Vermont Statutes Annotated

Vt. Stat. Ann. tit. 30, § 202 (2026)

✓ current as of May 2026
Find cases: SyfertCases citing this section VT-LEGlegislature.vermont.gov JustiaTitle on Justia CornellLII Search CasesGoogle Scholar

Subchapter 001 : GENERAL POWERS

(Cite as: 30 V.S.A. § 202)
Notes of Decisions
Cited in 5 cases, 1973–1985 · leading case: Petition of Green Mountain Power Corp., 305 A.2d 571 (Vt. 1973).
Sort: Relevance Newest Treatment
Petition of Green Mountain Power Corp., 305 A.2d 571 (Vt. 1973). · cites it 4× “§§ 202 and 209(3) to institute an investigation of methods and facilities of operation so as to produce better service and reduced costs, thereby minimizing the likelihood of additional rate increases. Pursuant to 30 V.S.A. § 202, the Board is designated the principal planning…”
In Re Consol. Rate Appeals of Green Mountain Power Corp., 455 A.2d 823 (Vt. 1983). · cites it 2× “At the time these proceedings commenced, the Board’s functions were, in part, described as follows in 30 V.S.A. § 202(b) (1970): The board’s duties shall include surveys to determine needed and desirable plant improvements and extensions, interconnections and coordination…”
Vermont Elec. Power Co., Inc. v. Bandel, 375 A.2d 975 (Vt. 1977). “Preventive concern calls for the development of firm capacity. Under the evidence in the case, this is not available from the gas turbine generator, since it is of uncertain operation and intended for use only for peaking generation.”
City of So. Burlington v. Vermont Elec. Power Co., Inc., 344 A.2d 19 (Vt. 1975). “30 V.S.A. § 202 makes the Board the responsible planning agency of the state for obtaining proper' utility service.”
In re Vermont Elec. Generation & Transmission Coop., Inc., 502 A.2d 841 (Vt. 1985). · cites it 4× “30 V.S.A. § 202 provides in part as follows: (b) The department, through the director, shall prepare an electrical energy plan for the state.”
— Vt. Stat. Ann. tit. 30, § 202(b) — 1 case
In Re Consol. Rate Appeals of Green Mountain Power Corp., 455 A.2d 823 (Vt. 1983). “At the time these proceedings commenced, the Board’s functions were, in part, described as follows in 30 V.S.A. § 202(b) (1970): The board’s duties shall include surveys to determine needed and desirable plant improvements and extensions, interconnections and coordination…”
— Vt. Stat. Ann. tit. 30, § 202(c) — 1 case
In Re Consol. Rate Appeals of Green Mountain Power Corp., 455 A.2d 823 (Vt. 1983). “At the time these proceedings commenced, the Board’s functions were, in part, described as follows in 30 V.S.A. § 202(b) (1970): The board’s duties shall include surveys to determine needed and desirable plant improvements and extensions, interconnections and coordination…”
— Vt. Stat. Ann. tit. 30, § 202(f) — 1 case
In re Vermont Elec. Generation & Transmission Coop., Inc., 502 A.2d 841 (Vt. 1985). “30 V.S.A. § 202 provides in part as follows: (b) The department, through the director, shall prepare an electrical energy plan for the state.”
— Vt. Stat. Ann. tit. 30, § 202(g) — 1 case
In re Vermont Elec. Generation & Transmission Coop., Inc., 502 A.2d 841 (Vt. 1985). “30 V.S.A. § 202 provides in part as follows: (b) The department, through the director, shall prepare an electrical energy plan for the state.”
Annotations are extracted automatically from the opinions in the Syfert caselaw corpus and ranked by authority, recency, and treatment. Dots show Syfertize treatment of the citing case itself.