U.S. CodeTitle 42Chapter 108— Nuclear Waste PolicySubchapter III— Other Provisions Relating to Radioactive Waste

42 U.S.C. § 10221 (2026)

Mission plan

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1986–2012 10citing cases
At a glance

Courts have cited this section in 10 opinions since 1986.

(a) Contents of mission planThe Secretary shall prepare a comprehensive report, to be known as the mission plan, which shall provide an informational basis sufficient to permit informed decisions to be made in carrying out the repository program and the research, development, and demonstration programs required under this chapter. The mission plan shall include—(1) an identification of the primary scientific, engineering, and technical information, including any necessary demonstration of engineering or systems integration, with respect to the siting and construction of a test and evaluation facility and repositories;(2) an identification of any information described in paragraph (1) that is not available because of any unresolved scientific, engineering, or technical questions, or undemonstrated engineering or systems integration, a schedule including specific major milestones for the research, development, and technology demonstration program required under this chapter and any additional activities to be undertaken to provide such information, a schedule for the activities necessary to achieve important programmatic milestones, and an estimate of the costs required to carry out such research, development, and demonstration programs;(3) an evaluation of financial, political, legal, or institutional problems that may impede the implementation of this chapter, the plans of the Secretary to resolve such problems, and recommendations for any necessary legislation to resolve such problems;(4) any comments of the Secretary with respect to the purpose and program of the test and evaluation facility;(5) a discussion of the significant results of research and development programs conducted and the implications for each of the different geologic media under consideration for the siting of repositories, and, on the basis of such information, a comparison of the advantages and disadvantages associated with the use of such media for repository sites;(6) the guidelines issued under section 10132(a) of this title;(7) a description of known sites at which site characterization activities should be undertaken, a description of such siting characterization activities, including the extent of planned excavations, plans for onsite testing with radioactive or nonradioactive material, plans for any investigations activities which may affect the capability of any such site to isolate high-level radioactive waste or spent nuclear fuel, plans to control any adverse, safety-related impacts from such site characterization activities, and plans for the decontamination and decommissioning of such site if it is determined unsuitable for licensing as a repository;(8) an identification of the process for solidifying high-level radioactive waste or packaging spent nuclear fuel, including a summary and analysis of the data to support the selection of the solidification process and packaging techniques, an analysis of the requirements for the number of solidification packaging facilities needed, a description of the state of the art for the materials proposed to be used in packaging such waste or spent fuel and the availability of such materials including impacts on strategic supplies and any requirements for new or reactivated facilities to produce any such materials needed, and a description of a plan, and the schedule for implementing such plan, for an aggressive research and development program to provide when needed a high-integrity disposal package at a reasonable price;(9) an estimate of (A) the total repository capacity required to safely accommodate the disposal of all high-level radioactive waste and spent nuclear fuel expected to be generated through December 31, 2020, in the event that no commercial reprocessing of spent nuclear fuel occurs, as well as the repository capacity that will be required if such reprocessing does occur; (B) the number and type of repositories required to be constructed to provide such disposal capacity; (C) a schedule for the construction of such repositories; and (D) an estimate of the period during which each repository listed in such schedule will be accepting high-level radioactive waste or spent nuclear fuel for disposal;(10) an estimate, on an annual basis, of the costs required (A) to construct and operate the repositories anticipated to be needed under paragraph (9) based on each of the assumptions referred to in such paragraph; (B) to construct and operate a test and evaluation facility, or any other facilities, other than repositories described in subparagraph (A), determined to be necessary; and (C) to carry out any other activities under this chapter; and(11) an identification of the possible adverse economic and other impacts to the State or Indian tribe involved that may arise from the development of a test and evaluation facility or repository at a site.(b) Submission of mission plan(1) Not later than 15 months after January 7, 1983, the Secretary shall submit a draft mission plan to the States, the affected Indian tribes, the Commission, and other Government agencies as the Secretary deems appropriate for their comments.(2) In preparing any comments on the mission plan, such agencies shall specify with precision any objections that they may have. Upon submission of the mission plan to such agencies, the Secretary shall publish a notice in the Federal Register of the submission of the mission plan and of its availability for public inspection, and, upon receipt of any comments of such agencies respecting the mission plan, the Secretary shall publish a notice in the Federal Register of the receipt of comments and of the availability of the comments for public inspection. If the Secretary does not revise the mission plan to meet objections specified in such comments, the Secretary shall publish in the Federal Register a detailed statement for not so revising the mission plan.(3) The Secretary, after reviewing any other comments made by such agencies and revising the mission plan to the extent that the Secretary may consider to be appropriate, shall submit the mission plan to the appropriate committees of the Congress not later than 17 months after January 7, 1983. The mission plan shall be used by the Secretary at the end of the first period of 30 calendar days (not including any day on which either House of Congress is not in session because of adjournment of more than 3 calendar days to a day certain) following receipt of the mission plan by the Congress.(Pub. L. 97–425, title III, § 301, Jan. 7, 1983, 96 Stat. 2255.)
The 10 cases that cite 42 U.S.C. § 10221 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENPac. Gas & Elec. Co. v. United States, 73 Fed. Cl. 333 (Fed. Cl. 2006).
cites § 10221 3×cited by 37 cases
Where it cites § 10221
“” 42 U.S.C. § 10221 (b)(1). The Mission plan was to “provide an informational basis sufficient to permit informed decisions to be made in carrying out the repository program and the research, development, and demonstration programs required under th[e NWPA].”
The case’s holding
A court may not speculate on whether deferred costs will increase or decrease by the time a breaching party eventually performs a contract.
Later courts cite it for
“plaintiffs loading costs have been deferred rather than avoided, and the court declines to engage in a guessing game as to whether such deferred costs will have increased or decreased by the time (if ever) defendant performs.” · 2 citing courts
2
GREENCarolina Power & Light Co. v. United States, 82 Fed. Cl. 23 (Fed. Cl. 2008).
cites § 10221 2×cited by 28 cases
Where it cites § 10221
“*31 The NWPA required DOE to prepare the mission plan to provide an “informational basis sufficient to permit informed decisions to be made in carrying out the repository program____” 42 U.S.C. § 10221 (a). Congress required the mission plan to include, among other things, an…”
The case’s holding
A non-breaching party may recover reasonable and foreseeable costs incurred to mitigate damages but cannot recover forecasted future costs.
Later courts cite it for
“overhead, by definition, is a cost of doing business, and for some period of time, part of the utility's 'business' was mitigating doe's partial breach.” · 3 citing courts
3
GREENS. Nuclear Operating Co. v. United States, 77 Fed. Cl. 396 (Fed. Cl. 2007).
cites § 10221 1×cited by 42 cases
Where it cites § 10221
“See 42 U.S.C. § 10221 (b). . The Standard Contract requires the SNF to be cooled for five years before acceptance disposal by DOE.”
The case’s holding
Mitigation costs are recoverable if the general response to a breach is foreseeable, even if the specific implementation of the mitigating decision is not.
Later courts cite it for
“while the general response to a breach must be foreseen, the particular way that a mitigating decision is implemented need not.” · 7 citing courts
4
GREENYankee Atomic Elec. Co. v. United States, 73 Fed. Cl. 249 (Fed. Cl. 2006).
cites § 10221 1×cited by 32 cases
Where it cites § 10221
“” 42 U.S.C. § 10221 (a). (Def.’s Resp. to YA PFF 60.”
The case’s holding
Mitigation costs for additional at-reactor storage are recoverable if the need for such expenditures was reasonably foreseeable to the breaching party at the time of contracting.
Later courts cite it for
“foreseeable to doe at the time of contracting.” · 2 citing courts
5
GREENSys. Fuels, Inc. v. United States, 79 Fed. Cl. 37 (Fed. Cl. 2007).
cites § 10221 1×cited by 31 cases
Where it cites § 10221
“The resulting draft mission plan and other early program documents prepared by DOE assumed performance with two repositories at which 6,000 MTU/per year would be deposited in aggregate. Def.’s Post-Trial Br. at 32 (citing PX 7-B) (DOE, Draft Civilian Radioactive Waste Management…”
The case’s holding
The government must demonstrate with reasonable certainty that claimed benefits exist to offset costs, as speculative claims are insufficient (establishing the standard for offsetting benefits).
Later courts cite it for
“any 'benefits' the government seeks to offset must be shown to a reasonable certainty, or they must be denied as too speculative to meet the standards set forth by the federal circuit in indiana michigan.” · 2 citing courts
6
GREENN. States Power Co. v. United States, 78 Fed. Cl. 449 (Fed. Cl. 2007).
cites § 10221 1×cited by 24 cases
Where it cites § 10221
“42 U.S.C. § 10221 (a). . The Act required DOE to conduct a study of the need for and the feasibility of constructing an MRS facility and to submit a proposal to Congress by June 1, 1985, for the siting, development, construction, and operation of one or more MRS facilities.”
The case’s holding
A party's duty to mitigate partial breach arises once it has reason to know performance will not be forthcoming, and recoverable mitigation costs must be foreseeable, caused by the breach, and reasonable.
7
GREENWisconsin Elec. Power Co. v. United States, 90 Fed. Cl. 714 (Fed. Cl. 2009).
cites § 10221 1×cited by 24 cases
Where it cites § 10221
“” 42 U.S.C. § 10221 (a). . Reduction of the inventory of SNF stored in utilities' wet pools was necessary to allow for eventual plant shut-down and decommissioning which returns the site to its previous state.”
The case’s holding
A party may recover reasonable mitigation costs incurred to limit damages from a partial breach, where those costs were reasonably foreseeable, substantially caused by the breach, and proven with reasonable certainty.
Later courts cite it for
“would have occurred in 1999 even if doe had begun performance in 1998.” · 5 citing courts
8
GREENDominion Resources, Inc. v. United States, 84 Fed. Cl. 259 (Fed. Cl. 2008).
cites § 10221 1×cited by 18 cases
Where it cites § 10221
“” 42 U.S.C. § 10221 (a). These mission plans would serve “as a means of both planning the program and demonstrating its conformance to the requirements of the Act.”
The case’s holding
Overhead costs are recoverable if a utility demonstrates that the costs were incurred and are properly attributable to mitigation projects and activities.
Later courts cite it for
“overhead costs are recoverable as long as a utility can demonstrate that 'overhead costs were incurred and are properly attributable to mitigation projects and activities.” · 4 citing courts
9
GREENLescoe v. Pennsylvania Dep't of Corr.-SCI Frackville, 464 F. App'x 50 (3d Cir. 2012).
cites § 10221 1×cited by 9 casesunpublished
Where it cites § 10221
“Charles Lescoe (“Lescoe”) is appealing this case from a Memorandum and Order adopting the Report and Recommendation from Magistrate Judge Mannion granting summary judgment to the Department of Corrections—SCI Frackville (“DOC”) for his claims under the Americans with…”
Later courts cite it for
“this court has not definitively reached a position regarding whether obesity is a disability under the , ada that limits a major life activity.” · 2 citing courts
10
GREENTennessee v. Herrington, 806 F.2d 642 (6th Cir. 1986).
cites § 10221 1×cited by 24 cases
Where it cites § 10221
“§ 10134 , completion of a mission plan scheduling major steps, 42 U.S.C. § 10221 , and the initial acceptance of nuclear waste, 42 U.”
Later courts cite it for
“the overall structure of the nwpa ... a consistent concern for timely implementation of the disposal provisions” · 3 citing courts

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198619992012

One bar per year. Tallest: 3 cases in 2007. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Fed. Cl.83rd Cir.16th Cir.1
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments
(Pub. L. 97–425, title III, § 301, Jan. 7, 1983, 96 Stat. 2255.)