 citing courts
11
GREENBelmont Mun. Light Dep't v. FERC, 38 F.4th 173 (D.C. Cir. 2022).
cites § 824d 8×subsections: (a) 3× (b) (c) (d)cited by 8 cases
Where it cites § 824d
“Section 205 of the FPA, codified at 16 U.S.C. § 824d, “confers upon FERC the duty to ensure that wholesale energy rates and services are just and reasonable.”
Later courts cite it for
“where there are multiple plaintiffs who assert overlapping arguments, at least one petitioner must have standing to seek each form of relief requested in the petitions for review.” · 3 citing courts
12
cites § 824d 5×subsections: (d) 3× (e) 2×cited by 138 cases
Where it cites § 824d
“At issue is a decision of the Federal Energy Regulatory Commission (FERC or Commission) to accept a rate filing by an electric power wholesaler under Section 205(d) of the Federal Power Act (the Act), 16 U.S.C. § 824d(d) (1976). 1 On December *237 29, 1978 intervenor Arizona…”
The case’s holding
An agency order is final for appellate review only when it imposes an obligation, denies a right, or fixes a legal relationship as a consummation of the administrative process.
Later courts cite it for
“an agency order is final for purposes of appellate review when it 'imposes an obligation, denies a right, or fixes some legal relationship as a consummation of the administrative process.” · 5 citing courts
13
GREENAdvanced Energy United, Inc. v. FERC, 82 F.4th 1095 (D.C. Cir. 2023).
cites § 824d 12×subsections: (a) 3× (g) 3× (c) 2× (b)cited by 4 cases
Where it cites § 824d
“FERC adopted the first order (“Deadlock Order”) by operation of law when its four Commissioners deadlocked 2-2 on whether the overall proposal was “just and reasonable” and otherwise met the requirements of the Federal Power Act (“FPA” or “Act”), 16 U.S.C. § 824d(a), and related…”
cites § 824d 10×subsections: (a) 4×cited by 11 cases
Reversed by Fed. Energy Regulatory Comm'n v. Elec. Power Supply Ass'n (2016): the U.S. Supreme Court's own opinion in this case.
Where it cites § 824d
“” Order 745-A, 2011 WL 6523756 , at *10 (quoting 16 U.S.C. §§ 824d, 824e). That is, an ISO’s or RTO’s market rules governing how a demand response resource may compete in its wholesale market, including the terms by which a demand response resource is to be compensated in the…”
The case’s holding
FERC may regulate practices affecting wholesale electricity rates, but may not directly regulate retail electricity demand, which the Federal Power Act reserves to the states.
Later courts cite it for
“direct effect . . . on wholesale electricity rates squarely within ferc's jurisdiction.” · 3 citing courts
cites § 824d 5×subsections: (a) (b) (d) (e)cited by 14 cases
Where it cites § 824d
“In December 2014, PJM submitted revised capacity market rules to the Federal Energy Regulatory Commission for its approval under section 205 of the Federal Power Act, 16 U.S.C. § 824d. PJM concurrently submitted a separate filing under section 206 of the Federal Power Act, 16 U.”
The case’s holding
FERC may approve capacity market rules requiring resources committed to supply power to perform during emergencies, with penalties for nonperformance, when the rules are just and reasonable and reasoned.
Later courts cite it for
“a commitment to produce electricity or forgo the consumption of electricity when required.” · 3 citing courts
16
GREENHughes v. Talen Energy Mktg., LLC, 578 U.S. 150 (2016).
cites § 824d 2×subsections: (a) 2×cited by 86 cases
Where it cites § 824d
“16 U. S. C. §824d(a). Cite as: 578 U. S. ____ (2016) 13 Opinion of the Court affect areas within FERC’s domain.”
The case’s holding
Federal law preempts state programs that effectively set interstate wholesale electricity rates by disregarding the rates established by FERC.
Later courts cite it for
“put simply, federal law preempts contrary state law.” · 14 citing courts
17
GREENAmeren Servs. Co. v. Fed. Energy Regulatory Comm'n, 880 F.3d 571 (D.C. Cir. 2018).
cites § 824d 5×subsections: (b) 2× (a)cited by 13 cases
Where it cites § 824d
“6 This unexecuted FCA was submitted pursuant to Section 205 of the Federal Power Act, 16 U.S.C. § 824d (2012). 7 Midwest Indep.”
The case’s holding
An agency acts arbitrarily and capriciously when it fails to meaningfully respond to a significant argument, here that compelled generator funding of network upgrades forces uncompensated risk and nonprofit operation.
Later courts cite it for
“the gravity of the orders' flaws, and the 'disruptive consequences' that may result.” · 3 citing courts
18
GREENUnited States Telecom Ass'n v. Fed. Commc'ns Comm'n, 825 F.3d 674 (D.C. Cir. 2016).
cites § 824d 2×cited by 79 cases
Where it cites § 824d
“”); Federal Power Act, 16 U.S.C. § 824d (“All rates and charges made, demanded, or received by any public utility for or in connection with the transmission or sale of electric energy subject to the jurisdiction of the Commission, and all rules and regulations affecting or…”
The case’s holding
Broadband providers do not receive First Amendment protection against net neutrality rules because they are not engaged in the indiscriminate, neutral transmission of speech.
Later courts cite it for
“entities that serve as conduits for speech produced by others receive first amendment protection . . . when the entities are not engaged in indiscriminate, neutral transmission of any and all users' speech.” · 4 citing courts
19
GREENAtl. City Elec. Co. v. Fed. Energy Regulatory Comm'n, 295 F.3d 1 (D.C. Cir. 2002).
cites § 824d 3×subsections: (b)cited by 106 cases
Where it cites § 824d
“These orders directed the owners of transmission assets entering into an agreement for an Independent System Operator (“ISO”) to give up their right to file changes in tariff rates, terms, and conditions under section 205 of the Federal Power Act (“the Act”), 16 U.S.C. § 824d,…”
The case’s holding
An agency lacks authority to act in the absence of specific statutory authorization and cannot compel utilities to cede their statutory rate-filing rights.
Later courts cite it for
“assuming that there was no reason to question what transpired at the contract formation stage” · 3 citing courts
cites § 824d 6×subsections: (a) (c)cited by 22 cases
Where it cites § 824d
“” 16 U.S.C. § 824d. In 2006, FERC issued an order (the “2006 Order”) approving a new tariff — a set of rules and policies governing the interstate sale of electricity and electric capacity — for the PJM market, a vast region covering thirteen states and the District of Columbia.”
The case’s holding
FERC may eliminate minimum offer price rule exemptions for state-mandated resources because state-subsidized resources risk suppressing auction prices and undermining market integrity.
Later courts cite it for
“declining to accord states an opportunity to justify their initiatives on policy grounds, instead . . . requiring them to submit cost-based offers like other entrants or suffer the consequences of mitigation.” · 3 citing courts

Show all 574 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
194419852026

One bar per 2 years. Tallest: 40 cases in 2024–2025. 2026 is a partial year. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
D.C. Cir.2939th Cir.36SCOTUS295th Cir.251st Cir.237th Cir.163rd Cir.124th Cir.11

The 8 courts with the most citing cases, of 66 courts in all.

By subsection
(a)254 cases
Fed. Energy Regulatory Comm'n v. Elec. Power Supply Ass'n, 577 U.S. 260 (2016).“719, the Rule explained that the FPA gives FERC jurisdiction over such bids because they "directly affect [ ] wholesale rates.”
Coal. for Competitive Elec. v. Zibelman, 906 F.3d 41 (2d Cir. 2018).“FERC must ensure that "[a]ll rates and charges made, demanded, or received by any public utility for or in connection with the transmission or sale of electric energy subject to the jurisdiction of the Commission .”
Maine v. Fed. Energy Regulatory Comm'n, 854 F.3d 9 (D.C. Cir. 2017).“This is known as “rolled-in” ratemaking. See, e.g., Otter Tail Power Co., 12 FERC ¶ 61,169 at 61,420 (1980).”
Hughes v. Talen Energy Mktg., LLC, 578 U.S. 150 (2016).“16 U. S. C. §824d(a). Cite as: 578 U. S. ____ (2016) 13 Opinion of the Court affect areas within FERC’s domain.”
Showing the top 5 of 254. More in the list view →
(b)60 cases
City of Vernon v. Fed. Energy Regulatory Comm'n, 845 F.2d 1042 (D.C. Cir. 1988).
Ameren Servs. Co. v. Fed. Energy Regulatory Comm'n, 880 F.3d 571 (D.C. Cir. 2018).“6 This unexecuted FCA was submitted pursuant to Section 205 of the Federal Power Act, 16 U.S.C. § 824d (2012). 7 Midwest Indep.”
Atl. City Elec. Co. v. Fed. Energy Regulatory Comm'n, 295 F.3d 1 (D.C. Cir. 2002).“These orders directed the owners of transmission assets entering into an agreement for an Independent System Operator (“ISO”) to give up their right to file changes in tariff rates, terms, and conditions under section 205 of the Federal Power Act (“the Act”), 16 U.S.C. § 824d,…”
Orangeburg v. Fed. Energy Regulatory Comm'n, 862 F.3d 1071 (D.C. Cir. 2017).
Showing the top 5 of 60. More in the list view →
(b)(1)1 case
EDF Renewables, Inc. v. FERC, No. 23-1520, 23-1524 (8th Cir. Sept. 16, 2024).
(b)(2)1 case
(c)108 cases
West Deptford Energy, LLC v. Fed. Energy Regulatory Comm'n, 766 F.3d 10 (D.C. Cir. 2014).“§ 824d(a) & (c) (emphasis added). Furthermore, if a utility makes any changes to a filed “rate, charge, classification, or service,” its public filing with the Commission must “stat[e] plainly” both the changes made to the tariff “then in force,” and “the time when the change or…”
Boston Edison Co. v. Fed. Energy Regulatory Comm'n, 856 F.2d 361 (1st Cir. 1988).“A regulated energy seller must file with FERC all rates and the “classifications, practices, and regulations affecting such rates and charges, together with all contracts which in any manner affect or relate to such rates, charges, classifications, and services.”
Showing the top 5 of 108. More in the list view →
(d)96 cases
Verizon Commc'ns Inc. v. Fed. Commc'ns Comm'n, 535 U.S. 467 (2002).“821 , Congress departed from the scheme of purely tariff-based regulation and acknowledged that contracts between commercial buyers and sellers could be used in ratesetting, 16 U.”
Papago Tribal Util. Auth. v. Fed. Energy Regulatory Comm'n, 628 F.2d 235 (D.C. Cir. 1980).“At issue is a decision of the Federal Energy Regulatory Commission (FERC or Commission) to accept a rate filing by an electric power wholesaler under Section 205(d) of the Federal Power Act (the Act), 16 U.S.C. § 824d(d) (1976). 1 On December *237 29, 1978 intervenor Arizona…”
Showing the top 5 of 96. More in the list view →
(e)103 cases
Ne. Rural Elec. Membership Corp. v. Wabash Valley Power Ass'n, 707 F.3d 883 (7th Cir. 2013).“In general, the federal government through FERC regulates the interstate wholesale electricity market, while the states regulate the retail sale of this power to consumers. FERC regulates the sale of wholesale electricity through rate regulation.”
Showing the top 5 of 103. More in the list view →
(f)6 cases
Showing the top 5 of 6. More in the list view →
(f)(1)(B)1 case
(f)(4)1 case
Gulf Power Co. v. Fed. Energy Regulatory Comm'n, 983 F.2d 1095 (D.C. Cir. 1993).
(g)5 cases
Advanced Energy United, Inc. v. FERC, 82 F.4th 1095 (D.C. Cir. 2023).“FERC adopted the first order (“Deadlock Order”) by operation of law when its four Commissioners deadlocked 2-2 on whether the overall proposal was “just and reasonable” and otherwise met the requirements of the Federal Power Act (“FPA” or “Act”), 16 U.S.C. § 824d(a), and related…”
PJM Power Providers Grp. v. FERC, 88 F.4th 250 (3d Cir. 2023).
Advanced Energy United, Inc. v. FERC (AMENDED OPINION), No. 22-1018 (D.C. Cir. Sept. 19, 2023).
PJM Power Providers Grp. v. FERC, No. 21-3068 (3d Cir. Jan. 4, 2024).
PJM Power Providers Grp. v. FERC, No. 21-3068 (3d Cir. Jan. 24, 2024).
(g)(1)2 cases
Advanced Energy United, Inc. v. FERC, 82 F.4th 1095 (D.C. Cir. 2023).
Advanced Energy United, Inc. v. FERC (AMENDED OPINION), No. 22-1018 (D.C. Cir. Sept. 19, 2023).

Show all 574 citing cases (list view) →

Enactment and amendments
(June 10, 1920, ch. 285, pt. II, § 205, as added Aug. 26, 1935, ch. 687, title II, § 213, 49 Stat. 851; amended Pub. L. 95–617, title II, §§ 207(a), 208, Nov. 9, 1978, 92 Stat. 3142; Pub. L. 115–270, title III, § 3006, Oct. 23, 2018, 132 Stat. 3868.)
Amendment years (notes): 2018, 1978