U.S.C. homeSearch U.S. Code
U.S. CodeTitle 42Chapter 108— Nuclear Waste PolicySubchapter I— Disposal and Storage of High-Level Radioactive Waste, Spent Nuclear Fuel, And Low-Level Radioactive WastePart C— Monitored Retrievable Storage

42 U.S.C. § 10161 (2026)

Monitored retrievable storage

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1985–2007 12citing cases
At a glance

Courts have cited this section in 12 opinions since 1985.

(a) FindingsThe Congress finds that—(1) long-term storage of high-level radioactive waste or spent nuclear fuel in monitored retrievable storage facilities is an option for providing safe and reliable management of such waste or spent fuel;(2) the executive branch and the Congress should proceed as expeditiously as possible to consider fully a proposal for construction of one or more monitored retrievable storage facilities to provide such long-term storage;(3) the Federal Government has the responsibility to ensure that site-specific designs for such facilities are available as provided in this section;(4) the generators and owners of the high-level radioactive waste and spent nuclear fuel to be stored in such facilities have the responsibility to pay the costs of the long-term storage of such waste and spent fuel; and(5) disposal of high-level radioactive waste and spent nuclear fuel in a repository developed under this chapter should proceed regardless of any construction of a monitored retrievable storage facility pursuant to this section.(b) Submission of proposal by Secretary(1) On or before June 1, 1985, the Secretary shall complete a detailed study of the need for and feasibility of, and shall submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high-level radioactive waste and spent nuclear fuel. Each such facility shall be designed—(A) to accommodate spent nuclear fuel and high-level radioactive waste resulting from civilian nuclear activities;(B) to permit continuous monitoring, management, and maintenance of such spent fuel and waste for the foreseeable future;(C) to provide for the ready retrieval of such spent fuel and waste for further processing or disposal; and(D) to safely store such spent fuel and waste as long as may be necessary by maintaining such facility through appropriate means, including any required replacement of such facility.(2) Such proposal shall include—(A) the establishment of a Federal program for the siting, development, construction, and operation of facilities capable of safely storing high-level radioactive waste and spent nuclear fuel, which facilities are to be licensed by the Commission;(B) a plan for the funding of the construction and operation of such facilities, which plan shall provide that the costs of such activities shall be borne by the generators and owners of the high-level radioactive waste and spent nuclear fuel to be stored in such facilities;(C) site-specific designs, specifications, and cost estimates sufficient to (i) solicit bids for the construction of the first such facility; (ii) support congressional authorization of the construction of such facility; and (iii) enable completion and operation of such facility as soon as practicable following congressional authorization of such facility; and(D) a plan for integrating facilities constructed pursuant to this section with other storage and disposal facilities authorized in this chapter.(3) In formulating such proposal, the Secretary shall consult with the Commission and the Administrator, and shall submit their comments on such proposal to the Congress at the time such proposal is submitted.(4) The proposal shall include, for the first such facility, at least 3 alternative sites and at least 5 alternative combinations of such proposed sites and facility designs consistent with the criteria of paragraph (1). The Secretary shall recommend the combination among the alternatives that the Secretary deems preferable. The environmental assessment under subsection (c) shall include a full analysis of the relative advantages and disadvantages of all 5 such alternative combinations of proposed sites and proposed facility designs.(c) Environmental impact statements(1) Preparation and submission to the Congress of the proposal required in this section shall not require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)). The Secretary shall prepare, in accordance with regulations issued by the Secretary implementing such Act [42 U.S.C. 4321 et seq.], an environmental assessment with respect to such proposal. Such environmental assessment shall be based upon available information regarding alternative technologies for the storage of spent nuclear fuel and high-level radioactive waste. The Secretary shall submit such environmental assessment to the Congress at the time such proposal is submitted.(2) If the Congress by law, after review of the proposal submitted by the Secretary under subsection (b), specifically authorizes construction of a monitored retrievable storage facility, the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) shall apply with respect to construction of such facility, except that any environmental impact statement prepared with respect to such facility shall not be required to consider the need for such facility or any alternative to the design criteria for such facility set forth in subsection (b)(1).(d) Licensing

Any facility authorized pursuant to this section shall be subject to licensing under section 5842(3) of this title. In reviewing the application filed by the Secretary for licensing of the first such facility, the Commission may not consider the need for such facility or any alternative to the design criteria for such facility set forth in subsection (b)(1).

(e) Clarification

Nothing in this section limits the consideration of alternative facility designs consistent with the criteria of paragraph (b)(1) in any environmental impact statement, or in any licensing procedure of the Commission, with respect to any monitored, retrievable facility authorized pursuant to this section.

(f) Impact assistance(1) Upon receipt by the Secretary of congressional authorization to construct a facility described in subsection (b), the Secretary shall commence making annual impact aid payments to appropriate units of general local government in order to mitigate any social or economic impacts resulting from the construction and subsequent operation of any such facility within the jurisdictional boundaries of any such unit.(2) Payments made available to units of general local government under this subsection shall be—(A) allocated in a fair and equitable manner, with priority given to units of general local government determined by the Secretary to be most severely affected; and(B) utilized by units of general local government only for planning, construction, maintenance, and provision of public services related to the siting of such facility.(3) Such payments shall be subject to such terms and conditions as the Secretary determines are necessary to ensure achievement of the purposes of this subsection. The Secretary shall issue such regulations as may be necessary to carry out the provisions of this subsection.(4) Such payments shall be made available entirely from funds held in the Nuclear Waste Fund established in section 10222(c) of this title and shall be available only to the extent provided in advance in appropriation Acts.(5) The Secretary may consult with appropriate units of general local government in advance of commencement of construction of any such facility in an effort to determine the level of payments each such unit is eligible to receive under this subsection.(g) Limitation

No monitored retrievable storage facility developed pursuant to this section may be constructed in any State in which there is located any site approved for site characterization under section 10132 of this title. The restriction in the preceding sentence shall only apply until such time as the Secretary decides that such candidate site is no longer a candidate site under consideration for development as a repository. Such restriction shall continue to apply to any site selected for construction as a repository.

(h) Participation of States and Indian tribes

Any facility authorized pursuant to this section shall be subject to the provisions of sections 10135, 10136(a), 10136(b), 10136(d), 10137, and 10138 of this title. For purposes of carrying out the provisions of this subsection, any reference in sections 10135 through 10138 of this title to a repository shall be considered to refer to a monitored retrievable storage facility.

(Pub. L. 97–425, title I, § 141, Jan. 7, 1983, 96 Stat. 2241.)Editorial NotesReferences in Text

The National Environmental Policy Act of 1969, referred to in subsec. (c), is Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to chapter 55 (§ 4321 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of this title and Tables.

The 12 cases that cite 42 U.S.C. § 10161 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
REDState of Tenn. v. Herrington, 626 F. Supp. 1345 (M.D. Tenn. 1986).
cites § 10161 27×cited by 6 cases
Reversed by Tennessee v. Herrington (1986): the Court of Appeals for the Sixth Circuit's own opinion in this case.
Where it cites § 10161
“The specific question before the Court is whether the State of Tennessee is entitled to a declaratory judgment that the Secretary violated the provisions of section 141(h) of the Act, 42 U.S.C. § 10161 (h), in making his determination as to the preferred site of the MRS…”
Later courts cite it for
“inartful drafting of the nwpa makes a search for the answers” · 2 citing courts
2
GREENPac. Gas & Elec. Co. v. United States, 73 Fed. Cl. 333 (Fed. Cl. 2006).
cites § 10161 2×cited by 37 cases
Where it cites § 10161
“11 See 42 U.S.C. § 10161 (b). Congress found that “long-term storage of [HLW] or [SNF] in [MRS] facilities is an option for providing safe and reliable management of such waste or spent fuel.”
The case’s holding
A court may not speculate on whether deferred costs will increase or decrease by the time a breaching party eventually performs a contract.
Later courts cite it for
“plaintiffs loading costs have been deferred rather than avoided, and the court declines to engage in a guessing game as to whether such deferred costs will have increased or decreased by the time (if ever) defendant performs.” · 2 citing courts
3
GREENCommonwealth Edison Co. v. United States, 56 Fed. Cl. 652 (Fed. Cl. 2003).
cites § 10161 1×cited by 55 cases
Where it cites § 10161
“See 42 U.S.C. §§ 10161 , 10168(d)(3). The licensing conditions to obtain authorization for the construction of a MRS required that “construction [of a MRS] may not begin until the [NRC] has issued a license for the construction of a [permanent] repository.”
The case’s holding
The concept of a taking has limited application when the parties' rights are voluntarily created by contract and interference with those rights generally gives rise to a breach of contract claim.
Later courts cite it for
“although plaintiff may have real property interests that are separate from its interests under the standard contract, plaintiff does not have a takings claim absent the rights and obligations granted to the parties by the standard contract.” · 2 citing courts
4
GREENS. Nuclear Operating Co. v. United States, 77 Fed. Cl. 396 (Fed. Cl. 2007).
cites § 10161 1×cited by 42 cases
Where it cites § 10161
“” (PX 37 at 3-B-l (citing 42 U.S.C. § 10161 (a)(1)) (requiring a study and proposal be submitted to Congress by June 1, 1985).”
The case’s holding
Mitigation costs are recoverable if the general response to a breach is foreseeable, even if the specific implementation of the mitigating decision is not.
Later courts cite it for
“while the general response to a breach must be foreseen, the particular way that a mitigating decision is implemented need not.” · 7 citing courts
5
GREENTennessee v. Herrington, 806 F.2d 642 (6th Cir. 1986).
cites § 10161 8×cited by 24 cases
Where it cites § 10161
“42 U.S.C. § 10161 . Although the construction of permanent repositories is automatically authorized by the NWPA, see 42 U.”
Later courts cite it for
“the overall structure of the nwpa ... a consistent concern for timely implementation of the disposal provisions” · 3 citing courts
6
GREENN. States Power Co. v. United States, 78 Fed. Cl. 449 (Fed. Cl. 2007).
cites § 10161 1×cited by 24 cases
Where it cites § 10161
“42 U.S.C. § 10161 (b)(1). . On December 22, 1987, Congress enacted the Nuclear Waste Policy Amendments Act of 1987 (the “Amendments Act”), Pub.”
The case’s holding
A party's duty to mitigate partial breach arises once it has reason to know performance will not be forthcoming, and recoverable mitigation costs must be foreseeable, caused by the breach, and reasonable.
7
GREENSys. Fuels, Inc. v. United States, 78 Fed. Cl. 769 (Fed. Cl. 2007).
cites § 10161 1×cited by 21 cases
Where it cites § 10161
“See 42 U.S.C. § 10161 (b) (“On or before June 1, 1985, the Secretary shall complete a detailed study of the need for and feasibility of, and shall submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high-level…”
The case’s holding
A private party to a government contract may recover interest on borrowed funds used to mitigate a breach if causation is established.
Later courts cite it for
“if causation is established, a private party to a government contract may recover an amount charged by a lender for borrowed funds that were obtained to mitigate a breach of contract.” · 2 citing courts
8
GREENSys. Fuels, Inc. v. United States, 79 Fed. Cl. 182 (Fed. Cl. 2007).
cites § 10161 1×cited by 21 cases
Where it cites § 10161
“2241 (codified at 42 U.S.C. § 10161 (b)(1)); see also id. at § 220, 96 Stat.”
Later courts cite it for
“a court may grant such a motion when the movant shows '(1) that an intervening change in the controlling law has occurred; (2) that previously unavailable evidence is now available; or (3) that the motion is necessary to prevent manifest injustice.” · 9 citing courts
9
GREENTennessee v. Herrington, 622 F. Supp. 923 (M.D. Tenn. 1985).
cites § 10161 5×cited by 3 cases
Where it cites § 10161
“42 U.S.C. § 10161 (1982). . The NWPA authorizes the development of permanent repositories in sections 111-125, comprising Part A, "Repositories for Disposal of High-Level Radioactive Waste and Spent Nuclear Fuel,” of Subchapter I.”
Later courts cite it for
“if original jurisdiction over mrs actions was vested in the court of appeals, the court of appeals for the sixth circuit would be compelled to hear proof in this case on the issue of whether or not the secretary of energy followed the proper statutory procedures in identifying sites in tennessee as candidates for mrs installations.” · 2 citing courts
10
GREENTRW Env't Saf. Sys., Inc. v. United States, 18 Cl. Ct. 33 (Ct. Cl. 1989).
cites § 10161 1×cited by 27 cases
Where it cites § 10161
“I 959-60; 42 U.S.C. § 10161 ). This change led to a second notice published in the CBD on April 1, 1987, referring to the “Systems Engineering, Development and Management Contractor” (DX 18).”
The case’s holding
An unsuccessful bidder must show prejudice: that a procurement violation adversely affected its chances of selection, so a harmless violation does not overturn a contract award.
Later courts cite it for
“generally, the requirement of proving prejudice prevents an unsuccessful bidder from overturning a contract award due to a harmless violation of a statute or regulation on the part of the government.” · 6 citing courts
cites § 10161 1×cited by 12 cases
Where it cites § 10161
“42 U.S.C. § 10161 (b)(1). Section 10161 of the Act contains all of the express provisions relating to MRS, but does not expressly state that MRS facilities are subject to the jurisdictional provisions of § 10139(a).”
Later courts cite it for
“nwpa's provision for judicial review is limited to decisions 'under' the part, or at least under the act when the decision is pursuant to a part of the act and relates to the purposes of the part in which the judicial review provision is placed.” · 2 citing courts
12
GREENNevada v. Dep't of Energy, 400 F.3d 9 (D.C. Cir. 2005).
cites § 10161 1×cited by 15 cases
Where it cites § 10161
“at 49 (quoting 42 U.S.C. § 10161 (f)(4)), shows that Congress must not have required appropriations when it used the less explicit “subject to appropriations” language in section 302.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198519962007

One bar per year. Tallest: 4 cases in 2007. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Fed. Cl.6M.D. Tenn.26th Cir.19th Cir.1D.C. Cir.1Ct. Cl.1
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments
(Pub. L. 97–425, title I, § 141, Jan. 7, 1983, 96 Stat. 2241.)
Versions

Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.

U.S.C. Home  |  Search U.S. Code  |  Search cases for this section  |  syfert.com