Utah Code homeSearch Utah
Utah CodeTitle 73, Chapter 5 — Administration and Distribution

Utah Code § 73-5-13 (2026)

Claim to surface or underground water not otherwise represented -- Information required -- Corrections -- Filing -- Investigation -- Publication -- Judicial action to determine validity -- Rules -- Homestead parcels

Edition and currency
laws through the 2026 General Session (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2026 General Session (checked Sept. 2026) cited 1991–2018 6citing cases
At a glance

Courts have cited this section in 6 opinions since 1991.

A claimant to the right to the use of water, including both surface and underground water, whose right is not represented by a certificate of appropriation issued by the state engineer, by an application filed with the state engineer, by a court decree, or by a notice of claim filed according to law, shall submit the claim to the state engineer in accordance with this section.
Subsections (2) through (7) only apply to a claim or corrected claim submitted to the state engineer in accordance with this section on or after May 14, 2013.
Subsection (8) applies to a claim or corrected claim submitted to the state engineer in accordance with this section on or after May 6, 2026.
The claimant or the claimant's appointed representative shall verify under oath a claim submitted under this section and submit the claim on a form provided by the state engineer setting forth the information the state engineer requires, including:
the name and mailing address of the person making the claim;
the quantity of water claimed in acre-feet or rate of flow in second-feet, or both, when appropriate;
the source of supply;
the claimed priority date of the right;
the location of the point of diversion with reference to a United States land survey corner;
the place of use;
the nature and extent of use;
the time during which the water has been used each year; and
the date when the water was first used.
A claim described in Subsection (1) shall also include the following information, prepared by a Utah licensed engineer or a Utah licensed land surveyor:
measurements of the amount of water diverted;
a statement that the quantity of water claimed either in acre-feet or cubic feet per second is consistent with the beneficial use claimed and the supply that the source is capable of producing; and
a map showing the original diversion and conveyance works and where the water was placed to beneficial use, including irrigated lands, if irrigation is a claimed beneficial use.
The state engineer may require additional information as necessary to evaluate a claim described in Subsection (1) including:
an affidavit setting forth facts of which the affiant has personal knowledge;
an authenticated or historic photograph, plat or survey map, or surveyor's note;
an authenticated copy of an original diary, personal history, or other historical document that documents the claimed use of water;
evidence of a homestead parcel as defined in Subsection (8); or
another relevant record on file with a county recorder's, surveyor's, or assessor's office.
A claimant, or a claimant's successor in interest, as shown in the records of the state engineer, may file a corrected claim that:
is designated as a corrected claim;
includes the information described in Subsection (2); and
bears the same number as the original claim.
If a corrected claim that meets the requirements described in Subsection (3)(a) is filed before the state engineer publishes the original claim in accordance with Subsection (4)(a)(iv), the state engineer may not charge an additional fee for filing the corrected claim.
The state engineer shall treat a corrected claim that is filed in accordance with Subsection (3)(a) as if the corrected claim were the original claim.
When a claimant submits a claim that is acceptably complete under Subsection (2) and deposits money with the state engineer sufficient to pay the expenses of conducting a field investigation and publishing a notice of the claim, the state engineer shall:
file the claim;
endorse the date of the claim's receipt;
assign the claim a water right number;
publish a notice of the claim following the same procedures as provided in Section 73-3-6; and
if the claimant is the federal government or a federal agency, provide a copy of the claim to the members of the Natural Resources, Agriculture, and Environment Interim Committee.
The state engineer shall return a claim to the claimant that the state engineer determines is not acceptably complete.
The state engineer's acceptance of a claim filed under this section is not considered an adjudication by the state engineer of the validity of the claimed water right.
The state engineer shall:
conduct a field investigation of a claim filed under this section; and
prepare a report of the investigation.
In preparing the report of the investigation described in Subsection (5)(a), the state engineer shall:
apply Section 73-1-3; and
include an evaluation of the asserted beneficial uses as the asserted beneficial uses existed at the time of the claimed priority date, specifically identifying any portion of the claim that was not placed to beneficial use in accordance with law.
The report of the investigation shall:
become part of the file on the claim; and
be admissible in an administrative or judicial proceeding regarding the validity of the claim.
A person who may be damaged by a diversion and use of water as described in a claim submitted according to this section may file an action in a court with jurisdiction to determine the validity of the claim, regardless of whether the state engineer has filed the claim in accordance with Subsection (4)(a).
Venue for an action brought under Subsection (6)(a) is in the county where the point of diversion listed in the claim is located, or in a county where the place of use, or some part of the place of use, is located.
A person bringing an action under this Subsection (6) shall bring the action against the claimant to the use of water or the claimant's successor in interest.
In an action brought to determine the validity of a claim to the use of water under this section, the claimant has the initial burden of proof as to the validity of the claimed right.
A person filing an action challenging the validity of a claim to the use of water under this section shall notify the state engineer of the pendency of the action in accordance with state engineer rules.
Upon receipt of the notice, the state engineer may take no action on a change or exchange application founded on the claim that is the subject of the pending litigation until the court adjudicates the matter.
Upon the entering of a final order or decree in a judicial action to determine the validity of a claim under this section, the prevailing party shall file a certified copy of the order or decree with the state engineer, who shall incorporate the order into the state engineer's file on the claim.
In a general adjudication of water rights under Title 73, Chapter 4, Determination of Water Rights, after completion of final summons in accordance with Section 73-4-22, a claimant is prohibited from filing a claim under this section in the general adjudication area, division, or subdivision.
The state engineer shall return a claim filed under this section to a claimant without further action if:
the state engineer receives a claim for an area where the claimant is prohibited from filing the claim under Subsection (7)(a) or Section 73-4-9.5; or
the claim is untimely as provided in Section 73-4-9.
As used in this Subsection (8):
"Homestead parcel" means the land area of 640 acres or less conveyed by patent from the federal government.
"Livestock" means a domestic animal raised or kept for profit or personal use.
"Livestock watering pond" means a pond that:
is formed by precipitation and not the diversion of a water source;
has an annual use that meets the condition of Subsection (8)(b)(i); and
is used to directly water livestock or for associated uses related to the raising and care of livestock.
"Water right" means the same as that term is defined in Section 73-3c-102.
There is a rebuttable presumption that a claimant has the right to the use of a livestock watering pond even though the right is not represented by a certificate of appropriation issued by the state engineer, by an application filed with the state engineer, by a court decree, or by a notice of claim filed according to law if:
the aggregate of annual use of all livestock watering ponds that support the homestead parcel is less than 20 acre-feet of water;
the claimant files an acceptably complete claim in accordance with this section;
the claimant deposits money with the state engineer sufficient to pay the expenses of conducting a field investigation and publishing a notice of the claim;
the livestock watering pond is in support of a homestead parcel; and
the livestock watering pond:
existed before the conveyance of the patent for the homestead parcel; and
was used as surface water before 1903.
The priority date of a claim described in Subsection (8)(b) is the date on which the homestead parcel is first used in support of livestock notwithstanding that the date is before the patent conveying title to the homestead parcel.
The rebuttable presumption described in Subsection (8)(b) may be rebutted by a person protesting a claim based on the impairment of a water right held by the person protesting the claim. A person may rebut the rebuttable presumption described in Subsection (8)(b) by a preponderance of the evidence.
If a claimant and a protestant come to a written agreement regarding how the issue of impairment may be mitigated:
the state engineer may incorporate the agreement as part of the file on the claim; and
the agreement is admissible in an administrative or judicial proceeding regarding the validity of the claim.

Amended by Chapter 412, 2026 General Session

The 6 cases that cite Utah Code § 73-5-13 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 73-5-13 14×cited by 2 cases
Where it cites § 73-5-13
“Utah Code Ann. § 73-5-13 (5)(a) (LexisNexis Supp.”
Later courts cite it for
“a claimant who . . . fails to timely object . . . takes on the role of a defaulting party and is bound by its failure . . . unless and until the claimant seeks leave from the court overseeing the general adjudication to file an untimely objection . . . .” · 2 citing courts
2
GREENEast Jordan Irrigation Co. v. Morgan, 860 P.2d 310 (Utah 1993).
cites § 73-5-13 4×cited by 15 cases
Where it cites § 73-5-13
“Utah Code Ann. § 73-5-13 recognizes diligence rights to the use of water not represented by a certificate of appropriation issued by the state engineer.”
Later courts cite it for
“appropriateness of board policy regarding change applications and the regulation of the shareholder's rights.” · 2 citing courts
3
GREENEskelsen v. Town of Perry, 819 P.2d 770 (Utah 1991).
cites § 73-5-13 4×cited by 14 cases
Where it cites § 73-5-13
“100, § 72 (presently incorporated in substance in Utah Code Ann. § 73-5-13 ). 2 . A 1917 deed to the Town from the Stokeses conveyed all water rights "save and except a ¼ interest in one spring which belongs to John Call and a small spring arising upon James S.”
Later courts cite it for
“allowed to run to waste or go without being applied to a beneficial use for any great number of years.” · 2 citing courts
4
GREENSalt Lake City v. Silver Fork Pipeline Corp., 2000 UT 3, 5 P.3d 1206.
cites § 73-5-13 2×cited by 12 cases
Where it cites § 73-5-13
“SALT LAKES TITLE TO WATER INTERCEPTED IN THE KENTUCKY-UTAH MINE 21 SFPC argues that Salt Lake failed to prove, by way of decreed right, certificate of appropriation, or diligence or use claim, its alleged right to divert water at the mine.”
Later courts cite it for
“a quiet title action requires the application of a rule of law to decide ownership of the property in question.” · 3 citing courts
5
GREENProvo River Water Users' Ass'n v. Morgan, 857 P.2d 927 (Utah 1993).
cites § 73-5-13 2×cited by 1 case
Where it cites § 73-5-13
“See Utah Code Ann. § 73-5-13 . . We therefore do not reach plaintiffs’ contention that the trial court erred in finding that the evidence was insufficient to establish a hydrological, subsurface link between the Kamas Hills springs and the Weber River.”
Later courts cite it for
“the basic goal of general adjudication is to record all water claims from a particular source which subsequent appropriators can rely upon before making their investments.” · 4 citing courts
6
GREENProvo River Water Users'ass'n v. Morgan, 857 P.2d 927 (Utah 1993).
cites § 73-5-13 2×cited by 0 cases
Where it cites § 73-5-13
“See Utah Code Ann. § 73-5-13 . [5] We therefore do not reach plaintiffs' contention that the trial court erred in finding that the evidence was insufficient to establish a hydrological, subsurface link between the Kamas Hills springs and the Weber River.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
199120042018

One bar per year. Tallest: 3 cases in 1993. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Utah5Utah Ct. App.1
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: laws through the 2026 General Session (checked Sept. 2026). Syfert holds no earlier or later version of this section.

Utah Code Home  |  Search Utah  |  Search cases for this section  |  syfert.com