40 C.F.R. § 125.3 (2026)
Technology-based treatment requirements in permits
Edition and currency
Other sources
Courts have cited this section in 28 opinions since 1985, 2 of them in the last five years. The most litigated part is subsection (a) (1 case).
(a) General. Technology-based treatment requirements under section 301(b) of the Act represent the minimum level of control that must be imposed in a permit issued under section 402 of the Act. (See §§ 122.41, 122.42 and 122.44 for a discussion of additional or more stringent effluent limitations and conditions.) Permits shall contain the following technology-based treatment requirements in accordance with the following statutory deadlines;
(1) For POTW's, effluent limitations based upon:
(i) Secondary treatment—from date of permit issuance; and
(ii) [Reserved]
(2) For dischargers other than POTWs except as provided in § 122.29(d), effluent limitations requiring:
(i) The best practicable control technology currently available (BPT)—
(A) For effluent limitations promulgated under Section 304(b) after January 1, 1982 and requiring a level of control substantially greater or based on fundamentally different control technology than under permits for an industrial category issued before such date, compliance as expeditiously as practicable but in no case later than three years after the date such limitations are promulgated under section 304(b) and in no case later than March 31, 1989;
(B) For effluent limitations established on a case-by-case basis based on Best Professional Judgment (BPJ) under Section 402(a)(1)(B) of the Act in a permit issued after February 4, 1987, compliance as expeditiously as practicable but in no case later than three years after the date such limitations are established and in no case later than March 31, 1989;
(C) For all other BPT effluent limitations compliance is required from the date of permit issuance.
(ii) For conventional pollutants, the best conventional pollutant control technology (BCT)—
(A) For effluent limitations promulgated under section 304(b), as expeditiously as practicable but in no case later than three years after the date such limitations are promulgated under section 304(b), and in no case later than March 31, 1989.
(B) For effluent limitations established on a case-by-case (BPJ) basis under section 402(a)(1)(B) of the Act in a permit issued after February 4, 1987, compliance as expeditiously as practicable but in no case later than three years after the date such limitations are established and in no case later than March 31, 1989;
(iii) For all toxic pollutants referred to in Committee Print No. 95-30, House Committee on Public Works and Transportation, the best available technology economically achievable (BAT)—
(A) For effluent limitations established under section 304(b), as expeditiously as practicable but in no case later than three years after the date such limitations are promulgated under section 304(b), and in no case later than March 31, 1989.
(B) For permits issued on a case-by-case (BPJ) basis under section 402(a)(1)(B) of the Act after February 4, 1987 establishing BAT effluent limitations, compliance is required as expeditiously as practicable but in no case later than three years after the date such limitations are promulgated under section 304(b), and in no case later than March 31, 1989.
(iv) For all toxic pollutants other than those listed in Committee Print No. 95-30, effluent limitations based on BAT—
(A) For effluent limitations promulgated under section 304(b) compliance is required as expeditiously as practicable, but in no case later than three years after the date such limitations are promulgated under section 304(b) and in no case later than March 31, 1989.
(B) For permits issued on a case-by-case (BPJ) basis under Section 402(a)(1)(B) of the Act after February 4, 1987 establishing BAT effluent limitations, compliance is required as expeditiously as practicable but in no case later than 3 years after the date such limitations are established and in no case later than March 31, 1989.
(v) For all pollutants which are neither toxic nor conventional pollutants, effluent limitations based on BAT—
(A) For effluent limitations promulgated under section 304(b), compliance is required as expeditiously as practicable but in no case later than 3 years after the date such limitations are established and in no case later than March 31, 1989.
(B) For permits issued on a case-by-case (BPJ) basis under section 402(a)(1)(B) of the Act after February 4, 1987 establishing BAT effluent limitations compliance is required as expeditiously as practicable but in no case later than three years after the date such limitations are established and in no case later than March 31, 1989.
(b) Statutory variances and extensions. (1) The following variances from technology-based treatment requirements are authorized by the Act and may be applied for under § 122.21;
(i) For POTW's, a section 301(h) marine discharge variance from secondary treatment (subpart G);
(ii) For dischargers other than POTW's;
(A) A section 301(c) economic variance from BAT (subpart E);
(B) A section 301(g) water quality related variance from BAT (subpart F); and
(C) A section 316(a) thermal variance from BPT, BCT and BAT (subpart H).
(2) The following extensions of deadlines for compliance with technology-based treatment requirements are authorized by the Act and may be applied for under § 124.53:
(i) For POTW's a section 301(i) extension of the secondary treatment deadline (subpart J);
(ii) For dischargers other than POTW's:
(A) A section 301(i) extension of the BPT deadline (subpart J); and
(B) A section 301(k) extension of the BAT deadline (subpart C).
(c) Methods of imposing technology-based treatment requirements in permits. Technology-based treatment requirements may be imposed through one of the following three methods:
(1) Application of EPA-promulgated effluent limitations developed under section 304 of the Act to dischargers by category or subcategory. These effluent limitations are not applicable to the extent that they have been remanded or withdrawn. However, in the case of a court remand, determinations underlying effluent limitations shall be binding in permit issuance proceedings where those determinations are not required to be reexamined by a court remanding the regulations. In addition, dischargers may seek fundamentally different factors variances from these effluent limitations under § 122.21 and subpart D of this part.
(2) On a case-by-case basis under section 402(a)(1) of the Act, to the extent that EPA-promulgated effluent limitations are inapplicable. The permit writer shall apply the appropriate factors listed in § 125.3(d) and shall consider:
(i) The appropriate technology for the category or class of point sources of which the applicant is a member, based upon all available information; and
(ii) Any unique factors relating to the applicant.
(3) Through a combination of the methods in paragraphs (d) (1) and (2) of this section. Where promulgated effluent limitations guidelines only apply to certain aspects of the discharger's operation, or to certain pollutants, other aspects or activities are subject to regulation on a case-by-case basis in order to carry out the provisions of the Act.
(4) Limitations developed under paragraph (d)(2) of this section may be expressed, where appropriate, in terms of toxicity (e.g., “the LC
(d) In setting case-by-case limitations pursuant to § 125.3(c), the permit writer must consider the following factors:
(1) For BPT requirements: (i) The total cost of application of technology in relation to the effluent reduction benefits to be achieved from such application;
(ii) The age of equipment and facilities involved;
(iii) The process employed;
(iv) The engineering aspects of the application of various types of control techniques;
(v) Process changes; and
(vi) Non-water quality environmental impact (including energy requirements).
(2) For BCT requirements: (i) The reasonableness of the relationship between the costs of attaining a reduction in effluent and the effluent reduction benefits derived;
(ii) The comparison of the cost and level of reduction of such pollutants from the discharge from publicly owned treatment works to the cost and level of reduction of such pollutants from a class or category of industrial sources;
(iii) The age of equipment and facilities involved;
(iv) The process employed;
(v) The engineering aspects of the application of various types of control techniques;
(vi) Process changes; and
(vii) Non-water quality environmental impact (including energy requirements).
(3) For BAT requirements: (i) The age of equipment and facilities involved;
(ii) The process employed;
(iii) The engineering aspects of the application of various types of control techniques;
(iv) Process changes;
(v) The cost of achieving such effluent reduction; and
(vi) Non-water quality environmental impact (including energy requirements).
(e) Technology-based treatment requirements are applied prior to or at the point of discharge.
(f) Technology-based treatment requirements cannot be satisfied through the use of “non-treatment” techniques such as flow augmentation and in-stream mechanical aerators. However, these techniques may be considered as a method of achieving water quality standards on a case-by-case basis when:
(1) The technology-based treatment requirements applicable to the discharge are not sufficient to achieve the standards;
(2) The discharger agrees to waive any opportunity to request a variance under section 301 (c), (g) or (h) of the Act; and
(3) The discharger demonstrates that such a technique is the preferred environmental and economic method to achieve the standards after consideration of alternatives such as advanced waste treatment, recycle and reuse, land disposal, changes in operating methods, and other available methods.
(g) Technology-based effluent limitations shall be established under this subpart for solids, sludges, filter backwash, and other pollutants removed in the course of treatment or control of wastewaters in the same manner as for other pollutants.
(h)(1) The Director may set a permit limit for a conventional pollutant at a level more stringent than the best conventional pollution control technology (BCT), or a limit for a nonconventional pollutant which shall not be subject to modification under section 301 (c) or (g) of the Act where:
(i) Effluent limitations guidelines specify the pollutant as an indicator for a toxic pollutant, or
(ii)(A) The limitation reflects BAT-level control of discharges of one or more toxic pollutants which are present in the waste stream, and a specific BAT limitation upon the toxic pollutant(s) is not feasible for economic or technical reasons;
(B) The permit identifies which toxic pollutants are intended to be controlled by use of the limitation; and
(C) The fact sheet required by § 124.56 sets forth the basis for the limitation, including a finding that compliance with the limitation will result in BAT-level control of the toxic pollutant discharges identified in paragraph (h)(1)(ii)(B) of this section, and a finding that it would be economically or technically infeasible to directly limit the toxic pollutant(s).
(2) The Director may set a permit limit for a conventional pollutant at a level more stringent than BCT when:
(i) Effluent limitations guidelines specify the pollutant as an indicator for a hazardous substance, or
(ii)(A) The limitation reflects BAT-level control of discharges (or an appropriate level determined under section 301(c) or (g) of the Act) of one or more hazardous substance(s) which are present in the waste stream, and a specific BAT (or other appropriate) limitation upon the hazardous substance(s) is not feasible for economic or technical reasons;
(B) The permit identifies which hazardous substances are intended to be controlled by use of the limitation; and
(C) The fact sheet required by § 124.56 sets forth the basis for the limitation, including a finding that compliance with the limitations will result in BAT-level (or other appropriate level) control of the hazardous substances discharges identified in paragraph (h)(2)(ii)(B) of this section, and a finding that it would be economically or technically infeasible to directly limit the hazardous substance(s).
(iii) Hazardous substances which are also toxic pollutants are subject to paragraph (h)(1) of this section.
(3) The Director may not set a more stringent limit under the preceding paragraphs if the method of treatment required to comply with the limit differs from that which would be required if the toxic pollutant(s) or hazardous substance(s) controlled by the limit were limited directly.
(4) Toxic pollutants identified under paragraph (h)(1) of this section remain subject to the requirements of § 122.42(a)(1) (notification of increased discharges of toxic pollutants above levels reported in the application form).
- Where it cites § 125.3
- “5 The EPA has interpreted this regime as “preclud[ing] [it] from imposing any particular technology on a discharger.”
- The case’s holding
- Agency actions are binding and subject to judicial review if they restrict the discretion of regulated entities or are applied in a manner that is controlling in practice.
- Later courts cite it for
- “need not establish that all of its members would have standing to sue individually so long as it can show that 'any one of them' would have standing.” · 8 citing courts
- Where it cites § 125.3
- “” 40 C.F.R. § 125.3 (c)(2)-(d); See also Texas Oil, 161 F.”
- Where it cites § 125.3
- “These guidelines—often referred to as “ELGs”—consist of industry-specific, technology based effluent limitations, which require the use of “best practicable control technology currently available” that will result in reasonable progress toward the national goal of eliminating…”
- Where it cites § 125.3
- “See 40 C.F.R. § 125.3 (b). In addition, much of the concern over water transfers involved agricultural use, but water diversions from a “navigable water” for agricultural use direct water away from a “navigable water,” and thus do not trigger the need for a § 402 permit.”
- The case’s holding
- An agency's reasonable interpretation of an ambiguous statute it administers is entitled to deference under the Chevron framework.
- Later courts cite it for
- “we evaluate challenges to an agency's interpretation of a statute that it administers within the two-step chevron deference framework.” · 4 citing courts
- Where it cites § 125.3
- “” 40 C.F.R. § 125.3 (c)-(d). Individual judgments thus take the place of uniform national guidelines, but the technology-based standard remains the same.”
- Where it cites § 125.3
- “See 40 C.F.R. § 125.3 (a), (c)(2) ("Technology based treatment requirements may be imposed .”
- The case’s holding
- An agency action is arbitrary and capricious if the agency fails to examine relevant data or articulate a satisfactory explanation for its decision.
- Where it cites § 125.3
- “]” 40 CFR §125.3 (a). But even the most stringent technology based effluent limitations have not achieved water quality standards in thousands of the nation’s waterways.”
- The case’s holding
- A court reviews an agency's discretionary decisions under the arbitrary and capricious standard to determine if they were made unreasonably or without a rational basis.
- Later courts cite it for
- “when the interpretation resulted from a process of 'reasoned elaboration' by the agency, when the agency has applied that interpretation consistently over time, or when the interpretation is the product of contested adversarial proceedings or formal rule making.” · 7 citing courts
- Where it cites § 125.3
- “40 C.F.R. § 125.3 . In addition to these technology-based effluent limitations, the agency took into account factors imposed under § 403(c) of the Act to prevent unreasonable degradation of the marine environment.”
- The case’s holding
- An administrative agency must justify its actions based on the reasons stated at the time of the decision rather than relying on post hoc rationalizations.
- Later courts cite it for
- “epa would disserve its mandate were it to tilt at windmills by imposing bat limitations which removed de minimis amounts of polluting agents from our nation's waters, while imposing possibly disabling costs upon the regulated industry.” · 2 citing courts
- Where it cites § 125.3
- “See 40 C.F.R. § 125.3 (c)(1). ELGs are enforceable through their incorporation into a NPDES permit.”
- The case’s holding
- An agency acts arbitrarily and capriciously when it fails to explain why stricter pollution limits are not feasible despite evidence that available technologies could exceed current standards.
- Later courts cite it for
- “technology-forcing, meaning it should force agencies and permit applicants to adopt technologies that achieve the greatest reductions in pollution.” · 2 citing courts
- Where it cites § 125.3
- “§ 1342 (a)(1)(B), by application of the regulations at 40 C.F.R. § 125.3 (c) and (d). This permit authority applies where the EPA has not promulgated an applicable guideline.”
- Later courts cite it for
- “the general rule of appellate procedure is that issues not presented in an appellant's initial merits brief are waived.” · 3 citing courts
- Where it cites § 125.3
- “§ 1342 (a)(1)(B); 40 C.F.R. § 125.3 . In doing so, NYDEC will consider the available technologies, costs in relation to effluent reduction benefits, engineering aspects of various control techniques, available best management practices, and non-water-quality environmental…”
- Later courts cite it for
- “in calculating civil penalties under the cwa, the court may begin either with the violator's estimated economic benefit from noncompliance (known as the 'bottom-up' method) or with. the,. statutory maximum allowable penalty (known as the 'top-down' method).” · 2 citing courts
- Where it cites § 125.3
- “, 40 CFR § 125.3 (discussing technology-based effluent limitations).”
- Later courts cite it for
- “best management practices,' such as those incorporated in the permits at issue in this case, are a type of effluent limitation.” · 1 citing court
- Where it cites § 125.3
- “See 40 C.F.R. § 125.3 (2019). ELGs, in turn, address different classes of pollutants.”
- Where it cites § 125.3
- “The regulations allow EPA to impose the more stringent BAT limitations to control conventional pollutants and to remove the modifications required for nonconventional pollutants, if that pollutant may be characterized under 40 C.F.R. § 125.3 (h)(1) as an "indicator,” that is, a…”
- Later courts cite it for
- “a direct cost/benefit correlation is not required for bat, so even minimal environmental impact can be regulated, so long as the prescribed alternative is 'technologically and economically achievable.” · 2 citing courts
- Where it cites § 125.3
- “of the Honouliuli WWTP Permit and 40 C.F.R. § 125.3 (f). Compl., ¶¶ 61, 125.”
- Where it cites § 125.3
- “” 40 C.F.R. § 125.3 (c)(2) (2014). USEPA regulations describe this case-by-case process as incorporating a “Best Professional Judgment” standard.”
- Where it cites § 125.3
- “It contends that 40 C.F.R. §§ 125.3 (c) and (d) 13 mandate that the Department conduct a site-specific inquiry when no ELGs exist for the particular industry or the ELGs that do exist are inapplicable.”
- Later courts cite it for
- “offering authority to support its prior argument.” · 2 citing courts
- Where it cites § 125.3
- “§§ 1311 (b), 1314; 40 C.F.R. § 125.3 (c)(1) (1987). Such industry-wide guidelines have not yet been promulgated.”
- Where it cites § 125.3
- “” 40 C.F.R. § 125.3 (c)(4). Such a limit would typically state how great a concentration of a particular effluent would be necessary to kill a certain percentage of a particular type of marine life in a specified time period.”
- Later courts cite it for
- “does not empower the agency to regulate point sources themselves; rather, epa's jurisdiction under the operative statute is limited to regulating the discharge of pollutants.” · 4 citing courts
- Where it cites § 125.3
- “, 40 C.F.R. §§ 125.3 (c)(2), 122.44. MISC’s argument seems to be that because the EPA has not *205 heretofore regulated intake structures on a case-by-case basis as a condition of granting NPDES permits, it cannot begin doing so now without an explanation.”
- Later courts cite it for
- “narrow, limited to examining the administrative record to determine whether the agency decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment.” · 6 citing courts
Show all 28 citing cases (list view) →
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
One bar per year. Tallest: 5 cases in 2015. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.
The 8 courts with the most citing cases, of 16 courts in all.
(a)1 case
(c)1 case
Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.
Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.