Notes of Decisions
Cited in
16
cases (
3 in the last 5 years), 2009–2026 · leading case:
Trump v. Hawaii, 138 S. Ct. 2392 (2018).
Trump v. Hawaii, 138 S. Ct. 2392 (2018).
“, 16 U. S. C. §824o–1(b); 42 U. S. C. §5192 ; 50 U.”
Sw. Power Admin. v. Fed. Energy Regulatory Comm'n, 763 F.3d 27 (D.C. Cir. 2014).
· cites it 5× “See 16 U.S.C. § 824o. The bulk-power system is the interconnected transmission network that makes up the nation’s electrical power grid, including the power plants and related facilities responsible for transferring electrical energy through the system.”
New York v. Fed. Energy Regulatory Comm'n, 783 F.3d 946 (2d Cir. 2015).
· cites it 5× “See 16 U.S.C. § 824o (authorizing FERC to impose reliability standards on facilities that comprise “bulk-power system,” defined to include “facilities and control systems necessary for operating an interconnected electric energy transmission network”).”
PPL Energyplus, LLC v. Nazarian, 974 F. Supp. 2d 790 (D. Maryland 2013).
· cites it 3× “594 , 941 (codified at 16 U.S.C. § 824o); Mandatory Reliability Standards for the Bulk-Power System, 72 Fed.”
Piedmont Env't v. Virginia Elec., 684 S.E.2d 805 (Va. 2009).
“16 U.S.C. § 824o(a)(2). Not surprisingly, NERC was the sole applicant which sought to be designated as the national Electric Reliability Organization and was subsequently designated by FERC to fulfill that role.”
Turlock Irrigation Dist. v. Ferc, 903 F.3d 862 (9th Cir. 2018).
“FERC 17 term “reliable operation,” Federal Power Act, 16 U.S.C. § 824o, that arguably supports FERC’s understanding of “reliability impacts,” but it was not mentioned in FERC’s orders or in its briefs.”
Robert Waldon v. Arizona Pub. Serv. Co., 642 F. App'x 667 (9th Cir. 2016).
· cites it 2× “They alleged that Arizona Public Service Company (“APS”), an Arizona-based electric utility, 1 violated federal electricity-reliability standards, see 16 U.S.C. § 824o, which caused the ensuing cascading blackout, and that APS is thus negligent per se under Arizona law.”
Cogentrix Energy Power Mgmt., LLC v. FERC, 24 F.4th 677 (D.C. Cir. 2022).
· cites it 2× “2 The Act created FPA § 215, 16 U.S.C. § 824o, which gives the Commission the power to “adopt and enforce mandatory technical reliability standards for facilities that make up the national energy grid.”
— 16 U.S.C. § 824o(a) — 1 case
Sw. Power Admin. v. Fed. Energy Regulatory Comm'n, 763 F.3d 27 (D.C. Cir. 2014).
“See 16 U.S.C. § 824o. The bulk-power system is the interconnected transmission network that makes up the nation’s electrical power grid, including the power plants and related facilities responsible for transferring electrical energy through the system.”
— 16 U.S.C. § 824o(a)(2) — 2 cases
Piedmont Env't v. Virginia Elec., 684 S.E.2d 805 (Va. 2009).
“16 U.S.C. § 824o(a)(2). Not surprisingly, NERC was the sole applicant which sought to be designated as the national Electric Reliability Organization and was subsequently designated by FERC to fulfill that role.”
— 16 U.S.C. § 824o(b)(1) — 1 case
— 16 U.S.C. § 824o(b)(l) — 1 case
Sw. Power Admin. v. Fed. Energy Regulatory Comm'n, 763 F.3d 27 (D.C. Cir. 2014).
“See 16 U.S.C. § 824o. The bulk-power system is the interconnected transmission network that makes up the nation’s electrical power grid, including the power plants and related facilities responsible for transferring electrical energy through the system.”
— 16 U.S.C. § 824o(c) — 2 cases
New York v. Fed. Energy Regulatory Comm'n, 783 F.3d 946 (2d Cir. 2015).
“See 16 U.S.C. § 824o (authorizing FERC to impose reliability standards on facilities that comprise “bulk-power system,” defined to include “facilities and control systems necessary for operating an interconnected electric energy transmission network”).”
Cogentrix Energy Power Mgmt., LLC v. FERC, 24 F.4th 677 (D.C. Cir. 2022).
“2 The Act created FPA § 215, 16 U.S.C. § 824o, which gives the Commission the power to “adopt and enforce mandatory technical reliability standards for facilities that make up the national energy grid.”
— 16 U.S.C. § 824o(d)(4) — 1 case
— 16 U.S.C. § 824o(e)(l) — 1 case
Sw. Power Admin. v. Fed. Energy Regulatory Comm'n, 763 F.3d 27 (D.C. Cir. 2014).
“See 16 U.S.C. § 824o. The bulk-power system is the interconnected transmission network that makes up the nation’s electrical power grid, including the power plants and related facilities responsible for transferring electrical energy through the system.”
— 16 U.S.C. § 824o(i) — 1 case
PPL Energyplus, LLC v. Nazarian, 974 F. Supp. 2d 790 (D. Maryland 2013).
“594 , 941 (codified at 16 U.S.C. § 824o); Mandatory Reliability Standards for the Bulk-Power System, 72 Fed.”
— 16 U.S.C. § 824o(i)(2) — 2 cases
— 16 U.S.C. § 824o(i)(3) — 2 cases
PPL Energyplus, LLC v. Nazarian, 974 F. Supp. 2d 790 (D. Maryland 2013).
“594 , 941 (codified at 16 U.S.C. § 824o); Mandatory Reliability Standards for the Bulk-Power System, 72 Fed.”
Annotations are extracted automatically from the opinions in the
Syfert caselaw corpus and ranked by authority, recency, and
treatment. Dots show Syfertize treatment of the citing case itself.