C.F.R. homeSearch C.F.R.
C.F.R.Title 33Chapter II—Corps of Engineers, Department of the Army, Department of DefensePart 330—Nationwide Permit Program

33 C.F.R. § 330.4 (2026)

Conditions, limitations, and restrictions

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 1982–2026 31citing cases
At a glance

Courts have cited this section in 31 opinions since 1982, 5 of them in the last five years. The most litigated part is subsection (a)(1) (1 case).

(a) General. A prospective permittee must satisfy all terms and conditions of an NWP for a valid authorization to occur. Some conditions identify a “threshold” that, if met, requires additional procedures or provisions contained in other paragraphs in this section. It is important to remember that the NWPs only authorize activities from the perspective of the Corps regulatory authorities and that other Federal, state, and local permits, approvals, or authorizations may also be required.

(b) Further information. (1) DEs have authority to determine if an activity complies with the terms and conditions of an NWP.

(2) NWPs do not obviate the need to obtain other Federal, state, or local permits, approvals, or authorizations required by law.

(3) NWPs do not grant any property rights or exclusive privileges.

(4) NWPs do not authorize any injury to the property or rights of others.

(5) NWPs do not authorize interference with any existing or proposed Federal project.

(c) State 401 water quality certification. (1) State 401 water quality certification pursuant to section 401 of the Clean Water Act, or waiver thereof, is required prior to the issuance or reissuance of NWPs authorizing activities which may result in a discharge into waters of the United States.

(2) If, prior to the issuance or reissuance of such NWPs, a state issues a 401 water quality certification which includes special conditions, the division engineer will make these special conditions regional conditions of the NWP for activities which may result in a discharge into waters of United States in that state, unless he determines that such conditions do not comply with the provisions of 33 CFR 325.4. In the latter case, the conditioned 401 water quality certification will be considered a denial of the certification (see paragraph (c)(3) of this section).

(3) If a state denies a required 401 water quality certification for an activity otherwise meeting the terms and conditions of a particular NWP, that NWP's authorization for all such activities within that state is denied without prejudice until the state issues an individual 401 water quality certification or waives its right to do so. State denial of 401 water quality certification for any specific NWP affects only those activities which may result in a discharge. That NWP continues to authorize activities which could not reasonably be expected to result in discharges into waters of the United States. 1

1 NWPs numbered 1, 2, 8, 9, 10, 11, 19, 24, 28, and 35, do not require 401 water quality certification since they would authorize activities which, in the opinion of the Corps, could not reasonably be expected to result in a discharge and in the case of NWP 8 is seaward of the territorial seas. NWPs numbered 3, 4, 5, 6, 7, 13, 14, 18, 20, 21, 22, 23, 27, 32, 36, 37, and 38, involve various activities, some of which may result in a discharge and require 401 water quality certification, and others of which do not. State denial of 401 water quality certification for any specific NWP in this category affects only those activities which may result in a discharge. For those activities not involving discharges, the NWP remains in effect. NWPs numbered 12, 15, 16, 17, 25, 26, and 40 involve activities which would result in discharges and therefore 401 water quality certification is required.

(4) DEs will take appropriate measures to inform the public of which activities, waterbodies, or regions require an individual 401 water quality certification before authorization by NWP.

(5) The DE will not require or process an individual permit application for an activity which may result in a discharge and otherwise qualifies for an NWP solely on the basis that the 401 water quality certification has been denied for that NWP. However, the district or division engineer may consider water quality, among other appropriate factors, in determining whether to exercise his discretionary authority and require a regional general permit or an individual permit.

(6) In instances where a state has denied the 401 water quality certification for discharges under a particular NWP, permittees must furnish the DE with an individual 401 water quality certification or a copy of the application to the state for such certification. For NWPs for which a state has denied the 401 water quality certification, the DE will determine a reasonable period of time after receipt of the request for an activity-specific 401 water quality certification (generally 60 days), upon the expiration of which the DE will presume state waiver of the certification for the individual activity covered by the NWPs. However, the DE and the state may negotiate for additional time for the 401 water quality certification, but in no event shall the period exceed one (1) year (see 33 CFR 325.2(b)(1)(ii)). Upon receipt of an individual 401 water quality certification, or if the prospective permittee demonstrates to the DE state waiver of such certification, the proposed work can be authorized under the NWP. For NWPs requiring a 45-day pre-construction notification the district engineer will immediately begin, and complete, his review prior to the state action on the individual section 401 water quality certification. If a state issues a conditioned individual 401 water quality certification for an individual activity, the DE will include those conditions as activity-specific conditions of the NWP.

(7) Where a state, after issuing a 401 water quality certification for an NWP, subsequently attempts to withdraw it for substantive reasons after the effective date of the NWP, the division engineer will review those reasons and consider whether there is substantial basis for suspension, modification, or revocation of the NWP authorization as outlined in § 330.5. Otherwise, such attempted state withdrawal is not effective and the Corps will consider the state certification to be valid for the NWP authorizations until such time as the NWP is modified or reissued.

(d) Coastal zone management consistency determination. (1) Section 307(c)(1) of the Coastal Zone Management Act (CZMA) requires the Corps to provide a consistency determination and receive state agreement prior to the issuance, reissuance, or expansion of activities authorized by an NWP that authorizes activities within a state with a Federally-approved Coastal Management Program when activities that would occur within, or outside, that state's coastal zone will affect land or water uses or natural resources of the state's coastal zone.

(2) If, prior to the issuance, reissuance, or expansion of activities authorized by an NWP, a state indicates that additional conditions are necessary for the state to agree with the Corps consistency determination, the division engineer will make such conditions regional conditions for the NWP in that state, unless he determines that the conditions do not comply with the provisions of 33 CFR 325.4 or believes for some other specific reason it would be inappropriate to include the conditions. In this case, the state's failure to agree with the Corps consistency determination without the conditions will be considered to be a disagreement with the Corps consistency determination.

(3) When a state has disagreed with the Corps consistency determination, authorization for all such activities occurring within or outside the state's coastal zone that affect land or water uses or natural resources of the state's coastal zone is denied without prejudice until the prospective permittee furnishes the DE an individual consistency certification pursuant to section 307(c)(3) of the CZMA and demonstrates that the state has concurred in it (either on an individual or generic basis), or that concurrence should be presumed (see paragraph (d)(6) of this section).

(4) DEs will take appropriate measures, such as public notices, to inform the public of which activities, waterbodies, or regions require prospective permittees to make an individual consistency determination and seek concurrence from the state.

(5) DEs will not require or process an individual permit application for an activity otherwise qualifying for an NWP solely on the basis that the activity has not received CZMA consistency agreement from the state. However, the district or division engineer may consider that factor, among other appropriate factors, in determining whether to exercise his discretionary authority and require a regional general permit or an individual permit application.

(6) In instances where a state has disagreed with the Corps consistency determination for activities under a particular NWP, permittees must furnish the DE with an individual consistency concurrence or a copy of the consistency certification provided to the state for concurrence. If a state fails to act on a permittee's consistency certification within six months after receipt by the state, concurrence will be presumed. Upon receipt of an individual consistency concurrence or upon presumed consistency, the proposed work is authorized if it complies with all terms and conditions of the NWP. For NWPs requiring a 45-day pre-construction notification the DE will immediately begin, and may complete, his review prior to the state action on the individual consistency certification. If a state indicates that individual conditions are necessary for consistency with the state's Federally-approved coastal management program for that individual activity, the DE will include those conditions as activity-specific conditions of the NWP unless he determines that such conditions do not comply with the provisions of 33 CFR 325.4. In the latter case the DE will consider the conditioned concurrence as a non-concurrence unless the permittee chooses to comply voluntarily with all the conditions in the conditioned concurrence.

(7) Where a state, after agreeing with the Corps consistency determination, subsequently attempts to reverse it's agreement for substantive reasons after the effective date of the NWP, the division engineer will review those reasons and consider whether there is substantial basis for suspension, modification, or revocation as outlined in 33 CFR 330.5. Otherwise, such attempted reversal is not effective and the Corps will consider the state CZMA consistency agreement to be valid for the NWP authorization until such time as the NWP is modified or reissued.

(8) Federal activities must be consistent with a state's Federally-approved coastal management program to the maximum extent practicable. Federal agencies should follow their own procedures and the Department of Commerce regulations appearing at 15 CFR part 930 to meet the requirements of the CZMA. Therefore, the provisions of 33 CFR 330.4(d)(1)-(7) do not apply to Federal activities. Indian tribes doing work on Indian Reservation lands shall be treated in the same manner as Federal applicants.

(e) Discretionary authority. The Corps reserves the right (i.e., discretion) to modify, suspend, or revoke NWP authorizations. Modification means the imposition of additional or revised terms or conditions on the authorization. Suspension means the temporary cancellation of the authorization while a decision is made to either modify, revoke, or reinstate the authorization. Revocation means the cancellation of the authorization. The procedures for modifying, suspending, or revoking NWP authorizations are detailed in § 330.5.

(1) A division engineer may assert discretionary authority by modifying, suspending, or revoking NWP authorizations for a specific geographic area, class of activity, or class of waters within his division, including on a statewide basis, whenever he determines sufficient concerns for the environment under the section 404(b)(1) Guidelines or any other factor of the public interest so requires, or if he otherwise determines that the NWP would result in more than minimal adverse environmental effects either individually or cumulatively.

(2) A DE may assert discretionary authority by modifying, suspending, or revoking NWP authorization for a specific activity whenever he determines sufficient concerns for the environment or any other factor of the public interest so requires. Whenever the DE determines that a proposed specific activity covered by an NWP would have more than minimal individual or cumulative adverse effects on the environment or otherwise may be contrary to the public interest, he must either modify the NWP authorization to reduce or eliminate the adverse impacts, or notify the prospective permittee that the proposed activity is not authorized by NWP and provide instructions on how to seek authorization under a regional general or individual permit.

(3) The division or district engineer will restore authorization under the NWPs at any time he determines that his reason for asserting discretionary authority has been satisfied by a condition, project modification, or new information.

(4) When the Chief of Engineers modifies or reissues an NWP, division engineers must use the procedures of § 330.5 to reassert discretionary authority to reinstate regional conditions or revocation of NWP authorizations for specific geographic areas, class of activities, or class of waters. Division engineers will update existing documentation for each NWP. Upon modification or reissuance of NWPs, previous activity-specific conditions or revocations of NWP authorization will remain in effect unless the DE specifically removes the activity-specific conditions or revocations.

(f) Endangered species. No activity is authorized by any NWP if that activity is likely to jeopardize the continued existence of a threatened or endangered species as listed or proposed for listing under the Federal Endangered Species Act (ESA), or to destroy or adversely modify the critical habitat of such species.

(1) Federal agencies should follow their own procedures for complying with the requirements of the ESA.

(2) Non-federal permittees shall notify the DE if any Federally listed (or proposed for listing) endangered or threatened species or critical habitat might be affected or is in the vicinity of the project. In such cases, the prospective permittee will not begin work under authority of the NWP until notified by the district engineer that the requirements of the Endangered Species Act have been satisfied and that the activity is authorized. If the DE determines that the activity may affect any Federally listed species or critical habitat, the DE must initiate section 7 consultation in accordance with the ESA. In such cases, the DE may:

(i) Initiate section 7 consultation and then, upon completion, authorize the activity under the NWP by adding, if appropriate, activity-specific conditions; or

(ii) Prior to or concurrent with section 7 consultation, assert discretionary authority (see 33 CFR 330.4(e)) and require an individual permit (see 33 CFR 330.5(d)).

(3) Prospective permittees are encouraged to obtain information on the location of threatened or endangered species and their critical habitats from the U.S. Fish and Wildlife Service, Endangered Species Office, and the National Marine Fisheries Service.

(g) Historic properties. No activity which may affect properties listed or properties eligible for listing in the National Register of Historic Places, is authorized until the DE has complied with the provisions of 33 CFR part 325, appendix C.

(1) Federal permittees should follow their own procedures for compliance with the requirements of the National Historic Preservation Act and other Federal historic preservation laws.

(2) Non-federal permittees will notify the DE if the activity may affect historic properties which the National Park Service has listed, determined eligible for listing, or which the prospective permittee has reason to believe may be eligible for listing, on the National Register of Historic Places. In such cases, the prospective permittee will not begin the proposed activity until notified by the DE that the requirements of the National Historic Preservation Act have been satisfied and that the activity is authorized. If a property in the permit area of the activity is determined to be an historic property in accordance with 33 CFR part 325, appendix C, the DE will take into account the effects on such properties in accordance with 33 CFR part 325, appendix C. In such cases, the district engineer may:

(i) After complying with the requirements of 33 CFR part 325, appendix C, authorize the activity under the NWP by adding, if appropriate, activity-specific conditions; or

(ii) Prior to or concurrent with complying with the requirements of 33 CFR part 325, appendix C, he may assert discretionary authority (see 33 CFR 330.4(e)) and instruct the prospective permittee of procedures to seek authorization under a regional general permit or an individual permit. (See 33 CFR 330.5(d).)

(3) The permittee shall immediately notify the DE if, before or during prosecution of the work authorized, he encounters an historic property that has not been listed or determined eligible for listing on the National Register, but which the prospective permittee has reason to believe may be eligible for listing on the National Register.

(4) Prospective permittees are encouraged to obtain information on the location of historic properties from the State Historic Preservation Officer and the National Register of Historic Places.

[56 FR 59134, Nov. 22, 1991, as amended at 78 FR 5733, Jan. 28, 2013]
The 20 cases that cite 33 C.F.R. § 330.4 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENSierra Club v. U.S. Army Corps of Engineers, 909 F.3d 635 (4th Cir. 2018).
cites § 330.4 7×cited by 30 cases
Where it cites § 330.4
“NWP 12, reissued most recently in 2017, 82 Fed. Reg. 1860 (Jan. 6, 2017), authorizes the discharge of dredged or fill material into federal waters attributable to "the construction, maintenance, repair, and removal of utility lines and associated facilities in waters of the…”
The case’s holding
A federal agency lacks authority to substitute its own conditions for state-imposed Clean Water Act certification requirements and a state cannot waive such conditions without notice and comment.
Later courts cite it for
“if the statute is ambiguous, courts then 'move to chevron's second step and defer to the agency's interpretation so long as it is based on a permissible construction of the statute.” · 3 citing courts
2
GREENSierra Club v. U. S. Army Corps of Engineers, 981 F.3d 251 (4th Cir. 2020).
cites § 330.4 4×cited by 8 cases
Where it cites § 330.4
“(quoting 33 C.F.R. § 330.4 (c)(2)). II. In determining whether to grant a stay of an agency action, this court considers (1) “whether the stay applicant has made a strong showing that he is likely to succeed on the merits”; (2) “whether the applicant will be irreparably injured…”
3
GREENCrutchfield v. United States Army Corps of Engineers, 214 F. Supp. 2d 593 (E.D. Va. 2002).
cites § 330.4 8×cited by 6 cases
Where it cites § 330.4
“In support of its decision to verify that the project could proceed under the authority of NWPs notwithstanding that the County had submitted an individual permit application (and, accordingly, that the Corps had proceeded for several months under the regulations applicable…”
The case’s holding
Corps may switch from individual permitting to nationwide permits without notifying interested parties, since no regulation mandates such notice, so the switch is not arbitrary or capricious.
Later courts cite it for
“no precise regulation mandates that the corps must notify interested parties of a decision to switch from the individual permitting mode to the nwp mode.” · 2 citing courts
4
GREENSierra Club v. United States Army Corps of Engineers, 803 F.3d 31 (D.C. Cir. 2015).
cites § 330.4 2×cited by 52 cases
The case’s holding
Federal agencies are not required to conduct a NEPA analysis of an entire project when their regulatory actions only authorize discrete segments of that project.
Later courts cite it for
“requires federal agencies to take a 'hard look' at their proposed actions' environmental consequences in advance of deciding whether and how to proceed.” · 6 citing courts
5
GREENUtah Council v. United States Army Corp. of Engineers, 187 F. Supp. 2d 1334 (D. Utah 2002).
cites § 330.4 7×cited by 4 cases
Where it cites § 330.4
“See 33 C.F.R. § 330.4 (g). Second, General Condition 13 (“Notification”), which applies to NWPs 12 and 26 under certain circumstances, requires the proponent to provide the ACE with a Pre-Construction Notification (“PNC”) as early as possible; where a PNC is required, the…”
6
GREENMohlen v. United States, 74 Fed. Cl. 656 (Fed. Cl. 2006).
cites § 330.4 2×cited by 7 cases
Where it cites § 330.4
“1 (d); see also 33 C.F.R. §§ 330.4 (e) & 330.5. Real Estate Licenses The Secretary of the Army (Secretary) may lease or license a particular use of government property subject to Army control when the Secretary determines that such a use is “convenient and advantageous” to the…”
Later courts cite it for
“the court decides if the governmental action at issue constituted a taking of that property.” · 2 citing courts
7
GREENOhio Valley Env't Coalition v. Hurst, 604 F. Supp. 2d 860 (S.D. W. Va. 2009).
cites § 330.4 1×cited by 18 cases
Where it cites § 330.4
“) As observed by OVEC, the Corps retains discretionary authority to “modify, suspend, or revoke NWP authorizations,” which includes the ability to impose “additional or revised terms or conditions on the authorization,” 33 C.F.R. § 330.4 (e), throughout the life of the…”
Later courts cite it for
“a court conducting judicial review under the apa does not resolve factual questions, but instead determines whether or not as a matter of law the evidence in the administrative record permitted the agency to make the decision it did.” · 7 citing courts
8
GREENCrutchfield v. United States Army Corps of Engineers, 175 F. Supp. 2d 835 (E.D. Va. 2001).
cites § 330.4 1×cited by 12 cases
Where it cites § 330.4
“§ 470f; (6) 33 C.F.R. §§ 330.4 el seq.; and (7) 36 C.”
9
GREENCrutchfield v. United States Army Corps of Engineers, 192 F. Supp. 2d 444 (E.D. Va. 2001).
cites § 330.4 1×cited by 11 cases
Where it cites § 330.4
“§ 470f; (6) 33 C.F.R. §§ 330.4 et seq.; and (7) 36 C.”
10
REDUnited States v. City of Fort Pierre, SD, 580 F. Supp. 1036 (D.S.D. 1983).
cites § 330.4 2×cited by 7 cases
Reversed by United States v. City Of Fort Pierre (1984): the Court of Appeals for the Eighth Circuit's own opinion in this case.
Where it cites § 330.4
“4-2 (a)(1) (1982) is 33 C.F.R. § 330.4 (a)(2) (1983). 6 . The new section number for 33 C.”
11
GREENCrutchfield v. United States Army Corps of Engineers, 154 F. Supp. 2d 878 (E.D. Va. 2001).
cites § 330.4 1×cited by 9 cases
Where it cites § 330.4
“33 C.F.R. § 330.4 (g). Under NHPA regulations, an agency official responsible for NEPA compliance must determine the area of potential effects of the undertaking and then take a series of steps to gather information on that area and evaluate whether the undertaking has an…”
Later courts cite it for
“remarkably illogical conclusion” · 3 citing courts
12
REDOgburn-Matthews v. Loblolly Partners, 505 S.E.2d 598 (S.C. Ct. App. 1998).
cites § 330.4 1×cited by 12 cases
Overruled by Brown v. South Carolina Department of Health & Environmental Control on other grounds: 2 citing opinions limit it to other grounds.
Where it cites § 330.4
“33 C.F.R. § 330.4 (d)(6) (1997). If the state agency does not find the candidate project consistent with state policy, the federal government may make an independent determination that “the activity is consistent with the objectives of [the federal Coastal Zone Management Act]…”
Later courts cite it for
“the requirements of due process include notice, an opportunity to be heard in a meaningful way, and judicial review.” · 3 citing courts
13
GREENIndus. High. Corp. v. Danielson, 796 F. Supp. 121 (D.N.J. 1992).
cites § 330.4 1×cited by 9 cases
Where it cites § 330.4
“33 C.F.R. § 330.4 . At issue in this case is Nationwide Permit 26, published at 33 C.”
14
GREENCrutchfield v. Cnty. of Hanover, 325 F.3d 211 (4th Cir. 2003).
cites § 330.4 1×cited by 19 cases
Where it cites § 330.4
“In view of the foregoing discussion, we have no need to take up appellants’ argument that the Corps’ discretionary authority under 33 C.F.R. § 330.4 (e)(3) also justified its verification of the revised project's eligibility for an NWP.”
Later courts cite it for
“requires a resource-intensive review that entails submission of voluminous application materials, extensive site-specific research and documentation, promulgation of public notice, opportunity for public comment, consultation with other federal agencies, and a formal analysis justifying the ultimate decision to issue or refuse the permit.” · 4 citing courts
15
GREENDonnell v. United States, 834 F. Supp. 19 (D. Me. 1993).
cites § 330.4 1×cited by 7 cases
Where it cites § 330.4
“” 33 C.F.R. § 330.4 (b)(3) (1992). However, state statute, 12 M.”
cites § 330.4 1×subsections: (a)(1)cited by 7 cases
Where it cites § 330.4
“4 acres of wetlands) is permitted under a Department of the Army Nationwide Permit as published in the Federal Register 22 July 1982 (33 C.F.R. 330.4(a)(1)) and prior to that in the 19 July 1977 issue (33 C.”
cites § 330.4 1×cited by 3 cases
Where it cites § 330.4
“”); 33 C.F.R. § 330.4 (c)(1) (2013) ("State 401 water quality certification pursuant to section 401 of the Clean Water Act, or waiver thereof, is required prior to the issuance or reissuance of NWPs authorizing activities which may result in a discharge into waters of the United…”
18
GREENProtect Our Water v. Flowers, 377 F. Supp. 2d 844 (E.D. Cal. 2004).
cites § 330.4 1×subsections: (f)cited by 2 cases
Where it cites § 330.4
“”33 C.F.R. § 330.4(f). General Condition 11 provides that non-federal per-mittees must notify the Corps District Engineer if any listed species or designated critical habitat might be affected by or is in the vicinity of their project, and cannot begin work on the permitted…”
19
GREENUnited States v. Banks, 873 F. Supp. 650 (S.D. Fla. 1995).
cites § 330.4 1×cited by 3 cases
Where it cites § 330.4
“4 or Nationwide Permit 26 and its predecessors, 33 C.F.R. § 330.4 (a)(2) (1982) and 33 C.”
20
GREENRiverside Irrigation Dist. v. Andrews, 758 F.2d 508 (10th Cir. 1985).
cites § 330.4 1×cited by 9 cases
Where it cites § 330.4
“33 C.F.R. § 330.4 . If the conditions are not met, the party must seek an individual permit through a public notice and hearing process.”

Show all 31 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198220042026

One bar per year. Tallest: 3 cases in 2001. 2026 is a partial year. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
E.D. Va.44th Cir.3S.C. Ct. App.2N.D. Ala.110th Cir.17th Cir.18th Cir.1D.C. Cir.1

The 8 courts with the most citing cases, of 25 courts in all.

By subsection
(a)(1)1 case
Pennsylvania Protect Our Water & Env't Resources, Inc. v. Appalachian Reg'l Comm'n, 574 F. Supp. 1203 (M.D. Pa. 1982).“4 acres of wetlands) is permitted under a Department of the Army Nationwide Permit as published in the Federal Register 22 July 1982 (33 C.F.R. 330.4(a)(1)) and prior to that in the 19 July 1977 issue (33 C.”
(e)1 case
United States v. Irizarry, 98 F. Supp. 2d 160 (D.P.R. 2000).
(f)1 case
Protect Our Water v. Flowers, 377 F. Supp. 2d 844 (E.D. Cal. 2004).“”33 C.F.R. § 330.4(f). General Condition 11 provides that non-federal per-mittees must notify the Corps District Engineer if any listed species or designated critical habitat might be affected by or is in the vicinity of their project, and cannot begin work on the permitted…”

Show all 31 citing cases (list view) →

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.

C.F.R. Home  |  Search C.F.R.  |  Search cases for this section  |  syfert.com