31 U.S.C. § 3902 (2026)

Interest penalties

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1988–2023 36citing cases
At a glance

Courts have cited this section in 36 opinions since 1988, 2 of them in the last five years.

(a) Under regulations prescribed under section 3903 of this title, the head of an agency acquiring property or service from a business concern, who does not pay the concern for each complete delivered item of property or service by the required payment date, shall pay an interest penalty to the concern on the amount of the payment due. The interest shall be computed at the rate of interest established by the Secretary of the Treasury, and published in the Federal Register, for interest payments under section 7109(a)(1) and (b) of title 41, which is in effect at the time the agency accrues the obligation to pay a late payment interest penalty.(b) The interest penalty shall be paid for the period beginning on the day after the required payment date and ending on the date on which payment is made.(c)(1) A business concern shall be entitled to an interest penalty of $1.00 or more which is owed such business concern under this section, and such penalty shall be paid without regard to whether the business concern has requested payment of such penalty.(2) Each payment subject to this chapter for which a late payment interest penalty is required to be paid shall be accompanied by a notice stating the amount of the interest penalty included in such payment and the rate by which, and period for which, such penalty was computed.(3) If a business concern—(A) is owed an interest penalty by an agency;(B) is not paid the interest penalty in a payment made to the business concern by the agency on or after the date on which the interest penalty becomes due;(C) is not paid the interest penalty by the agency within 10 days after the date on which such payment is made; and(D) makes a written demand, not later than 40 days after the date on which such payment is made, that the agency pay such a penalty,such business concern shall be entitled to an amount equal to the sum of the late payment interest penalty to which the contractor is entitled and an additional penalty equal to a percentage of such late payment interest penalty specified by regulation by the Director of the Office of Management and Budget, subject to such maximum as may be specified in such regulations.(d) The temporary unavailability of funds to make a timely payment due for property or services does not relieve the head of an agency from the obligation to pay interest penalties under this section.(e) An amount of an interest penalty unpaid after any 30-day period shall be added to the principal amount of the debt, and a penalty accrues thereafter on the added amount.(f) This section does not authorize the appropriation of additional amounts to pay an interest penalty. The head of an agency shall pay a penalty under this section out of amounts made available to carry out the program for which the penalty is incurred.(g) A recipient of a grant from the head of an agency may provide in a contract for the acquisition of property or service from a business concern that, consistent with the usual business practices of the recipient and applicable State and local law, the recipient will pay an interest penalty on amounts overdue under the contract under conditions agreed to by the recipient and the concern. The recipient may not pay the penalty from amounts received from an agency. Amounts expended for the penalty may not be counted toward a matching requirement applicable to the grant. An obligation to pay the penalty is not an obligation of the United States Government.(h)(1) This section shall apply to contracts for the procurement of property or services entered into pursuant to section 4(h) of the Act of June 29, 1948 (15 U.S.C. 714b(h)).(2)(A) In the case of a payment to which producers on a farm are entitled under the terms of an agreement entered into under the Agricultural Act of 1949 (7 U.S.C. 1421 et seq.), an interest penalty shall be paid to the producers if the payment has not been made by the required payment or loan closing date. The interest penalty shall be paid—(i) on the amount of payment or loan due; and(ii) for the period beginning on the first day beginning after the required payment or loan closing date and ending on the date the amount is paid or loaned.(B) As used in this subsection, the “required payment or loan closing date” means—(i) for a purchase agreement, the 30th day after delivery of the warehouse receipt for the commodity subject to the purchase agreement;(ii) for a loan agreement, the 30th day beginning after the date of receipt of an application with all requisite documentation and signatures, unless the applicant requests that the disbursement be deferred;(iii) for refund of amounts received greater than the amount required to repay a commodity loan, the first business day after the Commodity Credit Corporation receives payment for such loan;(iv) for land diversion payments (other than advance payments), the 30th day beginning after the date of completion of the production adjustment contract by the producer;(v) for an advance land diversion payment, 30 days after the date the Commodity Credit Corporation executes the contract with the producer;(vi) for a deficiency payment (other than advance payments) based upon a 12-month or 5-month period, 91 days after the end of such period; or(vii) for an advance deficiency payment, 30 days after the date the Commodity Credit Corporation executes the contract with the producer.(3) Payment of the interest penalty under this subsection shall be made out of funds available under section 8 of the Act of June 29, 1948 (15 U.S.C. 714f).(4)Section 3907 of this title shall not apply to interest penalty payments made under this subsection.(Added Pub. L. 97–452, § 1(18)(A), Jan. 12, 1983, 96 Stat. 2475; amended Pub. L. 98–216, § 1(6), Feb. 14, 1984, 98 Stat. 4; Pub. L. 100–496, § 3, Oct. 17, 1988, 102 Stat. 2456; Pub. L. 105–362, title XIII, § 1301(c)(2)(B), Nov. 10, 1998, 112 Stat. 3293; Pub. L. 111–350, § 5(h)(7), Jan. 4, 2011, 124 Stat. 3849.)

Historical and Revision Notes

1982 Act

Revised Section

Source (U.S. Code)

Source (Statutes at Large)

3902(a)

31 App.:1801(a)(1), (b)(1) (2d, last sentences).

May 21, 1982, Pub. L. 97–177, § 2(a)(1), (b)–(d), 96 Stat. 85.

3902(b)

31 App.:1801(b)(1) (1st sentence).

3902(c)

31 App.:1801(b)(2).

3902(d)

31 App.:1801(c).

3902(e)

31 App.:1801(d).

In subsection (a), the words “under section 3903 of this title” are substituted for “by the Director of the Office of Management and Budget” because of the restatement. The words “in accordance with this section” are omitted as surplus.

In subsection (b), before clause (1), the words “on amounts due to a business concern under this chapter . . . to the business concern”, “of the amount due”, and “complete delivered . . . of property or service concerned” are omitted as surplus.

In subsection (c), the words “which remains” are omitted as surplus.

In subsection (e), the words “terms and” and “non-Federal” are omitted as surplus. The word “Government” is added for consistency in the revised title and with other titles of the United States Code.

1984 Act

This is necessary to correct cross-references in section 3902(b).

Editorial NotesReferences in Text

The Agricultural Act of 1949, referred to in subsec. (h)(2)(A), is act Oct. 31, 1949, ch. 792, 63 Stat. 1051, which is classified principally to chapter 35A (§ 1421 et seq.) of Title 7, Agriculture. For complete classification of this Act to the Code, see Short Title note set out under section 1421 of Title 7 and Tables.

Amendments

2011—Subsec. (a). Pub. L. 111–350 substituted “section 7109(a)(1) and (b) of title 41” for “section 12 of the Contract Disputes Act of 1978 (41 U.S.C. 611)”.

1998—Subsec. (b). Pub. L. 105–362 substituted “The” for “Except as provided in section 3906 of this title, the”.

1988—Subsec. (a). Pub. L. 100–496, § 3(a)(1), substituted “The interest shall be computed at the rate of interest established by the Secretary of the Treasury, and published in the Federal Register, for interest payments under section 12 of the Contract Disputes Act of 1978 (41 U.S.C. 611), which is in effect at the time the agency accrues the obligation to pay a late payment interest penalty” for “The interest shall be computed at the rate the Secretary of the Treasury establishes for interest payments under section 12 of the Contract Disputes Act of 1978 (41 U.S.C. 611). The Secretary shall publish each rate in the Federal Register”.

Subsec. (b). Pub. L. 100–496, § 3(a)(2), struck out second sentence which read as follows: “However, a penalty may not be paid if payment for the item is made—

“(1) when the item is a meat or meat food product described in section 3903(2) of this title, before the 4th day after the required payment date;

“(2) when the item is an agricultural commodity described in section 3903(3) of this title, before the 6th day after the required payment date; or

“(3) when the item is not an item referred to in clauses (1) and (2) of this subsection, before the 16th day after the required payment date.”

Subsecs. (c) to (g). Pub. L. 100–496, § 3(b), added subsecs. (c) and (d) and redesignated former subsecs. (c) to (e) as (e) to (g), respectively.

Subsec. (h). Pub. L. 100–496, § 3(c), added subsec. (h).

1984—Subsec. (b). Pub. L. 98–216 substituted “3903(2)” for “3903(2)(A)” in par. (1) and “3903(3)” for “3903(2)(B)” in par. (2).

Statutory Notes and Related SubsidiariesEffective Date of 1988 Amendment

Pub. L. 100–496, § 14(a)–(c), Oct. 17, 1988, 102 Stat. 2465, 2466, provided that:“(a) The amendments made by sections 2(a), 2(b), 3(a), 4 through 9, 12, and 13 of this Act [enacting section 3905 of this title, amending this section, sections 3901, 3903, and 3904 of this title and section 644 of Title 15, Commerce and Trade, renumbering sections 3905 and 3906 of this title as sections 3906 and 3907, respectively, and repealing provisions set out as a note under section 3903 of this title] shall apply to payments under contracts awarded, contracts renewed, and contract options exercised during or after the first fiscal quarter which begins more than 90 days after the date of the enactment of this Act [Oct. 17, 1988].“(b) The requirements of section 3902(c)(2) of title 31, United States Code, as added by section 3(b) of this Act, shall apply to payments under contracts awarded on or after October 1, 1989.“(c) The amendments made by sections 2(c) and 3(c) of this Act [amending this section, section 3901 of this title, and section 410 of Title 39, Postal Service] shall be applicable with respect to all obligations incurred on or after January 1, 1989.”

Payment of Interest Penalties by Department of Defense

Pub. L. 107–117, div. A, title VIII, § 8084, Jan. 10, 2002, 115 Stat. 2266, provided that: “Notwithstanding 31 U.S.C. 3902, during the current fiscal year and hereafter, interest penalties may be paid by the Department of Defense from funds financing the operation of the military department or defense agency with which the invoice or contract payment is associated.”

Similar provisions were contained in the following prior appropriation acts:

Pub. L. 106–259, title VIII, § 8083, Aug. 9, 2000, 114 Stat. 692.

Pub. L. 106–79, title VIII, § 8088, Oct. 25, 1999, 113 Stat. 1252.

Pub. L. 105–262, title VIII, § 8092, Oct. 17, 1998, 112 Stat. 2319.

Pub. L. 105–56, title VIII, § 8103, Oct. 8, 1997, 111 Stat. 1243.

Interest Penalties for Late Payment of Interim Payments Due Under Government Service Contracts

Pub. L. 106–398, § 1 [[div. A], title X, § 1010], Oct. 30, 2000, 114 Stat. 1654, 1654A–251, as amended by Pub. L. 107–107, div. A, title X, § 1007, Dec. 28, 2001, 115 Stat. 1204, provided that:“(a)Prompt Payment Requirement for Interim Payments.—Under regulations prescribed under subsection (c), the head of an agency acquiring services from a business concern under a cost reimbursement contract requiring interim payments who does not pay the concern a required interim payment by the date that is 30 days after the date of the receipt of a proper invoice shall pay an interest penalty to the concern on the amount of the payment due. The interest shall be computed as provided in section 3902(a) of title 31, United States Code.“(b)Regulations.—The Director of the Office of Management and Budget shall prescribe regulations to carry out this section. Such regulations shall be prescribed as part of the regulations prescribed under section 3903 of title 31, United States Code.“(c)Incorporation of Certain Provisions of Law.—The provisions of chapter 39 of title 31, United States Code, shall apply to this section in the same manner as if this section were enacted as part of such chapter.“(d)Effective Date.—Subsection (a) shall take effect on December 15, 2000, and shall apply with respect to interim payments that are due on or after such date under contracts entered into before, on, or after that date. No interest shall accrue by reason of that subsection for any period before that date.”

The 20 cases that cite 31 U.S.C. § 3902 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENSarang Corp. v. United States, 76 Fed. Cl. 560 (Fed. Cl. 2007).
cites § 3902 5×cited by 9 cases
Summary
No passage or summary on file for this case yet.
2
GREENGutz v. United States, 45 Fed. Cl. 291 (Fed. Cl. 1999).
cites § 3902 4×cited by 14 cases
Where it cites § 3902
“” 31 U.S.C. § 3902 (a) (1994). In addition, “[i]n the case of a payment to which producers on a farm are entitled under the terms of an agreement entered into under the Agricultural Act of 1949, 7 U.”
Later courts cite it for
“meaning that would be derived from the contract by a reasonable intelligent person acquainted with the contemporaneous circumstances. a court must give reasonable meaning to all parts of the contract and not render portions of the contract meaningless.” · 2 citing courts
3
GREENMarquardt Co. v. United States, 95 Fed. Cl. 14 (Fed. Cl. 2010).
cites § 3902 7×cited by 3 cases
Where it cites § 3902
“31 U.S.C. § 3902 (a). The interest penalty “shall be paid for the period beginning on the day after the required payment date and ending on the date on which payment is made.”
4
GREENGPA-I, LP v. United States, 46 Fed. Cl. 762 (Fed. Cl. 2000).
cites § 3902 3×cited by 17 cases
Where it cites § 3902
“The PPA requires payment of interest at a specific rate, see 31 U.S.C. § 3902 , and requires that the government calculate this amount itself in the first instance.”
Later courts cite it for
“a contractor's suggestion of a meeting and expression of hope that a dispute could be settled does not prevent a writing from being a cda claim” · 2 citing courts
5
NO FLAGDavidson v. Veneman, 317 F.3d 503 (5th Cir. 2003).
cites § 3902 4×cited by 27 cases
Where it cites § 3902
“The Prompt Payment Act, 31 U.S.C. § 3902 , operates as such a waiver in specific, enumerated circumstances.”
6
GREENS. Comfort Builders, Inc. v. United States, 67 Fed. Cl. 124 (Fed. Cl. 2005).
cites § 3902 2×cited by 9 cases
Where it cites § 3902
“31 U.S.C. § 3902 (a)-(b). “The Prompt Payment Act of 1982 was enacted in order to *156 provide incentives for the Federal Government to pay its bills on time____ If the government would properly implement the Act’s requirements to pay its bills in a timely fashion, the price it…”
7
GREENDMS Imaging, Inc. v. United States, 123 Fed. Cl. 645 (Fed. Cl. 2015).
cites § 3902 2×cited by 8 cases
Where it cites § 3902
“§ 7100 et seq; Breach of Contract; Risk of Loss Clause; Specific Performance; Prompt Payment Act, 31 U.S.C. § 3902 (a); Constructive Termination; Frustration of Purpose Doctrine; Damages; Causation; Foreseeability; Reasonable Certainty; Interest; Attorney’s Fees.”
Later courts cite it for
“the tucker act statutorily waives the government's sovereign immunity for a plaintiff's substantive common law contract claims and claims under the contract disputes act.” · 2 citing courts
8
GREENYoungdale & Sons Constr. Co. v. United States, 27 Fed. Cl. 516 (Fed. Cl. 1993).
cites § 3902 1×cited by 52 cases
Where it cites § 3902
“31 U.S.C. § 3902 (a). With this in mind, we now turn to the CDA to determine what interest thereunder, if any, plaintiff is entitled to on the amount of liquidated damages.”
The case’s holding
Courts disfavor the total-cost method of proving damages and require the direct cost method unless the contractor establishes all necessary elements for the total-cost approach.
Later courts cite it for
“use of this method is highly disfavored by the courts, because it blandly assumes - that every penny of the plaintiffs costs are prima facia reasonable, that the bid was accurately and reasonably computed, and that the plaintiff is not responsible for any increases in cost.” · 6 citing courts
9
GREENPaalan v. United States, 51 Fed. Cl. 738 (Fed. Cl. 2002).
cites § 3902 1×cited by 20 cases
Where it cites § 3902
“Moreover, because he is not entitled to retainer pay, plaintiff is not entitled to “penalty interest,” as defined and authorized by 31 U.S.C. § 3902 (1994 & Supp. V 1999), for the failure of the Navy timely to render him such pay, and this claim is dismissed, as well.”
Later courts cite it for
“the fact that the government legally may have taken plaintiff's property as evidence, but then lost it, does not state a claim for a taking, because the government thereby does not take property for public use.” · 3 citing courts
10
GREENEnv't Saf. Consultants, Inc. v. United States, 95 Fed. Cl. 77 (Fed. Cl. 2010).
cites § 3902 1×cited by 18 cases
Where it cites § 3902
“” 31 U.S.C. § 3902 (a) (2006). . 31 U.S.C. § 3907 (c) shows that the PPA is inapplicable when there is a dispute between the parties: Except as provided in section 3904 of this title, this chapter does not require an interest penalty on payment that is not made because of a…”
11
GREENFDL Tech., Inc. v. United States, 967 F.2d 1578 (Fed. Cir. 1992).
cites § 3902 1×cited by 30 cases
Where it cites § 3902
“Section 3902 states, in pertinent part, that: the head of an agency acquiring property or service from a business concern, who does not pay the concern for each complete delivered item of property or service by the required payment date, shall pay an interest penalty to the…”
12
GREENAnderson v. United States, 54 Fed. Cl. 620 (Fed. Cl. 2002).
cites § 3902 1×cited by 12 cases
Where it cites § 3902
“” 31 U.S.C. § 3902 (a). . The defendant’s motion to dismiss this claim for failure to state a claim upon which relief can be granted is considered a motion for summary judgment.”
Later courts cite it for
“the plaintiff's entitlement . . . rests solely upon interpretation of the cited statute and is thus amenable to resolution by summary judgment.” · 3 citing courts
13
GREENOcean Tech., Inc. v. United States, 19 Cl. Ct. 288 (Ct. Cl. 1990).
cites § 3902 1×cited by 20 cases
Where it cites § 3902
“00, to which plaintiff is due from August 29, 1986, to May 26, 1987, pursuant to 31 U.S.C. § 3902 (a). Thereafter, the Clerk of the Court shall enter judgment in accordance with this stipulation, plus interest pursuant to 41 U.”
Later courts cite it for
“performance having been fully completed, holding the obligation to pay unenforceable is not a position favored in this circuit.” · 2 citing courts
14
GREENBoers v. United States, 44 Fed. Cl. 725 (Fed. Cl. 1999).
cites § 3902 2×cited by 6 cases
Where it cites § 3902
“Plaintiffs also seek interest pursuant to the Prompt Payment Act, 31 U.S.C. §§ 3902 (a) et seq. (1994), and attorney fees and costs under the Equal Access to Justice Act (EAJA), 28 U.”
15
GREENNew York Guardian Mortgagee Corp. v. United States, 916 F.2d 1558 (Fed. Cir. 1990).
cites § 3902 1×cited by 12 cases
Where it cites § 3902
“Guardian brought suit in the Claims Court, seeking interest for the delay in payment under the Prompt Payment Act, 31 U.S.C. § 3902 (a), which provides in pertinent part: [T]he head of an agency acquiring property or service from a business concern, who does not pay the concern…”
16
GREENBay Cnty. v. United States, 114 Fed. Cl. 755 (Fed. Cl. 2014).
cites § 3902 2×cited by 2 cases
Where it cites § 3902
“See 31 U.S.C. § 3902 (a)(PPA) (“The interest shall be computed at the rate of interest established by the Secretary of the Treasury, and published in the Federal Register, for interest payments under section 7109(a)(1) and (b) of title 41, which is in effect at the time the…”
17
GREENAm. Sav. Bank, F.A. v. United States, 74 Fed. Cl. 756 (Fed. Cl. 2006).
cites § 3902 1×cited by 4 cases
Where it cites § 3902
“The Court agrees with the second option provided by the Plaintiffs in order to calculate damages rather than the first option of using the low-interest short-term treasury rates which would increase Plaintiffs recovery by decreasing the offset.”
Later courts cite it for
“because it was impossible to trace the 240 million used to meet regulatory capital requirements to particular assets, the trial court ... used an approximation.” · 1 citing court
18
GREENLaurelwood Homes LLC v. United States, 78 Fed. Cl. 290 (Fed. Cl. 2007).
cites § 3902 1×cited by 4 cases
Where it cites § 3902
“” 31 U.S.C. § 3902 (a) (2000). The relevant provision of the PPA for the inquiry here provides, in pertinent part, as follows: Except as provided in section 3904 of this title, this chapter does not require an interest penalty on payment that is not made because of a dispute…”
19
GREENPCL Constr. Servs., Inc. v. United States, 84 Fed. Cl. 601 (Fed. Cl. 2008).
cites § 3902 1×cited by 4 cases
Where it cites § 3902
“00 or more which is owed such business concern under this section, and such penalty shall be paid without regard to whether the business concern has requested payment of such penalty.”
20
GREENApplied Companies v. United States, 37 Fed. Cl. 749 (Fed. Cl. 1997).
cites § 3902 1×cited by 7 cases
Where it cites § 3902
“5 Applied filed its complaint in September 1995, alleging that “Defendant’s deduction of $1,907,328 from the contract payment was a breach of its contract with Applied.”

Show all 36 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198820052023

One bar per year. Tallest: 4 cases in 2016. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Fed. Cl.23A.S.B.C.A.4Fed. Cir.2E.D. Ark.110th Cir.15th Cir.1D.C. Cir.1Ct. Cl.1

The 8 courts with the most citing cases, of 10 courts in all.

By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Show all 36 citing cases (list view) →

Enactment and amendments
(Added Pub. L. 97–452, § 1(18)(A), Jan. 12, 1983, 96 Stat. 2475; amended Pub. L. 98–216, § 1(6), Feb. 14, 1984, 98 Stat. 4; Pub. L. 100–496, § 3, Oct. 17, 1988, 102 Stat. 2456; Pub. L. 105–362, title XIII, § 1301(c)(2)(B), Nov. 10, 1998, 112 Stat. 3293; Pub. L. 111–350, § 5(h)(7), Jan. 4, 2011, 124 Stat. 3849.)
Amendment years (notes): 2011, 1998, 1988, 1984