U.S.C. homeSearch U.S. Code
U.S. CodeTitle 43Chapter 7— HomesteadsSubchapter X— Stock-Raising Homestead

43 U.S.C. § 299 (2026)

Reservation of coal and mineral rights

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1931–2018 36citing cases
At a glance

Courts have cited this section in 36 opinions since 1931. The most litigated part is subsection (a) (1 case).

(a) General provisions

All entries made and patents issued under the provisions of this subchapter shall be subject to and contain a reservation to the United States of all the coal and other minerals in the lands so entered and patented, together with the right to prospect for, mine, and remove the same. The coal and other mineral deposits in such lands shall be subject to disposal by the United States in accordance with the provisions of the coal and mineral land laws in force at the time of such disposal. Any person qualified to locate and enter the coal or other mineral deposits, or having the right to mine and remove the same under the laws of the United States, shall have the right at all times to enter upon the lands entered or patented, as provided by this subchapter, for the purpose of prospecting for coal or other mineral therein, provided he shall not injure, damage, or destroy the permanent improvements of the entryman or patentee, and shall be liable to and shall compensate the entryman or patentee for all damages to the crops on such lands by reason of such prospecting. Any person who has acquired from the United States the coal or other mineral deposits in any such land, or the right to mine and remove the same, may reenter and occupy so much of the surface thereof as may be required for all purposes reasonably incident to the mining or removal of the coal or other minerals, first, upon securing the written consent or waiver of the homestead entryman or patentee; second, upon payment of the damages to crops or other tangible improvements to the owner thereof, where agreement may be had as to the amount thereof; or, third, in lieu of either of the foregoing provisions, upon the execution of a good and sufficient bond or undertaking to the United States for the use and benefit of the entryman or owner of the land, to secure the payment of such damages to the crops or tangible improvements of the entryman or owner, as may be determined and fixed in an action brought upon the bond or undertaking in a court of competent jurisdiction against the principal and sureties thereon, such bond or undertaking to be in form and in accordance with rules and regulations prescribed by the Secretary of the Interior and to be filed with and approved by the officer designated by the Secretary of the Interior of the local land office of the district wherein the land is situate, subject to appeal to the Secretary of the Interior or such officer as he may designate: Provided, That all patents issued for the coal or other mineral deposits herein reserved shall contain appropriate notations declaring them to be subject to the provisions of this subchapter with reference to the disposition, occupancy, and use of the land as permitted to an entryman under this subchapter.

(b) Exploration; location of mining claims; notices(1) In general(A) Notwithstanding subsection (a) and any other provision of law to the contrary, after the effective date of this subsection no person other than the surface owner may enter lands subject to this subchapter to explore for, or to locate, a mining claim on such lands without—(i) filing a notice of intention to locate a mining claim pursuant to paragraph (2); and(ii) providing notice to the surface owner pursuant to paragraph (3).(B) Any person who has complied with the requirements referred to in subparagraph (A) may, during the authorized exploration period, in order to locate a mining claim, enter lands subject to this subchapter to undertake mineral activities related to exploration that cause no more than a minimal disturbance of surface resources and do not involve the use of mechanized earthmoving equipment, explosives, the construction of roads, drill pads, or the use of toxic or hazardous materials.(C) The authorized exploration period referred to in subparagraph (B) shall begin 30 days after notice is provided under paragraph (3) with respect to lands subject to such notice and shall end with the expiration of the 90-day period referred to in paragraph (2)(A) or any extension provided under paragraph (2).(2) Notice of intention to locate a mining claimAny person seeking to locate a mining claim on lands subject to this subchapter in order to engage in the mineral activities relating to exploration referred to under paragraph (1)(B) shall file with the Secretary of the Interior a notice of intention to locate a claim on the lands concerned. The notice shall be in such form as the Secretary shall prescribe. The notice shall contain the name and mailing address of the person filing the notice and a legal description of the lands to which the notice applies. The legal description shall be based on the public land survey or on such other description as is sufficient to permit the Secretary to record the notice on the land status records of the Secretary. Whenever any person has filed a notice under this paragraph with respect to any lands, during the 90-day period following the date of such filing, or any extension thereof pursuant to this paragraph, no other person (including the surface owner) may—(A) file such a notice with respect to any portions of such lands;(B) explore for minerals or locate a mining claim on any portion of such lands; or(C) file an application to acquire any interest in any portion of such lands pursuant to section 1719 of this title.If, within such 90-day period, the person who filed a notice under this paragraph files a plan of operations with the Secretary pursuant to subsection (f), such 90-day period shall be extended until the approval or disapproval of the plan by the Secretary pursuant to subsection (f).(3) Notice to surface ownerAny person who has filed a notice of intention to locate a mining claim under paragraph (2) for any lands subject to this subchapter shall provide written notice of such filing, by registered or certified mail with return receipt, to the surface owner (as evidenced by local tax records) of the lands covered by the notice under paragraph (2). The notice shall be provided at least 30 days before entering such lands and shall contain each of the following:(A) A brief description of the proposed mineral activities.(B) A map and legal description of the lands to be subject to mineral exploration.(C) The name, address and phone number of the person managing such activities.(D) A statement of the dates on which such activities will take place.(4) Acreage limitations

The total acreage covered at any time by notices of intention to locate a mining claim under paragraph (2) filed by any person and by affiliates of such person may not exceed 6,400 acres of lands subject to this subchapter in any one State and 1,280 acres of such lands for a single surface owner. For purposes of this paragraph, the term “affiliate” means, with respect to any person, any other person which controls, is controlled by, or is under common control with, such person.

(c) Consent

Notwithstanding subsection (a) and any other provision of law, after the effective date of this subsection no person may engage in the conduct of mineral activities (other than those relating to exploration referred to in subsection (b)(1)B)) 11 So in original. Probably should be subsection “(b)(1)(B))”. on a mining claim located on lands subject to this subchapter without the written consent of the surface owner thereof unless the Secretary has authorized the conduct of such activities under subsection (d).

(d) Authorized mineral activities

The Secretary shall authorize a person to conduct mineral activities (other than those relating to exploration referred to in subsection (b)(1)(B)) on lands subject to this subchapter without the consent of the surface owner thereof if such person complies with the requirements of subsections (e) and (f).

(e) Bond(1) Before the Secretary may authorize any person to conduct mineral activities the Secretary shall require such person to post a bond or other financial guarantee in an amount to insure the completion of reclamation pursuant to this subchapter. Such bond or other financial guarantee shall ensure—(A) payment to the surface owner, after the completion of such mineral activities and reclamation, compensation for any permanent damages to crops and tangible improvements of the surface owner that resulted from mineral activities; and(B) payment to the surface owner of compensation for any permanent loss of income of the surface owner due to loss or impairment of grazing, or other uses of the land by the surface owner to the extent that reclamation required by the plan of operations would not permit such uses to continue at the level existing prior to the commencement of mineral activities.(2) In determining the bond amount to cover permanent loss of income under paragraph (1)(B), the Secretary shall consider, where appropriate, the potential loss of value due to the estimated permanent reduction in utilization of the land.(f) Plan of operations(1) Before the Secretary may authorize any person to conduct mineral activities on lands subject to this subchapter, the Secretary shall require such person to submit a plan of operations. Such plan shall include procedures for—(A) the minimization of damages to crops and tangible improvements of the surface owner;(B) the minimization of disruption to grazing or other uses of the land by the surface owner; and(C) payment of a fee for the use of surface during mineral activities equivalent to the loss of income to the ranch operation as established pursuant to subsection (g).(2) The Secretary shall provide a copy of the proposed plan of operations to the surface owner at least 45 days prior to the date the Secretary makes a determination as to whether such plan complies with the requirements of this subsection. During such 45-day period the surface owner may submit comments and recommend modifications to the proposed plan of operations to the Secretary.(3)(A) The Secretary shall, within 60 days of receipt of the plan, approve the plan of operations if it complies with the requirements of this subchapter, including each of the following:(i) The proposed plan of operations is complete and accurate.(ii) The person submitting the proposed plan of operations has demonstrated that all other applicable Federal and State requirements have been met.(B) The Secretary shall notify the person submitting a plan of operations of any modifications to such plan required to bring it into compliance with the requirements of this subchapter. If the person submitting the plan agrees to modify such plan in a manner acceptable to the Secretary, the Secretary shall approve the plan as modified. In the event no agreement can be reached on the modifications to the plan which, in the opinion of the Secretary, will bring such plan into compliance with the requirements of this subchapter, then the Secretary shall disapprove the plan and notify both the surface owner and the person submitting the plan of the decision.(C) The 60-day period referred to in subparagraph (A) may be extended by the Secretary where additional time is required to comply with other applicable requirements of law.(D) The Secretary shall suspend or revoke a plan of operation whenever the Secretary determines, on the Secretary’s own motion or on a motion made by the surface owner, that the person conducting mineral activities is in substantial noncompliance with the terms and conditions of an approved plan of operations and has failed to remedy a violation after notice from the Secretary within the time required by the Secretary.(4) Final approval of a plan of operations under this subsection shall be conditioned upon compliance with subsections (e) and (g).(g) FeeThe fee referred to in subsection (f)(1) shall be—(1) paid to the surface owner by the person submitting the plan of operations;(2) paid in advance of any mineral activities or at such other time or times as may be agreed to by the surface owner and the person conducting such activities; and(3) established by the Secretary taking into account the acreage involved and the degree of potential disruption to existing surface uses during mineral activities (including the loss of income to the surface owner and such surface owner’s operations due to the loss or impairment of existing surface uses for the duration of the mineral activities), except that such fee shall not exceed the fair market value for the surface of the land.(h) Reclamation

Lands affected by mineral activities under a plan of operations approved pursuant to subsection (f)(3) shall be reclaimed, to the maximum extent practicable, to a condition capable of supporting the uses to which such lands were capable of supporting prior to surface disturbance. Reclamation shall proceed as contemporaneously as practicable with the conduct of mineral activities.

(i) State law(1) Nothing in this subchapter shall be construed as affecting any reclamation, bonding, inspection, enforcement, air or water quality standard or requirement of any State law or regulation which may be applicable to mineral activities on lands subject to this subchapter to the extent that such law or regulation is not inconsistent with this title.22 See References in Text note below.(2) Nothing in this subchapter shall be construed as affecting in any way the right of any person to enforce or protect, under applicable law, the interest of such person in water resources affected by mineral activities.(j) Inspections

Should any surface owner of land subject to this subchapter have reason to believe that they are or may be adversely affected by mineral activities due to any violation of the terms and conditions of a plan of operations approved under subsection (f), such surface owner may request an inspection of such lands. The Secretary shall determine within 10 days of the receipt of the request whether the request states a reason to believe that a violation exists, except in the event the surface owner alleges and provides reason to believe that an imminent danger exists, the 10-day period shall be waived and the inspection conducted immediately. When an inspection is conducted under this paragraph, the Secretary shall notify the surface owner and such surface owner shall be allowed to accompany the inspector on the inspection.

(k) Damages for failure to comply(1) Whenever the surface owner of any land subject to this subchapter has suffered any permanent damages to crops or tangible improvements of the surface owner, or any permanent loss of income due to loss or impairment of grazing, or other uses of the land by the surface owner, if such damages or loss result from—(A) any mineral activity undertaken without the consent of the surface owner under subsection (c) or an authorization by the Secretary under subsection (d); or(B) the failure of the person conducting mineral activities to remedy to the satisfaction of the Secretary any substantial noncompliance with the terms and conditions of a plan under subsection (f);the surface owner may bring an action in the appropriate United States district court for, and the court may award, double damages plus costs for willful misconduct or gross negligence.(2) The surface owner of any land subject to this subchapter may also bring an action in the appropriate United States district court for double damages plus costs for willful misconduct or gross negligence against any person undertaking any mineral activities on lands subject to this subchapter in violation of any requirement of subsection (b).(3) Any double damages plus costs awarded by the court under this subsection shall be reduced by the amount of any compensation which the surface owner has received (or is eligible to receive) pursuant to the bond or financial guarantee required under subsection (e).(l) Payment of financial guarantee

The surface owner of any land subject to this subchapter may petition the Secretary for payment of all or any portion of a bond or other financial guarantee required under subsection (e) as compensation for any permanent damages to crops and tangible improvements of the surface owner, or any permanent loss of income due to loss or impairment of grazing, or other uses of the land by the surface owner. Pursuant to such a petition, the Secretary may use such bond or other guarantee to provide compensation to the surface owner for such damages and to insure the required reclamation.

(m) Bond release

The Secretary shall release the bond or other financial guarantee required under subsection (e) upon the successful completion of all requirements pursuant to a plan of operations approved under subsection (f).

(n) Conveyance to surface owner

The Secretary shall take such actions as may be necessary to simplify the procedures which must be complied with by surface owners of lands subject to this subchapter who apply to the Secretary to obtain title to interests in such lands owned by the United States.

(o) DefinitionsFor the purposes of subsections (b) through (n)—(1) The term “mineral activities” means any activity for, related to or incidental to mineral exploration, mining, and beneficiation activities for any locatable mineral on a mining claim. When used with respect to this term—(A) the term “exploration” means those techniques employed to locate the presence of a locatable mineral deposit and to establish its nature, position, size, shape, grade and value;(B) the term “mining” means the processes employed for the extraction of a locatable mineral from the earth; and(C) the term “beneficiation” means the crushing and grinding of locatable mineral ore and such processes are employed to free the mineral from the other constituents, including but not necessarily limited to, physical and chemical separation techniques.(2) The term “mining claim” means a claim located under the general mining laws of the United States (which generally comprise 30 U.S.C. chapters 2, 12A, and 16, and sections 161 and 162) subject to the terms and conditions of subsections (b) through (p) of this section.(3) The term “tangible improvements” includes agricultural, residential and commercial improvements, including improvements made by residential subdividers.(p) Minerals coveredSubsections (b) through (o) of this section apply only to minerals not subject to disposition under—(1) the Mineral Leasing Act (30 U.S.C. 181 and following);(2) the Geothermal Steam Act of 1970 [30 U.S.C. 1001 et seq.]; or(3) the Act of July 31, 1947, commonly known as the Materials Act of 1947 (30 U.S.C. 601 and following).(Dec. 29, 1916, ch. 9, § 9, 39 Stat. 864; Oct. 28, 1921, ch. 114, § 1, 42 Stat. 208; Mar. 3, 1925, ch. 462, 43 Stat. 1145; 1946 Reorg. Plan No. 3, § 403, eff. July 16, 1946, 11 F.R. 7876, 60 Stat. 1100; Pub. L. 103–23, § 1(a), (b), Apr. 16, 1993, 107 Stat. 60, 65.)Editorial NotesReferences in Text

The effective date of this subsection, referred to in subsecs. (b)(1)(A) and (c), is the date 180 days after Apr. 16, 1993.

This title, referred to in subsec. (i)(1), is unidentifiable because act Dec. 29, 1916, does not contain titles.

The Mineral Leasing Act, referred to in subsec. (p)(1), is act Feb. 25, 1920, ch. 85, 41 Stat. 437, which is classified generally to chapter 3A (§ 181 et seq.) of Title 30, Mineral Lands and Mining. For complete classification of this Act to the Code, see Short Title note set out under section 181 of Title 30 and Tables.

The Geothermal Steam Act of 1970, referred to in subsec. (p)(2), is Pub. L. 91–581, Dec. 24, 1970, 84 Stat. 1566, which is classified principally to chapter 23 (§ 1001 et seq.) of Title 30, Mineral Lands and Mining. For complete classification of this Act to the Code, see Short Title note set out under section 1001 of Title 30 and Tables.

The Materials Act of 1947, referred to in subsec. (p)(3), is act July 31, 1947, ch. 406, 61 Stat. 681, which is classified generally to subchapter I (§ 601 et seq.) of chapter 15 of Title 30, Mineral Lands and Mining. For complete classification of this Act to the Code, see Short Title note set out under section 601 of Title 30 and Tables.

Amendments

1993—Pub. L. 103–23 designated existing provisions as subsec. (a), inserted heading, and added subsecs. (b) to (p).

Statutory Notes and Related SubsidiariesEffective Date of 1993 Amendment

Pub. L. 103–23, § 1(c), Apr. 16, 1993, 107 Stat. 65, provided that: “The amendments made by this Act [amending this section] shall take effect 180 days after the date of enactment [Apr. 16, 1993].”

Regulations

Pub. L. 103–23, § 1(d), Apr. 16, 1993, 107 Stat. 65, provided that: “The Secretary of the Interior shall issue final regulations to implement the amendments made by this Act [amending this section] not later than the effective date of this Act [see Effective Date of 1993 Amendment note above]. Failure to promulgate these regulations by reason of any appeal or judicial review shall not delay the effective date as specified in paragraph (c).”

Abolition of Office of Surveyor General and Transfer of Functions

Act Mar. 3, 1925, ch. 462, 43 Stat. 1144, abolished office of surveyor general and transferred administration of all activities in charge of surveyors general to Field Surveying Service under jurisdiction of United States Supervisor of Surveys.

Report to Congress on Foreign Mineral Interests

Pub. L. 103–23, § 2, Apr. 16, 1993, 107 Stat. 65, directed Secretary of the Interior to submit report to Congress within 2 years after Apr. 16, 1993, on acquisition of mineral interests made after such date by foreign firms on lands subject to this section.

Executive DocumentsTransfer of Functions

For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§ 1, 2, eff. May 24, 1950, 15 F.R. 3174, 64 Stat. 1262, set out under section 1451 of this title.

Words “officer designated by the Secretary of the Interior” substituted for “register” and “Secretary of the Interior or such officer as he may designate” substituted for “Commissioner of the General Land Office” on authority of section 403 of Reorg. Plan No. 3 of 1946. See note set out under section 1 of this title.

The 20 cases that cite 43 U.S.C. § 299 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENWatt v. W. Nuclear, Inc., 462 U.S. 36 (1983).
cites § 299 14×cited by 127 cases
Where it cites § 299
“43 U. S. C. § 299 . The question presented by this case is *38 whether gravel found on lands patented under the Act is a mineral reserved to the United States.”
The case’s holding
Gravel is included within the scope of a mineral reservation contained in a federal patent issued under the Stock-Raising Homestead Act.
Later courts cite it for
“the determination of whether a particular substance is included in the surface estate or the mineral estate should be made in light of the use of the surface estate that congress contemplated.” · 5 citing courts
2
GREENBedRoc Ltd., LLC v. United States, 541 U.S. 176 (2004).
cites § 299 2×cited by 536 cases
Where it cites § 299
“43 U. S. C. § 299 (2000 ed.). Two decades ago, in a closely divided decision, we held that gravel found on lands patented under the Act is a mineral reserved to the United States.”
The case’s holding
Statutory interpretation begins and ends with the text if the language is unambiguous, precluding the use of legislative history to resolve clear provisions.
Later courts cite it for
“the preeminent canon of statutory interpretation requires us to 'presume that the legislature says in a statute what it means and means in a statute what it says there.” · 124 citing courts
3
GREENReno Livestock Corp. v. Sun Oil Co.(Delaware), 638 P.2d 147 (Wyo. 1981).
cites § 299 4×cited by 88 cases
Where it cites § 299
“Appellee refused to enter into any such agreement, claiming it was not required to do so under its lease, issued pursuant to 43 U.S.C. § 299 : "* * * Any person who has acquired from the United States the coal or other mineral deposits in any such land, or the right to mine and…”
The case’s holding
Summary judgment is proper when no genuine issue of material fact exists and the moving party is entitled to judgment as a matter of law.
Later courts cite it for
“the propriety of granting a motion for summary judgment depends upon the correctness of a court's dual findings that there is no genuine issue as to any material fact and that the prevailing party is entitled to judgment as a matter of law.” · 1 citing court
4
GREENEntek GRB, LLC v. Stull Ranches, LLC, 840 F.3d 1239 (10th Cir. 2016).
cites § 299 2×cited by 41 cases
Where it cites § 299
“3d at 1254 (quoting 43 U.S.C. § 299 (a)). So it is that, in the end, we could not rule for Stull in this appeal without revisiting and revising our judgment in the last appeal concerning the effect of the 1916 Act and later laws passed under its terms.”
The case’s holding
The law of the case doctrine precludes the relitigation of issues that were either expressly or implicitly resolved in prior proceedings within the same litigation.
Later courts cite it for
“law of the case doctrine permits a court to decline the invitation to reconsider issues already resolved earlier in the life of a litigation.” · 9 citing courts
5
GREENEnter GRB, LLC v. Stull Ranches, LLC, 763 F.3d 1252 (10th Cir. 2014).
cites § 299 3×cited by 18 cases
Where it cites § 299
“See 43 U.S.C. § 299 (a). This second right, moreover, sweeps broadly when it places the minerals at the government’s “disposal,” signifying not just the government’s power to “bestow[ ]” or “assign[ ]” the minerals, but also a power to “manage[ ],” “make use of,” and “deal with…”
Later courts cite it for
“enter and occupy the surface above any leasehold in the unit to the extent that surface access is reasonably incident to mining in any leasehold in the unit.” · 2 citing courts
6
GREENLawrence E. Gilbertz v. United States, 808 F.2d 1374 (10th Cir. 1987).
cites § 299 6×cited by 11 cases
Where it cites § 299
“The federal government has reserved most of the mineral rights pursuant to the Stock Raising Homestead Act of 1916, 43 U.S.C. § 299 (the Act). In 1973, the government issued federal oil and gas leases to individuals and companies to explore and develop the minerals underlying…”
7
GREENEnergy Dev. Corp. v. Moss, 591 S.E.2d 135 (W. Va. 2004).
cites § 299 2×cited by 33 cases
Where it cites § 299
“It was not until 1916 that Congress passed a public lands Act containing a general reservation of valuable minerals in the lands.”
The case’s holding
An oil and gas lease does not grant a lessee the right to drill into coal seams to produce coalbed methane gas absent specific language or indicia of intent.
Later courts cite it for
“all of the oil and gas and all of the constituents of either in and under the land.” · 2 citing courts
8
GREENAmoco Prod. Co. v. S. Ute Indian Tribe, 526 U.S. 865 (1999).
cites § 299 2×cited by 54 cases
Where it cites § 299
“862 , as amended, 43 U. S. C. § 299 (reserving "all the coal and other minerals in the lands" in all lands patented under the Act).”
The case’s holding
A statutory reservation of coal does not include coalbed methane gas because the gas is a distinct substance separate from the coal itself.
Later courts cite it for
“-widespread fraud in the administration of federal coal lands.” · 2 citing courts
cites § 299 2×cited by 20 cases
Where it cites § 299
“…under the Geothermal Steam Act of 1970, 30 U.S.C. §§ 1001-28 (2000), and the Stock-Raising Homestead Act of 1916, 43 U.S.C. §§ 299 , 301 (2000); and (4) NMSA 1978, § 71-5-2.1 (2003), does not preempt or modify existing federal law that defines the heated water at issue as…”
The case’s holding
Res judicata bars relitigation of resource ownership in state court when a prior federal judgment determined those resources constitute federal mineral interests.
Later courts cite it for
“res judicata applies if three elements are met: (1) a final judgment on the merits in an earlier action, (2) identity of parties or privies in the two suits, and (3) identity of the cause of action in both suits.” · 6 citing courts
10
GREENRosette Inc. v. United States, 277 F.3d 1222 (10th Cir. 2002).
cites § 299 2×cited by 14 cases
Where it cites § 299
“” 43 U.S.C. § 299 . Rosette’s patents contained a reservation of mineral rights by the United States consistent with 43 U.”
Later courts cite it for
“the construction and applicability of a federal statute is a question of law, which we review de novo.” · 5 citing courts
11
GREENElliott v. Oregon Int'l Mining Co., 654 P.2d 663 (Or. Ct. App. 1982).
cites § 299 6×cited by 5 cases
Where it cites § 299
“5 Plaintiffs contend that the ordinances are constitutional and, alternatively, that they are entitled to recover under 43 USC § 299 and 30 USC § 54 . Defendant argues that plaintiffs cannot now seek recovery under the federal statutes because they were not pleaded in their…”
Later courts cite it for
“although plaintiffs' counsel argued at the summary judgment hearing that they were entitled to damages under federal regulations, orcp 47c requires the court to consider only pleadings, depositions, and admissions on file .” · 1 citing court
12
GREENOccidental Geothermal, Inc. v. Simmons, 543 F. Supp. 870 (N.D. Cal. 1982).
cites § 299 4×cited by 9 cases
Where it cites § 299
“” 43 U.S.C. § 299 . It also provides that any person who has acquired from the United States the right to mine and remove the mineral deposits “may reenter and occupy so much of the surface thereof as may be required for all purposes reasonably incident to the mining or removal…”
Later courts cite it for
“because geothermal resources cannot be 'removed' without first being 'utilized' (to the extent of being converted into electrical energy), the two processes can, in the case of geothermal energy, be said to be one.” · 1 citing court
13
GREENRosette Inc. v. United States, 141 F.3d 1394 (10th Cir. 1998).
cites § 299 2×cited by 26 cases
Where it cites § 299
“BACKGROUND Rosette owns the surface estate to certain real property in Hidalgo County, New Mexico by virtue of two United States patents issued under the Stock Raising Homestead Act of 1916, 43 U.S.C. §§ 299 , 301 (remainder of the Act repealed by Act of Oct.”
The case’s holding
Where a suit seeks to resolve ownership of property the United States claims, the Quiet Title Act is the exclusive remedy, and a declaratory judgment action cannot evade its twelve-year limitations period.
Later courts cite it for
“is rosette's only recourse for haling the united states into court on the issue of ownership of the geothermal resources.” · 1 citing court
14
GREENEntek GRB, LLC v. Stull Ranches, LLC, 885 F. Supp. 2d 1082 (D. Colo. 2012).
cites § 299 6×cited by 2 cases
Where it cites § 299
“43 U.S.C. § 299 . The MLA was enacted to give the Secretary of the Interior broad power to issue oil and gas leases on public lands even if they were not located in known producing oil and gas fields.”
15
GREENJoe Aulston v. United States, 915 F.2d 584 (10th Cir. 1990).
cites § 299 1×cited by 69 cases
Where it cites § 299
“864 (codified at 43 U.S.C. § 299 (1982)) (reserving “coal and other minerals”); see generally Bate, Mineral Exceptions and Reservations in Federal Public Land Patents, 17 Rocky Mtn.”
The case’s holding
A reservation for gas includes carbon dioxide when the statutory intent supports such inclusion regardless of the perceived value of the substance at the time of the reservation.
Later courts cite it for
“in interpreting statutes, we begin with the relevant language.” · 4 citing courts
16
GREENBelle Fourche Pipeline Co. v. State, 766 P.2d 537 (Wyo. 1988).
cites § 299 1×cited by 40 cases
Where it cites § 299
“29, 1916, 43 U.S.C. § 299 (1958); Haughey & Gallinger, Legislative Protection of the Surface Owner in the Surface Mining of Coal Reserved by the United States, supra.”
The case’s holding
The statutory protections for surface landowners and owners apply only to the holder of fee title to the surface estate, not to lesser interests such as easements or leaseholds.
Later courts cite it for
“the mining permit application shall include a mining plan and reclamation plan dealing with the extent to which the mining operation will disturb or change the lands to be affected.” · 1 citing court
17
GREENEnter GRB, LLC v. Stull Ranches, LLC, 113 F. Supp. 3d 1113 (D. Colo. 2015).
cites § 299 3×cited by 3 cases
Where it cites § 299
“Stull’s Motion for Summary Judgment Stull argues that Entek’s claims must be dismissed or, in the alternative, that this case should be stayed because Entek has not acquired a bond from the BLM pursuant to 43 U.S.C. § 299 (a). Docket No. 193 at 1.”
Later courts cite it for
“with respect to whether complete relief can be awarded between entek and stull, the fact remains that neither party sought relief against the blm.” · 1 citing court
18
GREENUnited States v. Union Oil Co. of California, 549 F.2d 1271 (9th Cir. 1977).
cites § 299 1×cited by 34 cases
Where it cites § 299
“” Section 9 of the Act, 43 U.S.C. § 299 . The patents involved in this case contain a reservation utilizing the words of the statute.”
The case’s holding
The mineral reservation in the Stock-Raising Homestead Act includes geothermal resources as part of the statutory intent to retain subsurface energy resources for the public interest.
Later courts cite it for
“congress was not aware of geothermal power when it enacted the stock-raising homestead act in 1916; it had no specific intention either to reserve geothermal resources or to pass title to them.” · 4 citing courts
19
GREENHayes v. A.J. Assocs., Inc., 960 P.2d 556 (Alaska 1998).
cites § 299 2×cited by 9 cases
Where it cites § 299
“Thus, comparing the Stock-Raising Homestead Act, 43 U.S.C. § 299 (1988), with the Agricultural Entry Act of 1914, 30 U.”
20
GREENDenbury Onshore, LLC v. Christensen, 101 F. Supp. 3d 1147 (D. Wyo. 2015).
cites § 299 5×cited by 1 case
Where it cites § 299
“18-1; 43 U.S.C. § 299 (a) (“Any person who has acquired from the United States the coal or other mineral deposits in any such land, or the right to mine and remove the same, may reenter and occupy so much of the surface thereof as may be required for all pur *1160 poses…”

Show all 36 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
193019742018

One bar per 2 years. Tallest: 4 cases in 1998–1999. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
10th Cir.11D. Colo.5SCOTUS39th Cir.2N.D. Cal.2Wyo.2Alaska1D. Ariz.1

The 8 courts with the most citing cases, of 17 courts in all.

By subsection
(a)1 case
Bedroc Ltd. v. United States, 314 F.3d 1080 (9th Cir. 2002).

Show all 36 citing cases (list view) →

Enactment and amendments
(Dec. 29, 1916, ch. 9, § 9, 39 Stat. 864; Oct. 28, 1921, ch. 114, § 1, 42 Stat. 208; Mar. 3, 1925, ch. 462, 43 Stat. 1145; 1946 Reorg. Plan No. 3, § 403, eff. July 16, 1946, 11 F.R. 7876, 60 Stat. 1100; Pub. L. 103–23, § 1(a), (b), Apr. 16, 1993, 107 Stat. 60, 65.)
Amendment years (notes): 1993
Versions

Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.

U.S.C. Home  |  Search U.S. Code  |  Search cases for this section  |  syfert.com