43 U.S.C. § 390b (2026)
Development of water supplies for domestic, municipal, industrial, and other purposes
Edition and currency
Other sources
Courts have cited this section in 43 opinions since 1960, 3 of them in the last five years. The most litigated part is subsection (a) (11 cases).
It is declared to be the policy of the Congress to recognize the primary responsibilities of the States and local interests in developing water supplies for domestic, municipal, industrial, and other purposes and that the Federal Government should participate and cooperate with States and local interests in developing such water supplies in connection with the construction, maintenance, and operation of Federal navigation, flood control, irrigation, or multiple purpose projects.
In carrying out the policy set forth in this section, it is provided that storage may be included in any reservoir project surveyed, planned, constructed or to be planned, surveyed and/or constructed by the Corps of Engineers or the Bureau of Reclamation to impound water for present or anticipated future demand or need for municipal or industrial water, and the reasonable value thereof may be taken into account in estimating the economic value of the entire project: Provided, That the cost of any construction or modification authorized under the provisions of this section shall be determined on the basis that all authorized purposes served by the project shall share equitably in the benefits of multiple purpose construction, as determined by the Secretary of the Army or the Secretary of the Interior, as the case may be: Provided further, That before construction or modification of any project including water supply provisions for present demand is initiated, State or local interests shall agree to pay for the cost of such provisions in accordance with the provisions of this section: And provided further, That (1) for Corps of Engineers projects, not to exceed 30 percent of the total estimated cost of any project may be allocated to anticipated future demands, and, (2) for Bureau of Reclamation projects, not to exceed 30 per centum of the total estimated cost of any project may be allocated to anticipated future demands where State or local interests give reasonable assurances, and there is reasonable evidence, that such demands for the use of such storage will be made within a period of time which will permit paying out the costs allocated to water supply within the life of the project: And provided further, That for Corps of Engineers projects, the Secretary of the Army may permit the full non-Federal contribution to be made, without interest, during construction of the project, or, with interest, over a period of not more than thirty years from the date of completion, with repayment contracts providing for recalculation of the interest rate at, five-year intervals, and for Bureau of Reclamation projects, the entire amount of the construction costs, including interest during construction, allocated to water supply shall be repaid within the life of the project but in no event to exceed fifty years after the project is first used for the storage of water for water supply purposes, except that (1) no payment need be made with respect to storage for future water supply until such supply is first used, and (2) no interest shall be charged on such cost until such supply is first used, but in no case shall the interest-free period exceed ten years. For Corps of Engineers projects, all annual operation and maintenance costs for municipal and industrial water supply storage under this section shall be reimbursed from State or local interests on an annual basis, and all repair, rehabilitation, and replacement costs for municipal and industrial water supply storage under this section shall be reimbursed from State or local interests (1) without interest, during construction of the repair, rehabilitation, or replacement, (2) with interest, in lump sum on the completion of the repair, rehabilitation, or replacement, or (3) at the request of the State or local interest, with interest, over a period of not more than 25 years beginning on the date of completion of the repair, rehabilitation, or replacement, with repayment contracts providing for recalculation of the interest rate at 5-year intervals. At the request of the State or local interest, the Secretary of the Army shall amend a repayment contract entered into under this section on or before
For the period beginning 180 days after
For water resource development projects managed by the Secretary, a State or local interest that the Secretary determines has complied with paragraph (1) may request from the Secretary a release to the United States of any right of the State or local interest to future water storage under this Act that was allocated for future use water supply prior to
Not later than 180 days after receiving a request under paragraph (2), the Secretary shall provide to the applicable State or local interest a written decision on whether the Secretary recommends releasing future water storage rights.
If the Secretary recommends releasing future water storage rights, the Secretary shall include that recommendation in the annual plan submitted under section 2282d of title 33.
Nothing in this subsection authorizes the Secretary to release a State or local interest from a contractual obligation unless specifically authorized by Congress.
The provisions of this section shall not be construed to modify the provisions of section 701–1 of title 33 and section 390 of this title, as amended and extended, or the provisions of sections 372 and 383 of this title.
Modifications of a reservoir project heretofore authorized, surveyed, planned, or constructed to include storage as provided in subsection (b) which would seriously affect the purposes for which the project was authorized, surveyed, planned, or constructed, or which would involve major structural or operational changes shall be made only upon the approval of Congress as now provided by law.
The Reclamation Projects Act of 1939, referred to in subsec. (b), is act Aug. 4, 1939, ch. 418, 53 Stat. 1187, which is classified principally to subchapter X (§ 485 et seq.) of this chapter. For complete classification of this Act to the Code, see section 485k of this title and Tables.
This Act, referred to in subsec. (c)(1)(A), (2), probably means the Water Supply Act of 1958. See below.
2022—Subsec. (b). Pub. L. 117–263 substituted in fourth proviso “For Corps of Engineers projects, all annual operation and maintenance costs for municipal and industrial water supply storage under this section shall be reimbursed from State or local interests on an annual basis, and all repair, rehabilitation, and replacement costs for municipal and industrial water supply storage under this section shall be reimbursed from State or local interests (1) without interest, during construction of the repair, rehabilitation, or replacement, (2) with interest, in lump sum on the completion of the repair, rehabilitation, or replacement, or (3) at the request of the State or local interest, with interest, over a period of not more than 25 years beginning on the date of completion of the repair, rehabilitation, or replacement, with repayment contracts providing for recalculation of the interest rate at 5-year intervals. At the request of the State or local interest, the Secretary of the Army shall amend a repayment contract entered into under this section on or before
2016—Subsec. (f). Pub. L. 114–322 struck out subsec. (f) which related to the Apalachicola-Chattahoochee-Flint River System and Alabama-Coosa-Tallapoosa River System projects.
2014—Subsecs. (c) to (e). Pub. L. 113–121, § 1046(d), added subsec. (c) and redesignated former subsecs. (c) and (d) as (d) and (e), respectively.
Subsec. (f). Pub. L. 113–121, § 1051(a), added subsec. (f).
1986—Subsec. (b). Pub. L. 99–662 inserted in third proviso “(1) for Corps of Engineers projects, not to exceed 30 percent of the total estimated cost of any project may be allocated to anticipated future demands, and, (2) for Bureau of Reclamation projects,”, inserted in fourth proviso “for Corps of Engineers projects, the Secretary of the Army may permit the full non-Federal contribution to be made, without interest, during construction of the project, or, with interest, over a period of not more than thirty years from the date of completion, with repayment contracts providing for recalculation of the interest rate at, five-year intervals, and for Bureau of Reclamation projects,”, inserted after first sentence “For Corps of Engineers projects, all annual operation, maintenance, and replacement costs for municipal and industrial water supply storage under the provisions of this section shall be reimbursed from State or local interests on an annual basis. For Corps of Engineers projects, any repayment by a State or local interest shall be made with interest at a rate to be determined by the Secretary of the Treasury, taking into consideration the average market yields on outstanding marketable obligations of the United States with remaining periods to maturity comparable to the reimbursement period, during the month preceding the fiscal year in which costs for the construction of the project are first incurred (or, when a recalculation is made), plus a premium of one-eighth of one percentage point for transaction costs.”, and substituted “For Bureau of Reclamation projects, the interest rate used” for “The interest rate used”.
1961—Subsec. (b). Pub. L. 87–88 substituted provisions permitting not more than 30 per centum of the total estimated cost of any project to be allocated to anticipated future demands where State or local interests give reasonable assurances, and there is reasonable evidence, that such demands for the use of such storage will be made within a period of time which will permit paying out the costs allocated to water supply within the life of the project for provisions which permitted not more than 30 per centum of the total estimated cost of any project to be allocated to anticipated future demands where States or local interests give reasonable assurance that they will contract for the use of storage for anticipated future demands within a period of time which will permit paying out the costs allocated to water supply within the life of the project.
Pub. L. 87–88, § 11,
Pub. L. 85–500, title III, § 302,
Pub. L. 114–322, title III, § 4007(a)–(j),
[For definition of “Reclamation State” as used in section 4007(a)(1), (2), (d) of Pub. L. 114–322, set out above, see section 4014(8) of Pub. L. 114–322, set out below.]
Pub. L. 114–322, title III, § 4012,
[For definitions of terms used in section 4012 of Pub. L. 114–322, set out above, see section 4014 of Pub. L. 114–322, set out below.]
Pub. L. 114–322, title III, § 4013,
Pub. L. 99–662, title IX, § 932(b),
Pub. L. 114–322, title III, § 4014,
- Where it cites § 390b
- “§ 390b, addresses the development of "water supplies for domestic, municipal, industrial, and other purposes," specifically acknowledging that primary responsibility for their development is lodged in States and localities. Id. § 301(a), § 390b(a).”
- Later courts cite it for
- “the court, in responding to the corps' defense of its approval of the agreement, has no occasion to opine whether the corps' previous storage reallocations were unlawful.” · 3 citing courts
- Where it cites § 390b
- “3 As demand for water increased and the local governmental entities desired an assured permanent supply, the Corps in 1989 announced plans to seek congressional approval in accordance with the Water Supply Act of 1958 (“WSA”), 43 U.S.C. § 390b (2003), to enter into permanent…”
- The case’s holding
- An injunction is a clearly defined and understandable directive to act or refrain from action that is enforceable through contempt (defining an injunction).
- Later courts cite it for
- “injunctive relief must relate in some fashion to the relief requested in the complaint.” · 21 citing courts
- Where it cites § 390b
- “319 , 43 U. S. C. § 390b; Boulder Canyon Projects Act, §§ 4, 8, 45 Stat.”
- The case’s holding
- Section 1983 encompasses claims based on violations of federal statutory law as well as constitutional law.
- Later courts cite it for
- “violations of federal statutory as well as constitutional law.” · 34 citing courts
- Where it cites § 390b
- “Under the Water Supply Act of 1958, 43 U.S.C. § 390b, the *1468 local interests who benefit from the water supply component of federal projects, such as Warm Springs, are to shoulder the portion of construction costs allocated to that purpose.”
- The case’s holding
- Liability under the False Claims Act requires the knowing presentation of a lie, as mere mathematical errors or disputed legal interpretations do not constitute fraud.
- Later courts cite it for
- “all authorized purposes served by the project shall share equitably in the benefits of multiple purpose construction, as determined by the secretary of the army or the secretary of the interior” · 4 citing courts
- Where it cites § 390b
- “As demand for water increased and the local governmental entities desired an assured permanent supply, the Corps in 1989 announced plans to seek congressional approval in accordance with the Water Supply Act of 1958 (“WSA”), 43 U.”
- Later courts cite it for
- “the parties may continue to operate at current water-supply withdrawal levels but should not increase those withdrawals absent the agreement of all other parties to this matter.” · 3 citing courts
- Where it cites § 390b
- “Additionally, the act contains a provision stating, "the policy of the Congress [is] to recognize the primary responsibilities of the States and local interests in developing water supplies for domestic, municipal, industrial, and other purposes and that the Federal Government…”
- The case’s holding
- State law cannot invalidate the terms of a federal reclamation contract, but wastewater reclamation claims are not preempted and must first be addressed to the state water board.
- Later courts cite it for
- “the scope and technical complexity of issues concerning water resource management are unequalled by virtually any other type of activity presented to the courts.” · 2 citing courts
- Where it cites § 390b
- “In addition, Senate Document 80 constituted congressional approval of a plan to change a water right owned by the United States, as required by 43 U.S.C. § 390b(d). 20 In view of these distinctions, City and County of Denver does not control the result in this case.”
- Where it cites § 390b
- “The specific WSA provision on which the plaintiff relies states that “before construction or modification of any project including water supply provisions for present demand is initiated, State and local interests shall agree to pay for the cost of such provisions in accordance…”
- Where it cites § 390b
- “The Corps’ authority to manage water storage in Lake Lanier is controlled by the WSA, 43 U.S.C. § 390b. The WSA, passed in 1958, and amended most recently in 1986, grants the Army, i.”
- Where it cites § 390b
- “§ 1344 (West 1986), to construct a water intake structure and pipeline in Lake Gaston to extend to Suffolk, Virginia; and (2) to enter into a water storage reallocation contract for Kerr Reservoir on behalf of the United States with the City of Virginia Beach pursuant to the…”
- Later courts cite it for
- “careful analysis of the environmental and nonenviron-mental facts,” · 2 citing courts
- Where it cites § 390b
- “Memorandum from Earl Stockdale, Chief Counsel, Department of the Army, to the Chief of Engineers: Authority to Reallocate Storage for Municipal & Industrial Water Supply Under the Water Supply Act of 1958, 43 U.S.C. § 390b 1 (Jan. 9, 2009) [hereinafter "2009 Stockdale Memo"].”
- Where it cites § 390b
- “- The Water Supply Act of 1958 is codified at 43 U.S.C. § 390b. 5 . Id. The pertinent provisions of the Water Supply Act of 1958 state: "In carrying out the policy set forth in this section, it is hereby provided that storage may be included in any reservoir project surveyed,…”
- The case’s holding
- Public officers are immune from civil liability under qui tam statutes when they act in conformity with the state Attorney General's opinion that their actions are lawful.
- Where it cites § 390b
- “Hagood came to the conclusion that the proposed cost allocations for the new contract, which would govern the Water Agency’s repayment obligations, did not comply with the terms of the 1958 Water Supply Act, 43 U.S.C. § 390b. The cost allocations proposed by the Corps…”
- The case’s holding
- The government need not show actual damages to recover civil penalties under the False Claims Act.
- Later courts cite it for
- “the requisite intent is the knowing presentation of what is known to be false.” · 13 citing courts
- Where it cites § 390b
- “7 The second two conditions require an examination of Sonoma’s contract and the Water Supply Act of 1958, 43 U.S.C. § 390b (1976) (Water Supply Act).”
- Later courts cite it for
- “ukiah also argues that the 1982 contract is illegal under the water supply act because the contract separates sonoma's repayment obligation from its use of water even for water supply purposes.” · 1 citing court
- Where it cites § 390b
- “§ 540 ; 43 U.S.C. § 390b (the Water Supply Act of 1958); 33 U.”
- The case’s holding
- The National Environmental Policy Act applies to future actions on projects authorized before its enactment, and plaintiffs have standing to challenge agency compliance.
- Where it cites § 390b
- “§§ 4321–4347, and the Water Supply Act of 1958 (“Water Supply Act”), 43 U.S.C. § 390b. The district court 2 granted summary judgment in favor of the Defendants.”
- Where it cites § 390b
- “Three variables affect that minimum amount of water: the time of year, the amount of water in the Corps' storage reservoirs, and the amount of additional water entering the Basin.”
- Later courts cite it for
- “by mutual accommodation and agreement” · 2 citing courts
- Where it cites § 390b
- “Section 301 of the 1958 Act (43 U.S.C. § 390b) authorizes the Secretary to impound and store water in reclamation project facilities “for present or anticipated future demand or need for municipal or industrial water.”
- Later courts cite it for
- “(t)here is no way that a present evaluation could be made of the environmental impact of all the potential means of putting industrial water to beneficial use.” · 2 citing courts
- Where it cites § 390b
- “§ 662 (b) ; § 301 (b) of the Water Supply Act of 1958 ns amended by § 10 of the Water Pollution Control Act Amendments of 1961, 43 U.S.C. § 390b (b) ; and the Clean Water Restoration Act of 1966, 33 U.”
- The case’s holding
- Compliance with the National Environmental Policy Act requires agencies to maintain good faith objectivity rather than subjective impartiality during the environmental evaluation process.
- Later courts cite it for
- “is one of good faith objectivity rather than subjective impartiality.” · 5 citing courts
- Where it cites § 390b
- “319 , now 43 U.S.C.A. § 390b et seq. and the Colorado River Storage Project Act of 1956, 70 Stat.”
- The case’s holding
- An agricultural improvement district may exercise eminent domain to condemn land for a transmission line to deliver purchased power, provided the power revenues support its primary irrigation and reclamation functions.
Show all 43 citing cases (list view) →
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
One bar per year. Tallest: 5 cases in 2011. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.
The 8 courts with the most citing cases, of 28 courts in all.
(a)11 cases
(b)11 cases
(b)(1)1 case
(d)10 cases
(e)2 cases
Amendment years (notes): 2022, 2016, 2014, 1986, 1961
Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.